Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132A469 + (Modification 1 to Extend Period of Performance to 790330 for Career Counseling, Binder/Elster Assoc)
- ML20147G797 + (Modification 1,changing B&R ,to Fire Protec Prog:Review & Eval 1)
- ML20148G706 + (Modification 1,changing Principal Investigator to Radionuclide Retention & Land Form Mod in Surface Pathways)
- ML20148H451 + (Modification 1,increasing Funding to Lease of Class 4 Sedans, Mike Albert Leasing,Inc)
- ML20147F137 + (Modification 1,making Admin Changes to Consulting on Foreign Countries Code Development Progs, Dr Ps Anderson, Slangerup,Denmark)
- ML20147E247 + (Modification 1,unilaterally Increasing Support Ceiling for Fuel Funds,To Dev & Test of Model for Fire Potential in Nuc Pwr Plants)
- ML20148G542 + (Modification 12 Extending the Period of Performance from 780930 to 781231 Loca/Eccs Support Studies)
- ML20150D766 + (Modification 14,extending Period of Performance Through 781031 at No Addl Cost to Govt of Contract for Proj Hot Wall Effects)
- ML20150C640 + (Modification 2 Adding Key Personnel to Tech Assistance at Core-Thermal Hydraulic Performance During Steam Line Break Accident, Awarded to Nuc Associates Intl Corp)
- ML20150E705 + (Modification 2 to Inter-Loop Shuttlebus Svc)
- ML20148A489 + (Modification 2 to Replace the 770803 Form 187 with a 780803 Form 187 for Enhancement of the Nuc Reporting & Analysis Sys, Boeing Computer Svc Co)
- ML20204D475 + (Modification 2,providing for Addition of Engine Mounted Air Conditioner Units & Concomitant Increase in Contract Price, to Emergency Vehicles for Response to Nuc Incidents)
- ML20150D203 + (Modification 2,unilateral Mod to Provide Addl Funds of $150000 to Proj a Study of Droplet Hydrodynamics Important in LOCA Reflood)
- ML20150D888 + (Modification 3 Deletes Previous Paragraph 2 & Substitutes New Paragraph 2,extending Length of Contract for Residual Stress at Girth Butt Welds in Pipes or Pressure Vessels)
- ML20150D287 + (Modification 3,administrative Change in Patent Clause Xvii of Contract for Proj Two Phase Flow Studies Relevant to the Upper Plenum for Pressurized Water Reactors)
- ML20150C574 + (Modification 3,changing Funds from Reimbursable Travel to Fixed Price for State Review of High Level Radioactive Waste Site Suitability Criteria, Awarded to Potomac Res Inc)
- ML20147E274 + (Modification 3,increasing Funding,To Pipe Rupture Studies)
- ML20150D891 + (Modification 4 Corrects Contract Incorectly Listed in Mod 3 to Residual Stress at Girth Butt Welds in Pipes or Pressure Welds)
- ML20147E195 + (Modification 4,providing Funding for Fy 1979 Effort, to Environ Surveil for Measuring Concentrations of Radioactivity & Radiat Levels in Environ of Comm Lic Activities W/In Me, Awarded to Me Dept of Human Svc)
- ML20150D236 + (Modification 4,unilateral Mod to Provide Incremental Funding to Doppler Effects of Irradiated Fertile Matls)
- ML20147A725 + (Modification 5 Includes Incorp of NRC Form 187,Security/ Protec Requirements to Stenographic Repting Svcs)
- ML20150D917 + (Modification 5,providing Addl $25,000,new Work Scope & Extension of Work Period to 790930,to Approximate Treatments of the Third Dimension in Numerical Transport Calculations)
