Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML101460510 + (PSEGs NRC ISFSI Presentation May 27, 2010)
- ML043500645 + (PSEGs Preliminary Responses to NRC Staff Questions Regarding B Recirculation Pump Vibration)
- ML19107A346 + (PSI/ISI-ALT-06, Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds, Proprietary Information Withholding)
- ML18319A307 + (PSNN-2018-0209: FPG-TRT-C51-0101, Rev. 3,Qualification Test Summary Report)
- ML18319A308 + (PSNN-2018-0209: UTLR-0020NP Part II, Rev. 4, Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application - Part II, Design Description of the Platform with Application Guide)
- ML18319A309 + (PSNN-2018-0209: UTLR-0020NP Part III, Rev. 3, Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application - Part III, Qualification Results of the BWR-5 PRM and the ABWR Oprm)
- ML18319A310 + (PSNN-2018-0209: UTLR-0020NP Part IV, Rev. 3, Licensing Topical Report for Toshiba NRW-FPGA-based Instrumentation and Control System for Safety-Related Application - Part IV, Compliance to the Codes and Standards)
- ML18319A306 + (PSNN-2018-0219: Toshiba - Enclosure 13 - RAI Response)
- ML18319A314 + (PSNN-2018-0439: FPG-PLN-C51-0005, Rev. 5, Master Test Plan)
- ML18319A311 + (PSNN-2018-0439: fPG-RQS-C51-0001, Rev. 8, Equipment Requirement Specification of Fpga Based Units)
- ML18319A312 + (PSNN-2018-0480: FC51-3002-1000, Rev. 6, Equipment Design Specification for Power Range Neutron Monitor)
- ML18319A316 + (PSNN-2018-0480: FC51-3809-1000, Rev. 2, Calculation: Availability/Reliability Analysis Report for Safety-Related Oscillation Power Range Monitor (Oprm))
- ML18319A313 + (PSNN-2018-0480: FC51-7012-1000, Rev. 3, Nuclear Instrumentation & Control Systems Department Equipment Qualification Test Plan for Safety-Related Oscillation Power Range Monitor (Oprm))
- ML18319A315 + (PSNN-2018-0804: FPG-TRT-C51-0002, Rev. 1, Availability/Reliability Analysis Report)
- ML20045D109 + (PSP Pre-Submittal Meeting Jan 31 2020 HDI)
- EPID:L-2019-LRM-0008 + (PSP Pre-Submittal Meeting Jan 31 2020 Hdi)
- ML15169A358 + (PSP Rev 14 Technical Review 06-11-15)
- ML19309F920 + (PT 21 Rept Re Linear Magnetic Indication at Bottom of Reactor Coolant Pump Main Flange Bolt Threads.Bolt Will Be Scrapped or Defaced & Used for Testing)
- ML090370920 + (PT Curve Acceptability of Monticello Data for Benchmarking)
- ML20244A010 + (PT-082820-190 Attachment 1 Comments on Draft SE for Remote Source Verification Topical Report.Docx)
- ML20244A008 + (PT-082820-190 Attachment 2 Red Line Draft SE for EPRI Remote Source Verification Topical Report)
- ML24332A008 + (PTLR SER in Support of NuScale SDAA Section 5.3)
- ML090640302 + (PTLR-1, Revision 0, Nine Mile Point Unit 1 Pressure and Temperature Limits Report (Ptlr))
- L-2005-171, PTN-ENG-SEIJ-04-073, Rev a, Florida Power & Light Co. Proposed License Amendment Support Evaluation of Design Inputs Utilized for Westinghouse Licensing Report + (PTN-ENG-SEIJ-04-073, Rev a, Florida Power & Light Co. Proposed License Amendment Support Evaluation of Design Inputs Utilized for Westinghouse Licensing Report)
- ML110980526 + (PTS Evaluation - ME5263 - Request for Additional Information)
- ML21245A403 + (PTS Issp Review)
- ML092730264 + (PU-Plant Dock Airlock)
- ML092720472 + (PU-Plant Maintenance Shop (Room, 116))
- ML092720491 + (PU-Plant Production Hallway)
- ML092720455 + (PU-Plant Room 121- Used for Fuel Rod Cleaning, Final Inspection, and Storage)
- ML092720456 + (PU-Plant Room 122 - Used to X-ray the Fuel Rods After Welding, and Room 123 - Used to Load and Weld Fuel Rods)
- ML092720473 + (PU-Plant Room 124, Contained Pellet Presses, Calciner, Harper Furnace, Pellet Grinder, Inspection Gloveboxes and Outgas Furnace)
- ML092720436 + (PU-Plant Room Exhaust System)
- ML092730267 + (PU-Plant Supply Fan Room (MCC))
- ML15329A287 + (PUR-1 Digital IC Upgrade - NRC Phase 0 Meeting - November 6 2015)
- ML15329A288 + (PUR-1 Digital IC Upgrade Technical Details - NRC Phase 0 Meeting - v2 - November 6 2015)
- ML15329A289 + (PUR-1 Overview - NRC Phase 0 Meeting - November 6 2015)
- ML120730262 + (PV - 03/2012 - Examination Approval)
- ML103080946 + (PV - 2010-11 - Examination Approval Letter)
- ML030310606 + (PV - Init Exam - 11/2002 - Public Forms)
- ML023370247 + (PV 11/2002 Examination Analysis)
- ML023370571 + (PV 11/2002 Written Examination Comments for Clarification During Examination)
- ML20042C045 + (PV 2019-10 Draft Op Test Comments Delayed Release Until March 2022)
- ML20042C046 + (PV 2019-10 Draft Written Comments Delayed Release Until March 2022)
- ML21028A440 + (PV 2020 004 Integrated Inspection Report CAP)
- IR 05000528/2021001 + (PV 2021001, Palo Verde Nuclear Generating Station - Integrated Inspection Report 05000528/2021001 and 05000529/2021001 and 05000530/2021001)
- ML24348A225 + (PV 21N 05 Request for Information Letter (Deterministic))
- ML20223A150 + (PV Docs Request Access Control- Sep 2020)
- ML20266C604 + (PV Ventilation Systems Piping Reactor Bldg Penetrations X 25 & X 220 Class II N Piping)
- ML20266C666 + (PV Ventilation Systems Piping Reactor Bldg)
- ML20266C656 + (PV Ventilation Systems Piping Reactor Bldg)