Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266H859 + (Marked-up Piping Diagram Reactor Feedwater System,Unit 2. Sheet 1)
- ML20266H675 + (Marked-up Piping Diagram Service Water System,Unit 1, as-built.Sheet 1)
- ML20266H678 + (Marked-up Piping Diagram Service Water System,Unit 1, as-built.Sheet 2)
- ML20266H682 + (Marked-up Piping Diagram Service Water System,Unit 1, as-built.Sheet 3)
- ML20266H864 + (Marked-up Piping Diagram Service Water System,Unit 2, as-built.Sheet 1)
- ML20266H867 + (Marked-up Piping Diagram Service Water System,Unit 2, as-built.Sheet 2)
- ML20266H871 + (Marked-up Piping Diagram Service Water System,Unit 2. Sheet 3)
- ML20266H887 + (Marked-up Piping Diagram Starting Air for Diesel Generators,Units 1 & 2, as-built.Sheet 2A)
- ML20266H876 + (Marked-up Piping Diagram Starting Air for Diesel Generators,Units 1 & 2, as-built.Sheet 1A)
- ML20266H880 + (Marked-up Piping Diagram Starting Air for Diesel Generators,Units 1 & 2, as Built.Sheet 1B)
- ML20266H894 + (Marked-up Piping Diagram Starting Air for Diesel Generators,Units 1 & 2, as-built.Sheet 2B)
- ML20244C443 + (Marked-up Piping and Instrument Diagram:Condensate & Feedwater, as-built.Sheet 2 of 2)
- ML20263M254 + (Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2)
- ML20263M249 + (Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2)
- ML20263N211 + (Marked-up Piping and Instrumentation Diagram:Chemical and Volume Control System. Rev Date Illegible)
- ML20263N209 + (Marked-up Piping and Instrumentation Diagram:Chemical and Volume Control System. Rev Date Illegible)
- ML20262L280 + (Marked-up Plan - Instr & Control Equipment Reactor Building Fifth Floor El 684 Ft 6 Inches,South)
- ML20263F820 + (Marked-up Plant Arrangement:Reactor Building Main Floor Elev 650 Ft. No Revision Date)
- ML20262K381 + (Marked-up Plant Design Drawing:Reactor Building Unit 1,Area 26 Plan of Elev 738 Ft 11.5 Inches)
- ML20262K384 + (Marked-up Plant Design Drawing:Reactor Building Unit 1,Area 26 Plan of El 752 Ft 2.5 Inches)
- ML20262C098 + (Marked-up Plot Plan, as-built)
- ML20262K833 + (Marked-up Plot Plan,Units 1,2,3 & 4)
- ML20040A030 + (Marked-up Plot Plan:Final Contours,Roads,Parking Areas and Sidewalks)
- ML19305D045 + (Marked-up Possible Risk Criteria for Reactor Safety)
- ML20263B693 + (Marked-up Post Accident Containment Atmosphere Sampling System. Sheet 3. Actual Rev STATUS:N-1)
- ML20266H995 + (Marked-up Post-Accident Sampling System,Unit 2. Sheet 1)
- ML20262F158 + (Marked-up Powerhouse Aux,Turbine & Cont Bldg Units 1 & 2 Mechanical Flow Diagram:Essential Raw Cooling Water)
- ML20262J165 + (Marked-up Powerhouse Aux,Turbine & Cont Bldg:Mechanical Flow Diagram Essential Raw Cooling Water for Unit 1)
- ML20262F153 + (Marked-up Powerhouse Auxiliary Building Units 1 & 2 Mechanical Flow Diagram:Essential Raw Cooling Water System)
- ML20261F597 + (Marked-up Powerhouse:Equipment Plans - El 593 Ft & 586 Ft, El 565 Ft & 557 Ft)
- ML20261F590 + (Marked-up Powerhouse:Equipment Plans - El 565 Ft & 557 Ft)
- ML20261F602 + (Marked-up Powerhouse:Equipment Plans El 541.5 Ft & El 519 Ft)
- ML20261F594 + (Marked-up Powerhouse:Equipment Plans El 541.5 Ft & El 519 Ft)
- ML20263T211 + (Marked-up Pre-Critical Accelerometer Installation)
- ML20266H990 + (Marked-up Primary Containment Hydrogen Monitoring System, Unit 2, as-built.Sheet 2)
- ML20266H982 + (Marked-up Primary Containment Hydrogen Monitoring System, Unit 2, as-built.Sheet 1)
- ML20054G331 + (Marked-up Proof & Review Copy of ETS Tables 3.3-12,4.3-8, 3.3-13 & 3.12-1 Re Radioactive Liquid Effluent Monitoring Instrumentation & Surveillance Requirements & Radioactive Gaseous Waste Monitoring,Sampling & Analysis Program)
- ML20217B787 + (Marked-up Proposed Improved TS 3.6 & 5.5.2)
- ML20087M903 + (Marked-up Proposed Proof & Review Tech Specs Re Fire Detection Instrumentation Limiting Condition for Operation & Plant Sys)
- ML17277B191 + (Marked-up Proposed Tech Spec Changes Re Limiting Condition for Operation of Electrical Power Sys)
- ML20071J356 + (Marked-up Proposed Tech Spec Changes Reflecting Change in Audit Frequency of Security & Emergency Plans to 12 Months)
- ML17221A458 + (Marked-up Proposed Tech Spec Pages 3/4 6-23 & 3/4 6-24, of Tech Spec 3/4.6.4, Combustible Gas Control - Hydrogen Analyzers)
- ML20205L241 + (Marked-up Proposed Tech Spec Pages 5-3 & 5-5 Re Criticality Spent Fuel & New Fuel Storage)
- ML20126E732 + (Marked-up Proposed Tech Spec Section 6.0, Administrative Controls, Unit 1)
- ML20002A717 + (Marked-up Proposed Tech Specs & Safety Evaluation for Changes to Tech Specs 4.8.1.1.2.c.7 & 4.8.1.2 Re Relief from Diesel Generator Operability Requirements)
- ML17221A448 + (Marked-up Proposed Tech Specs Deleting Two License Conditions.Util Safety Evaluation & Determination of NSHC Also Encl)
- ML20138H883 + (Marked-up Proposed Tech Specs Re Radiation Monitoring Instrumentation,Accident Monitoring Instrumentation, Radiological Effluents,Secondary Containment Bypass Leakage Paths & Electrical Power Sys)
- ML20207N401 + (Marked-up Proposed Tech Specs Re Reactor Trip Sys Instrumentation Trip Setpoints,Esfas Instrumentation Trip Setpoints & Seismic Monitoring Instrumentation Surveillance Requirements)
- ML20244D810 + (Marked-up Proposed Tech Specs Re Slave Relay Test,Staggered Test Basis,Thermal Power,Trip Actuating Device Operational Test,Unidentified Leakage,Unrestricted Area,Venting,Waste Gas Holdup Sys,Frequency Notation & Operational Modes)
- ML17215A429 + (Marked-up Proposed Tech Specs Reflecting Changes Required to Commence Cycle 2 Operation)
- ML20206J534 + (Marked-up Proposed Tech Specs Resolving NRC Concerns Re Core Stability & Supporting Single Loop Operations)