Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-07-009, Nine Mile Point Unit 2, Alert Declared Due to Inadvertent Discharge of Carbon Dioxide Into Electrical Switchgear Room + (PNO-I-07-009: Nine Mile Point Unit 2, Alert Declared Due to Inadvertent Discharge of Carbon Dioxide Into Electrical Switchgear Room)
- PNO-I-08-001, Seabrook, Unplanned Shutdown Greater than 72 Hours + (PNO-I-08-001: Seabrook, Unplanned Shutdown Greater than 72 Hours)
- PNO-I-08-002, Notification of Unusual Event for Ginna Station Due to Loss of Off-Site Land-Line Communications Due to High Winds + (PNO-I-08-002: Notification of Unusual Event for Ginna Station Due to Loss of Off-Site Land-Line Communications Due to High Winds)
- PNO-I-08-003, Limerick, Shutdown Exceeding 72 Hours, 2/11/2008 + (PNO-I-08-003: Limerick, Shutdown Exceeding 72 Hours, 2/11/2008)
- PNO-I-08-006, Vermont Yankee Nuclear Power Station, Transfer of Spent Fuel from Spent Fuel Storage Pool to Onsite Independent Spent Fuel Storage Installation (ISFSI) + (PNO-I-08-006: Vermont Yankee Nuclear Power Station, Transfer of Spent Fuel from Spent Fuel Storage Pool to Onsite Independent Spent Fuel Storage Installation (ISFSI))
- PNO-I-08-009, Vermont Yankee Nuclear Power Station Water Leak in a Cooling Tower + (PNO-I-08-009: Vermont Yankee Nuclear Power Station Water Leak in a Cooling Tower)
- PNO-I-08-009B, Vermont Yankee - Update - Water Leak in a Cooling Tower at Vermont Yankee + (PNO-I-08-009B: Vermont Yankee - Update - Water Leak in a Cooling Tower at Vermont Yankee)
- PNO-I-08-010, Hope Creek Generating Station Notification of Unusual Event Due to Indications of Internal Flooding + (PNO-I-08-010: Hope Creek Generating Station Notification of Unusual Event Due to Indications of Internal Flooding)
- PNO-I-08-011, Susquehanna, 10/27/08, Alert Declared Due to High Nitrogen Levels in Unit 2 Safety-Related Pump Room + (PNO-I-08-011: Susquehanna, 10/27/08, Alert Declared Due to High Nitrogen Levels in Unit 2 Safety-Related Pump Room)
- PNO-I-08-012, Results of Implementation of Oyster Creek License Renewal Commitments Related to the Drywell Primary Containment + (PNO-I-08-012: Results of Implementation of Oyster Creek License Renewal Commitments Related to the Drywell Primary Containment)
- PNO-I-08-013, Shutdown Greater than 72 Hrs: Automatic Reactor Scram Due to Main Transformer Fault - Oyster Creek + (PNO-I-08-013: Shutdown Greater than 72 Hrs: Automatic Reactor Scram Due to Main Transformer Fault - Oyster Creek)
- PNO-I-09-001, Unusual Event and Automatic Reactor Scram Due to a Fire in the M1A Main Transformer at Oyster Creek Station + (PNO-I-09-001: Unusual Event and Automatic Reactor Scram Due to a Fire in the M1A Main Transformer at Oyster Creek Station)
- PNO-I-09-002, Oyster Creek, Shutdown Greater than 72 Hours: Manual Reactor Scram Following Loss of Cooling to Main Transformer + (PNO-I-09-002 - Oyster Creek, Shutdown Greater than 72 Hours: Manual Reactor Scram Following Loss of Cooling to Main Transformer)
- PNO-I-09-003, Indian Point Unit 3 Shutdown Due to Feedpump Issues + (PNO-I-09-003: Indian Point Unit 3 Shutdown Due to Feedpump Issues)
- PNO-I-09-004, Millstone Unit 2 Reactor Trip and Shutdown Greater than 72 Hours + (PNO-I-09-004: Millstone Unit 2 Reactor Trip and Shutdown Greater than 72 Hours)
