Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML062580217 + (On-Site Water Sample Results)
- ML24312A260 + (On-line Monitoring (OLM) of Technical Specification (TS) Instrumentation - Executive Summary)
- 05000263/LER-1996-002-01, On:960308,found Wire in 12 EDG Voltage Regulator Not Properly Secured Due to Missing Fastener. Cause for Missing Fastener Not Known.Wire Lug Secured & Both EDGs Tested + (On:960308,found Wire in 12 EDG Voltage Regulator Not Properly Secured Due to Missing Fastener. Cause for Missing Fastener Not Known.Wire Lug Secured & Both EDGs Tested)
- ML16048A207 + (Once Through Cooling)
- ML20058E075 + (Once Through Steam Generator (OTSG) Layup Recirculation Sys, Technical Evaluation Rept)
- ML20093N161 + (Once-Through Integral Sys Hot Leg High Point Vent Test 240100)
- ML20093N168 + (Once-Through Integral Sys Hot Leg High Point Vent Test 240200)
- ML20093N172 + (Once-Through Integral Sys Test Program,Otis Loop Functional Spec RDD:84:4091-24-01:01)
- ML19305D744 + (Once-Through Steam Generator Modeling for Analysis of TMI Incident, Conference Paper)
- ML022460194 + (Once-Through Steam Generator Severed Plugged Tube Event Followup (Tac No. MB3305))
- ML093010483 + (Once-Through Steam Generator Tube Loads Under Conditions Resulting from Postulated Breaks in Reactor Coolant System Upper Hot Leg Large-Bore Piping)
- ML093010466 + (Once-Through Steam Generator Tube Loads Under Conditions Resulting from Postulated Breaks in Reactor Coolant System Upper Hot Leg Large-Bore Piping)
- ML093010434 + (Once-Through Steam Generator Tube Loads Under Conditions Resulting from Postulated Breaks in Reactor Coolant System Upper Hot Leg Large-Bore Piping)
- ML093010455 + (Once-Through Steam Generator Tube Loads Under Conditions Resulting from Postulated Breaks in Reactor Coolant System Upper Hot-Leg Large-Bore Piping)
- ML093010490 + (Once-Through Steam Generator Tube Loads Under Conditions Resulting from Postulated Breaks in Reactor Coolant System Upper Hot-Leg Large-Bore Piping)
- ML20024C794 + (Once-Through Steam Generator Tube Problems)
- ML022660498 + (Once-through Steam Generator (OTSG) Kinetic Expansion Inspection and Repair Criteria)
- ML070040051 + (Onconee Nuclear Station, Summary of December 12, 2006, to Discuss the Use of Fiber-Reinforced Polymer (TAC Nos. MD22129, MD2130, MD2131))
- ML072470596 + (One -Time Only Proposed Contingency Plan for Use During the Replacement of the Existing Main Stack High Range Radiation Monitors)
- ENS 45871 + (One Alarm Siren Initiated Spuriously)
- ENS 48849 + (One Alert Notification Siren Removed from Service for Planned Maintenance)
- ENS 43602 + (One Channel of Low Main Steam Line Pressure Signal Mistakenly Removed from Service for 33 Minutes)
- ML050840111 + (One Column Nozzle Dam Just-in-Time Training)
- ENS 50189 + (One Containment Spray Train Chemical Additive Flow Out of Specifications)
- ML20206N762 + (One Dimensional Gravity Calculation and Paleozoic Structure and Plutons at Reelfoot Scarp)
- ML19321B305 + (One Dimensional Neutron Kinetics Model for Thor Code, Final Rept)
- ML20207A298 + (One Dimensional Transient Fluid Model for Fuel-Coolant Interaction Analysis)
- ENS 52519 + (One Division Emergency Diesel Generator Cooling Water System Declared Inoperable)
- ENS 41912 + (One Emergency Preparedness Siren Out of Service)
- ENS 48860 + (One Emergency Warning Siren Energized for a Short Time)
- 0CAN080803, One Fitness-for-Duty Program Performance Data for the Period January - June 2008 + (One Fitness-for-Duty Program Performance Data for the Period January - June 2008)
- ENS 40495 + (One Half Scram Signal Due to the Loss of the "B" Reactor Protection System Bus.)
- ENS 53305 + (One Head Penetration Not Acceptable During Penetration Examinations)
- Information Notice 1993-41, One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems + (One Hour Fire Endurance Test Results for Thermal Ceramics Kaowool, 3M Company FS-195 and 3M Company Interam E-50 Fire Barrier Systems)
- ENS 47360 + (One Hour Report Due to a Failed Item Relied on for Safety)
- ENS 43397 + (One Hour Report Notification: Combustible Material Exceeding Item Relied on for Safety (Irofs) Limits Found)
- DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage + (One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage)
- DCL-20-039, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage + (One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage)
- EPID:L-2020-LRO-0026 + (One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage)
- DCL-21-036, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage + (One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage)
- DCL-11-053, One Hundred Eighty-Day Steam Generator Report - Sixteenth Refueling Outage + (One Hundred Eighty-Day Steam Generator Report - Sixteenth Refueling Outage)
- DCL-16-056, One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage + (One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage)
- DCL-15-054, One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage + (One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage)
- ENS 43319 + (One I-125 Prostate Seed Reported Missing)
- ENS 50229 + (One Incore Detector Containing U-235 Unaccounted for During Inventory)
- ML20148F157 + (One Infraction & 2 Deficiences Revealed in 780914 Inspec of Activities Auth by NRC Special Nuc Matl Lic SNM-773. Intervals for Checking Plutonium Leakage Exceeded Specified Frequency.Specified Documents,Notices,& Forms Not Posted)
- ML20262D986 + (One Line Bus Diagram for 345kV System)
- ML20260E531 + (One Line Diag:Chg Pp Mot & Disch Vv Fdrs & Buses Fire Protection Analysis. Revision Date Illegible.Actual Drawing Number Is 12846.88-EKS-3-1)
- ML20263G351 + (One Line Diag:High Pressure Core Spray Sys. Sheet 1)
- ML20263G342 + (One Line Diag:High Pressure Core Spray Sys. Sheet 2)
- ML20263G348 + (One Line Diag:High Pressure Core Spray Sys. Sheet 3)