Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137F157 + (Nu HELB Process Evaluation Rept,Results of Mapping of Northeast Utils HELB Solution Process)
- ML23263A025 + (Nu Scale Power, LLC, Submittal of Supplemental Information in Support of Nrg Review of Topical Report TR-124587-P, Extended Passive Cooling and Reactivity Control Methodology, Revision O (Item A-XPC.LTR-4))
- ML18150A523 + (NuS20180606 Chapter 8 SER Open Items Agenda)
- ML19066A049 + (NuS20190320 Ch 9 and 16 SER with Open Items Agenda 3.20.19)
- ML19066A044 + (NuS20190321 Ch 10 11 and 12 SER with Open Items Agenda 3.21.19)
- ML19182A275 + (NuS20190709 Ch 20 SER with Open Items Revised Agenda)
- PMNS20221213, NuScales Request to Implement ASMEs Code Case N-883 + (NuScales Request to Implement ASMEs Code Case N-883)
- ML20261D642 + (Nuc Blr Nuc Stm Supply Shutoff Inop & Bypass)
- ML20261D660 + (Nuc Blr Nuc Stm Supply Shutoff Inop & Bypass)
- ML20261D656 + (Nuc Blr Nuc Stm Supply Shutoff Inop & Bypass)
- ML20261D652 + (Nuc Blr Nuc Stm Supply Shutoff Inop & Bypass)
- ML20261D647 + (Nuc Blr Nuc Stm Supply Shutoff Inop & Bypass)
- WBL-25-021, Nucear Plant - Annual Non-Radiological Environmental Operating Report - 2024 + (Nucear Plant - Annual Non-Radiological Environmental Operating Report - 2024)
- ML053290094 + (Nucear Power Plant, Revision to the Physical Security Plan, Section 16.9)
- ML13136A143 + (Nucelar Power Plant, Unit 1 - Re-Issuance of Amendment Regarding Adoption of TSTF-275 and TSTF-300)
- ML040260032 + (Nuciear Power Plant, Response to Request for Additional Lnformation Regarding Proposed Relief Request No. VRR-08 to the JAFNPP In-Service Testing Program)
- ML021050440 + (Nuclaer Generating Plant, Unit 2, Enclosure 1, EOC 20 S/G Inspection Results)
- ML21286A321 + (Nuclaer Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4, Reactivity Control Mechanical Designs)
- ML072780408 + (Nuclar Station, Unit 1, Inspection Results from Inspections Performed in Accordance with Revised NRC Order (EA-03-009))
- ML100780056 + (Nuclear)
- ML031110097 + (Nuclear & Environmental Operations, Davis Besse Reactor Vessel Head Examination)
- ML20148T837 + (Nuclear Accident & Recovery at Three Mile Island)
- ML20212M769 + (Nuclear Applications Software Package)
- ML19345H252 + (Nuclear Aspects of Accidental Criticality at Wood River Junction,RI,640724)
- ML103210019 + (Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System (Nonproprietary), WNA-AR-001 80-WBT-NP, Revision 0, Dated October 2010. Attachment 2)
- ML110950332 + (Nuclear Automation Watts Bar Unit 2, NSSS Completion Program I&C Project, WNA-TR-02451-WBT, Revision 0, Test Summary Report for the Post Accident Monitoring System)
- ML20265B280 + (Nuclear Boiler)
- ML20265B276 + (Nuclear Boiler)
- ML20261J147 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Index. Sheet H00)
- ML20261D635 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Isolation Signal)
- ML20261D640 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Isolation Signal)
- ML20261D623 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Isolation Signal)
- ML20261D626 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Isolation Signal)
- ML20261D630 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Isolation Signal)
- ML20261D618 + (Nuclear Boiler Nuclear Steam Supply Shutoff System Isolation Signal)
- ML20261J624 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 1 of 12)
- ML20261J671 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 10 of 12)
- ML20261J678 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 11 of 12)
- ML20261J686 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 12 of 12)
- ML20261J628 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 2 of 12)
- ML20261J633 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 3 of 12)
- ML20261J639 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 4 of 12)
- ML20261J643 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 5 of 12)
- ML20261J647 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 6 of 12)
- ML20261J653 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 7 of 12)
- ML20261J658 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 8 of 12)
- ML20261J664 + (Nuclear Boiler Prcs Instm System Elementary Diagram. Sheet 9 of 12)
- ML20266F896 + (Nuclear Boiler Process Instrumentation System. Sheet 1.Rev Date Illegible)
- ML20261H990 + (Nuclear Boiler System Control Tabulations & Power Distribution. Sheet A01)
- ML20261J018 + (Nuclear Boiler System Feedwater Inlet Shutoff Valve F065B. Sheet A10)
- ML20261H998 + (Nuclear Boiler System Instrumentation,Computer Inputs. Sheet A02)
- ML20261J312 + (Nuclear Boiler System P&I Flow Diagram. Sheet 1 of 4)