- PNO-I-09-005, Exelon Generation Co. Llc., Oyster Creek Reactor Trip and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours + (PNO-I-09-005: Exelon Generation Co. Llc., Oyster Creek Reactor Trip and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours)
- PNO-I-09-006, Three Mile Island Unit 1 - Contamination Event (Update) + (PNO-I-09-006: Three Mile Island Unit 1 - Contamination Event (Update))
- PNO-I-09-007, Millstone Unit 3 Reactor Trip and Shutdown Greater than 72 Hours + (PNO-I-09-007: Millstone Unit 3 Reactor Trip and Shutdown Greater than 72 Hours)
- PNO-I-10-001, Calvert Cliffs Dual-Unit Trip Due to Partial Loss of Offsite Power + (PNO-I-10-001: Calvert Cliffs Dual-Unit Trip Due to Partial Loss of Offsite Power)
- PNO-I-10-002, Loss of Normal Communications / Storm Impact Offsite at Vermont Yankee + (PNO-I-10-002: Loss of Normal Communications / Storm Impact Offsite at Vermont Yankee)
- PNO-I-10-003, Unusual Event Declarations Due to Seismic Activity (Vermont Yankee and D.C. Cook) + (PNO-I-10-003: Unusual Event Declarations Due to Seismic Activity (Vermont Yankee and D.C. Cook))
- PNO-I-10-004, Susquehanna Unit 1 Manual Scram and Shutdown Greater than 72 Hours Due to an Internal Flooding Event + (PNO-I-10-004: Susquehanna Unit 1 Manual Scram and Shutdown Greater than 72 Hours Due to an Internal Flooding Event)
- PNO-I-10-005, Susquehanna Alert Due to High Refrigerant Levels in Unit 1 Reactor Bldg + (PNO-I-10-005 - Susquehanna Alert Due to High Refrigerant Levels in Unit 1 Reactor Bldg)
- PNO-I-10-006, Notification of Alert Declared Due to Explosion as a Result of 21 Main Transformer Failure at Indian Point, Unit 2 + (PNO-I-10-006: Notification of Alert Declared Due to Explosion as a Result of 21 Main Transformer Failure at Indian Point, Unit 2)
- PNO-I-11-001, Nine Mile Point Units 1 and 2 Strike + (PNO-I-11-001: Nine Mile Point Units 1 and 2 Strike)
- PNO-I-11-001A, ; Update Nine-Mile Point Units 1 and 2 End of Strike + (PNO-I-11-001A; Update Nine-Mile Point Units 1 and 2 End of Strike)
- PNO-I-11-002, Salem Generating Station Notification of Unusual Event + (PNO-I-11-002: Salem Generating Station Notification of Unusual Event)
- PNO-I-11-003, Nine Mile Point Unit 2 Notification of Unusual Event Due to Reactor Coolant System Leak Greater than 10 Gpm and Plant Shutdown Greater than Three Days + (PNO-I-11-003: Nine Mile Point Unit 2 Notification of Unusual Event Due to Reactor Coolant System Leak Greater than 10 Gpm and Plant Shutdown Greater than Three Days)
- PNO-I-11-004, Nine Mile Point Unit 2 Technical Specification-Required Shutdown Due to an Increase in Unidentifed Reactor Coolant System Leakage + (PNO-I-11-004: Nine Mile Point Unit 2 Technical Specification-Required Shutdown Due to an Increase in Unidentifed Reactor Coolant System Leakage)
- PNO-I-12-001, Salem Generating Station Inadvertent Safety Injection and Notification of Unusual Event Due to Fire Alarm in Containment + (PNO-I-12-001: Salem Generating Station Inadvertent Safety Injection and Notification of Unusual Event Due to Fire Alarm in Containment)
- PNO-I-12-002, Current NRC Actions During Pilgrim Nuclear Power Station Union Contract Negotiations + (PNO-I-12-002 - Current NRC Actions During Pilgrim Nuclear Power Station Union Contract Negotiations)
- PNO-I-12-002A, Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations + (PNO-I-12-002A Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations)