- ML20147G766 + (Modification 5,providing Addl Scope & Funding,Extending Period of Performance & Changing Contract ,to Dynamic Studies of Liquid Metal Fast Breeder Reactors & Nuc Pwr Plants)
- ML20147E299 + (Modification 5,providing Funding for Fy79 Effort to Environ Surveillence for Measuring Concentrations of Radioactivity & Radiat Levels...,St of Il)
- ML20147H096 + (Modification 7,extending Period of Performance to 790930 & Increasing Funding to Improving Ultrasonic Nondestructive Test of Pressure Vessels)
- 05000482/LER-2018-002, Modification Activities Affected Control Room Envelope Boundary Causing a Condition Prohibited by Technical Specifications + (Modification Activities Affected Control Room Envelope Boundary Causing a Condition Prohibited by Technical Specifications)
- ML20265C033 + (Modification Actuator Cover)
- ML20265B969 + (Modification Actuator Cover)
- 05000395/FIN-2013003-01 + (Modification Leads to Auxiliary Building Flood Vulnerability)
- ML18215A100 + (Modification No 001 to Interagency Agreement No. NRC-HQ-40-17-I-0009)
- ML19238A280 + (Modification No 001 to Task Order No. 31310019F0033 Under Contract No. 31310018D0012 - Redacted)
- ML19100A226 + (Modification No 010 to Task Order No. NRC-HQ-25-15-O-0001 Under Contract No. NRC-HQ-10-15-A-0001)
- ML18082B071 + (Modification No. 0001 to Contract No. 31510018C0001)
- ML18271A156 + (Modification No. 0001 to Cooperative Agreement No. NRC-HQ-60-14-G-0008)
- ML18269A202 + (Modification No. 0001 to Task Order No. 31310018P0057)
- ML18085A565 + (Modification No. 0001 to Task Order No. NRC-HQ-10-17-T-0002 Under Contract No. NNG15SD00B)
- ML18032A562 + (Modification No. 0002 to Grant No. NRC-HQ-60-15-G-0003)
- ML17264A064 + (Modification No. 0002 to Interagency Agreement No. NRC~HQ-50-16-D-0004)
- ML18201A116 + (Modification No. 0002 to Task Order No. NRC-HQ-11-17-T-0001 Under Contract No. NRC-HQ-25-14-E-0006)
- ML18221A088 + (Modification No. 0003 to Contract No. NRC-HQ-40-16-C-0018)
- ML18264A148 + (Modification No. 0003 to Contract No. NRC-HQ-40-17-C-0009)
- ML18165A224 + (Modification No. 0003 to Contract No. NRC-R1-91-17-C-0001)
- ML18205A226 + (Modification No. 0003 to Task Order No. NRC-HQ-25-17-T-0001 Under Interagency Agreement No. NRC-HQ-25-14-D-0004)
- ML18180A184 + (Modification No. 0004 to Task Order No. NRC-HQ-20-17-T-0004 Under Contract No. NRC-HQ-50-14-E-0001)
- ML18187A022 + (Modification No. 0005 to Task Order No. NRC-HQ-20-16-T-0001 Under Contract No. NRC-HQ-25-14-E-0004)
- ML18193A976 + (Modification No. 0006 to Contract No. NRC-HQ-7B-17-C-0001)
- ML18089A119 + (Modification No. 0006 to Interagency Agreement No. NRC-HQ-60-14-D-0010)
- ML18131A322 + (Modification No. 0007 to Interagency Agreement No. NRC-HQ-60-14-I-0016)
- ML18110A368 + (Modification No. 0007 to Task Order No. NRC-HQ-10-17-T-0001 Under Contract No. GS-06F-1101Z)
- ML18072A024 + (Modification No. 0007 to Task Order No. NRC-HQ-84-15-T-0001 Under Contract No. V797D40283)
- ML18225A272 + (Modification No. 0008 to Contract No. NRC-HQ-10-16-C-0003)
- ML18145A295 + (Modification No. 0009 to Task Order No. NRC-HQ-25-14-T-0001 Under Contract No. NRC-HQ-25-14-E-0001)