ML21349A104

From kanterella
Jump to navigation Jump to search
Notification of Deviation from Electric Power Research Institute Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-solable Reactor.
Date released: 12/23/2021 Download: ML21349A104


Justification for the Deviation from MRP 2019-008, Technical Evaluation 635273
ML21349A106
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/15/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
BW210082, EC 635273, NEI 03-08
Download: ML21349A106 (17)
Notification of Deviation from Electric Power Research Institute Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-solable Reactor.
ML21349A105
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/15/2021
From: Keenan J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BW210082, NEI 03-08
Download: ML21349A105 (2)