ML19309F920

From kanterella
Jump to navigation Jump to search
PT 21 Rept Re Linear Magnetic Indication at Bottom of Reactor Coolant Pump Main Flange Bolt Threads.Bolt Will Be Scrapped or Defaced & Used for Testing
ML19309F920
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/10/1980
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To:
References
REF-PT21-80-209-000 NUDOCS 8005020001
Download: ML19309F920 (1)


Text

80U6020 ggy,.

ATTACWD IS A F%RT 21 REPORT FROM IE f%IL UNIT - ROOM 359E/W PART 21 IDSiflf."AT10ft 10, 7o - Ao9 -oo o C0fPANY tWEPod/~/LJ IMTE OF LETIER 4/io / r o D00Ef 10. so - 3 W DATE DISTRIHJTED 4/iy/ ro ORIGINAL REPORT Z SUPPLBEffARY E DISTRIBJTIO'l:

P2NIORGO 2 REL CYCE & [

SAEGUARDS(S) ]

FATERIALSOD IER/IDR, HECTOR

/0/ FREI-AD/SG-lE ilRR/DRi DIP 2CTOR tt.ES/ FOE AD/ROI AD/FOI ( 2 )

EG10'!S REGIONS AD/TCI IE FIES '

l!RR/IDR, DIRECTOR P2GI0'S PDR MiSS/SG SS-881 lE FlES (2)

IPDR PDR CB3L FIES C9ffPAL FlES-SS-396 LPDR i

CEfiPli FIES (CHFUD TEPA CSIT{AL FIES(CHR0'O W16 PDR IE FILES (2)

TEPA LPDi CBifPAL FIES 016 l

L0EBhPA HG 5715 CBffRAL FIES [CHRO TEPA E PA l'8 5715 CDffRAL FIES - SS-396 ACTICth L0EB/ IPA M G 5715 PRELIMII'ARY EVllALAh10N OF TIE ATTAGED REPORT INDICATES LEAD RESPONS FOLLOW-tP AS SHOWN BELOW:

JM Im Z Hss. Z om Z h

FRGI 8

REV. 2/26/80

l 10 CPR 21 R: port No. 80-01 Pago 1 of 1 4 -/o-tr o

~

10 CFR 21 Report on Potential Reactor Coolant Pump Main Plange Bolt I.

Individual Informing the Commission

[d4d~

i Mr. Charles Goodwin, Jr.

Assistant Vice President Thermal Operation and Maintena'nce i

Portland General Electric Company l '

Portland, OR 97204 121 S.W. Salmon Street Phone:.,(503) 226-8181 II.

Facility and Component _ Potentially Containing the Defect 5

A.

Pacility:

Trojan Nuclear Plant B.

Component: Reactor Coolant Pump Main Plange Bolt (Spare) t III. Component Supplier Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230 i

IV.

Nature of Potential Defect Linear magnetic indication 4-h" long at bottom of bolt threads.

.i Evaluated as a seam.

V.

Date 7

Tbc Nuclear Operations Board met on Friday, April 4, 1980, to determine whether there was a possibility that a deficiency exists.

Based on this meeting, a recommendation was made to the responsible company officer to report the matter.

i VI.

Number and Imcation of Simi_lar Componen_ts_

R4 4,3 C W PnfM'MTP ntilized in all Westinghouse nucless-P CDtova.~i E

VII. Corrective Action A.

The bolt will be scrapped or defaced and used'for testing purposes.

B.

Responsible PCE Personnel

,l l

Engineering:

Mr. S. R. Christensen, Manager Generation Engineering Department Operations:

Mr. C. P. Yundt, General Manager

. Trojan Nuclear Plant l-

,.l t

I w

-.