- PNO-I-12-002B, Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations + (PNO-I-12-002B Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations)
- PNO-I-12-002C, Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations + (PNO-I-12-002C Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations)
- PNO-I-12-002D, Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations + (PNO-I-12-002D: Update - Current NRC Actions and Status of Pilgrim Nuclear Power Station Union Contract Negotiations)
- PNO-I-12-002E, Update - Status of Union Lockout at Pilgrim Nuclear Power Station + (PNO-I-12-002E: Update - Status of Union Lockout at Pilgrim Nuclear Power Station)
- PNO-I-12-002F, Update - Status of Union Lockout at Pilgrim Nuclear Power Station + (PNO-I-12-002F: Update - Status of Union Lockout at Pilgrim Nuclear Power Station)
- PNO-I-12-003, Susquehanna Shutdown Due to RCS Leak + (PNO-I-12-003 - Susquehanna Shutdown Due to RCS Leak)
- PNO-I-12-004, Limerick, Unit1, Notification of Unusual Event Declared Due to Electrical Fault in Non-Safety Related Transformer 7-18-2012 + (PNO-I-12-004 - Limerick, Unit1, Notification of Unusual Event Declared Due to Electrical Fault in Non-Safety Related Transformer 7-18-2012)
- PNO-I-12-005, Oyster Creek Reactor Shutdown and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours + (PNO-I-12-005 - Oyster Creek Reactor Shutdown and Unusual Event Due to a Loss of Offsite Power and Shutdown Greater than 72 Hours)
- PNO-I-12-006, Three Mile Island Shutdown Due to Reactor Coolant System Leak + (PNO-I-12-006 - Three Mile Island Shutdown Due to Reactor Coolant System Leak)
- PNO-I-12-007, Hurricane Sandy Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3, and Salem Unit 1 + (PNO-I-12-007 - Hurricane Sandy Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3, and Salem Unit 1)
- PNO-I-12-008, Fitzpatrick Notice of Unusual Event for Fire in Main Transformer + (PNO-I-12-008-Fitzpatrick Notice of Unusual Event for Fire in Main Transformer)
- PNO-I-13-001, Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo + (PNO-I-13-001 - Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo)
- PNO-I-13-001A, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo + (PNO-I-13-001A - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo)
- PNO-I-13-001B, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo + (PNO-I-13-001B - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo)
- PNO-I-13-001C, Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo + (PNO-I-13-001C - Update: Pilgrim Station: Unusual Event Declared Due to Loss of Offsite Power During Winter Storm Nemo)
- PNO-I-14-001, Calvert Cliffs Dual Unit Trip Following the Loss of the 21 13kV Bus + (PNO-I-14-001 - Calvert Cliffs Dual Unit Trip Following the Loss of the 21 13kV Bus)
- PNO-I-14-002, Millstone Dual Unit Trip with Loss of Offsite Power + (PNO-I-14-002 - Millstone Dual Unit Trip with Loss of Offsite Power)
- PNO-I-14-003, Millstone, Unit 2. Shutdown Greater than 72 Hours Due to TS-Required Shutdown for the TDAFW + (PNO-I-14-003 - Millstone, Unit 2. Shutdown Greater than 72 Hours Due to TS-Required Shutdown for the TDAFW)
- PNO-I-15-001, Pilgrim: Shutdown Greater than 72 Hours Due to Reactor Scram Following a Partial Loss of Offsite Power + (PNO-I-15-001 - Pilgrim: Shutdown Greater than 72 Hours Due to Reactor Scram Following a Partial Loss of Offsite Power)