Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266H176 + (Main Control Board CPI-ECPRCB-03 Interconnection Diagram. Actual Rev STATUS:CP-6)
- ML20262A093 + (Main Control Board Details. Rev Date Illegible)
- ML20266B424 + (Main Control Board Electrical Section Panels 11F & 11D)
- ML20261J710 + (Main Control Board Front View Panel Sect 2A. Sheet 2)
- 05000395/LER-1982-016-03, Main Control Board Indicator for Reactor Bldg Pressure (PI-950) Failed Low. Cause Still Under Investigation.Surveillance Test Procedure 303.001 Performed Satisfactorily.Channel Returned to Svc + (Main Control Board Indicator for Reactor Bldg Pressure (PI-950) Failed Low. Cause Still Under Investigation.Surveillance Test Procedure 303.001 Performed Satisfactorily.Channel Returned to Svc)
- ML20265C792 + (Main Control Board Panel A-1 & A-2 Arrangement)
- ML20265C798 + (Main Control Board Panel A-1 Arrangement)
- ML20265C824 + (Main Control Board Panel A-2 Arrangement)
- ML20266B384 + (Main Control Board Turbine Section Panels 6F & 6D)
- ML20266B406 + (Main Control Board Turbine Section Panels 9F & 9D)
- ML20259E000 + (Main Control Board,Section G. Sheet 7)
- ML20259E004 + (Main Control Board,Section G. Sheet 8)
- ML20266D925 + (Main Control Console (C01-A) Demarcation & Nameplates. Sheet 4)
- ML20266D934 + (Main Control Console (C01-B & C01-C) Demarcation & Nameplates. Sheet 6)
- ML20266D929 + (Main Control Console (C01-B) Demarcation & Nameplates. Sheet 5)
- ML20266D899 + (Main Control Panel Console & Details. Sheet 1)
- ML20266D895 + (Main Control Panel Console Instrument & Item List. Sheet 2)
- ML20263G885 + (Main Control Panel Electric Mimic Bus B01. Sheet 1 of 5)
- ML20263G874 + (Main Control Panel Electric Mimic Bus. Revision Date Illegible)
- ML20263G869 + (Main Control Panel Layout:Electric Mimic Bus Equipment List (B01). Unit 1.Sheet 3 of 5)
- ML20261K149 + (Main Control Rm & AC Equip Rm Masonry Wall Modifications Plan,Sections & Details, as-built)
- ML18153B577 + (Main Control Room & Emergency Switchgear Room Air Conditioning Sys)
- ENS 54692 + (Main Control Room Air Treatment System Inoperable)
- 05000458/FIN-2012009-01 + (Main Control Room Annunciator Control and Conduct of Operations)
- 05000220/FIN-2017004-01 + (Main Control Room Annunciators 10 CFR 50.65(a)(2) Demonstration Not Met)
- 05000293/FIN-2015003-01 + (Main Control Room Annunciators 10 CFR 50.65(a)(2) Not Met)
- ML20263F983 + (Main Control Room Arrangement)
- ML20263F663 + (Main Control Room Arrangement)
- ML20260B796 + (Main Control Room Arrangement)
- ML20263E298 + (Main Control Room Arrangement. Revision Date Illegible)
- ENS 50712 + (Main Control Room Boundary Door Did Not Properly Latch)
- 05000397/LER-2013-002, Main Control Room Cooler Failed Surveillance + (Main Control Room Cooler Failed Surveillance)
- ENS 54781 + (Main Control Room Envelope Inoperable Due to Mcr Door Being Ajar)
- ML20084L938 + (Main Control Room Fire Analysis & Evaluation for C31 Control Panel)
- ML20263F959 + (Main Control Room Floor Penetration at El 674 Ft 6 Inches and Control Panel Layout. Rev Date Illegible)
- ML20263F996 + (Main Control Room Floor Penetrations at El 659 Ft and Control Panel Layout)
- ML20261E200 + (Main Control Room Floor Penetrations at El 659 Ft and Control Panel Layout)
- ML20261E204 + (Main Control Room Floor Penetrations at El 674 Ft 6 Inches and Control Panel Layout)
- ENS 55118 + (Main Control Room Inoperable Due to Mcr Door Being Ajar)
- ML14133A507 + (Main Control Room Layout, as-built)
- ML20262H549 + (Main Control Room Layout, as-built.Consists of Three Aperture Cards Including Configuration Change Sheet)
- ML13312A863 + (Main Control Room Panel Arrangement. As-built)
- ML20262H544 + (Main Control Room Sp,Control Panel Instr Arrangement. Consists of Five Aperture Cards Including Configuration Change Sheet)
- 05000373/LER-2022-003-01, Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures + (Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures)
- 05000373/LER-2022-003, Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures + (Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures)
- ML20262J946 + (Main Coolant Piping, as-built.Sheet 1)
- ML20262J948 + (Main Coolant Piping, as-built.Sheet 2)
- ML20262J950 + (Main Coolant Piping, as-built.Sheet 3)
- ML20207H436 + (Main Coolant Pump Shaft Seal Reliability Investigation,Vol 2:Apps)
- ML20034E176 + (Main Cooling Reservoir & Essential Cooling Pond Performance During & After Filling)
- ML20215B304 + (Main Cooling Reservoir Performance Evaluation for Filling to Elevation 35. Related Correspondence)
- ML20132F698 + (Main Crankshaft Failures in Tdi Emergency Diesel Generators, Prioritization Evaluation of Generic Issue 91)
- ML19340A383 + (Main Dam Spillway Features 1,2 & Faults F4,A6,C2,F5,G,G2, G3,H & I)