Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-06-133, Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element + (Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element)
- GO2-06-082, Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element + (Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element)
- BSEP-06-0048, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines)
- NG-11-0010, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines)
- NRC-06-0052, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines)
- BSEP 06-0073, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines)
- BSEP 06-0040, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines)
- BSEP 06-0037, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines)
- NLS2006094, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines)
- NG-16-0035, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines + (Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines)
- 3F1011-03, Notification of Deviation from EPRI 1016555, Pressurized Water Reactor Secondary Water Chemistry Guidelines, Revision 7, NEI 03-08 Needed Work Product Element + (Notification of Deviation from EPRI 1016555, Pressurized Water Reactor Secondary Water Chemistry Guidelines, Revision 7, NEI 03-08 Needed Work Product Element)
- L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency + (Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency)
- ET 09-0026, Notification of Deviation from EPRI Pressurized Water Reactor Secondary Water Chemistry Guidelines + (Notification of Deviation from EPRI Pressurized Water Reactor Secondary Water Chemistry Guidelines)
- ML12321A029 + (Notification of Deviation from EPRI Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7, Section 6.3.3.2)
- PNP 2012-021, Notification of Deviation from EPRI Steam Generator Management Program: PWR Steam Generator Examination Guidelines: Revision 7 + (Notification of Deviation from EPRI Steam Generator Management Program: PWR Steam Generator Examination Guidelines: Revision 7)
- NEI 03-08, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) 2019-008, Materials Reliability Program: Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants . + (Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) 2019-008, Materials Reliability Program: Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants .)
- ML23321A044 + (Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline)
- ML23321A043 + (Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline)
- BW210082, Notification of Deviation from Electric Power Research Institute Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-solable Reactor + (Notification of Deviation from Electric Power Research Institute Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-solable Reactor)
- CP-202000311, Notification of Deviation from Electric Power Research Institute MRP 2018-027, NEI 03-08 Needed Inspection Guidance for PWR CRDM Thermal Sleeve Wear, Superseded by PWROG-16003-P, Evaluation of . + (Notification of Deviation from Electric Power Research Institute MRP 2018-027, NEI 03-08 Needed Inspection Guidance for PWR CRDM Thermal Sleeve Wear, Superseded by PWROG-16003-P, Evaluation of .)
- NL-17-132, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) 227-A, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines, Examination Schedule - NEI 03-08 Needed . + (Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) 227-A, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines, Examination Schedule - NEI 03-08 Needed .)
- ML21349A104 + (Notification of Deviation from Electric Power Research Institute Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-solable Reactor.)
- LR-N18-0080, Notification of Deviation from Electric Power Research Institute (Epri), Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A) + (Notification of Deviation from Electric Power Research Institute (Epri), Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227-A))
- ML20066F636 + (Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline)
- AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in + (Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in)
- L-PI-12-120, Notification of Deviation from Eprl Steam Generator Management Program Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7, Section 6.3.3.2 + (Notification of Deviation from Eprl Steam Generator Management Program Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7, Section 6.3.3.2)
- SBK-L-09232, Notification of Deviation from MRP-139 Inspection Requirement + (Notification of Deviation from MRP-139 Inspection Requirement)
- SBK-L-06044, Notification of Deviation from MRP-139 Inspection Requirement + (Notification of Deviation from MRP-139 Inspection Requirement)
- ML060740666 + (Notification of Deviation from MRP-139 Inspection Requirement)
- L-25-084, Notification of Deviation from MRP-227, Revision 1-A, Section 7.5 Regarding the Disposition of Examination Results for Thermal Shield Flexures + (Notification of Deviation from MRP-227, Revision 1-A, Section 7.5 Regarding the Disposition of Examination Results for Thermal Shield Flexures)
- RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency + (Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency)
- 1CAN052104, Notification of Deviation from Materials Reliability Program (MRP) 2019-008 + (Notification of Deviation from Materials Reliability Program (MRP) 2019-008)
- L-2024-189, Notification of Deviation from NEI 03-08, OG-21-160, Regarding Clevis Insert Bolting UT Exam + (Notification of Deviation from NEI 03-08, OG-21-160, Regarding Clevis Insert Bolting UT Exam)
- JAFP-14-0054, Notification of Deviation from NIFG Guidance for Reexamination of Dissimilar Metal Welds + (Notification of Deviation from NIFG Guidance for Reexamination of Dissimilar Metal Welds)
- L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections + (Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections)
- ML24094A269 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections)
- NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections + (Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections)
- L-2023-036, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections + (Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections)
- L-2024-040, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections + (Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections)
- ML24234A074 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements)
- ML24247A221 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021)
- LR-N23-0068, Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021)
- NL-20-0941, Notification of Deviation from Pressurized Water Reactor Owners Group Topical Report WCAP-17451-P, Revision 2 + (Notification of Deviation from Pressurized Water Reactor Owners Group Topical Report WCAP-17451-P, Revision 2)
- ML21316A051 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections)
- L-2025-058, Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160R1 Examination Schedule + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160R1 Examination Schedule)
- L-2025-073, Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63)
- ML25104A235 + (Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63)
- NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines + (Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines)
- ML18114A586 + (Notification of Directors Decision Under 10CFR2.206, Denying Request for Public Hearing & EIS Preparation Re Steam Generator Repair Program)
- ML022250405 + (Notification of Discontinuation of Review and Request for Addition Information for Scan Technology Application for the Registration of Model CM100)
- ML030210524 + (Notification of Disposition for Traveler TSTF-373, R.2)
- ML19317E924 + (Notification of Disposition of Action Items Resulting from 720118 Meeting W/Ceq & EPA Re Des)
- ML103210227 + (Notification of Distribution List Changes Update)