Main Dam Spillway Features 1,2 & Faults F4,A6,C2,F5,G,G2, G3,H & I
ML19340A383
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 03/20/1980
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18017A986 List:
References
NUDOCS 8003260314
Download: ML19340A383 (23)


Text

7__

-T[D

,sGEo P

f

^4

~ UNITED STATES 8

NUCLEAR REGULATORY COMMISSION

^

n REGION V o

1990 N. CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA 4,,,5 WALNUT CR EEK, CALIFORNIA 94596 SEP 3 01980 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPEC' ION AND ENFORCEMENT Headquarters / Region V NOTICE OF SIGNIFICANT LICENSEE MEETING REVISED Name of Licensee: Washington Public Power. Supply System Name of Facility: Washington Nuclear Project Units 1 and 4; 3 and 5 Docket Mos.:

50-460 and 50-513; 50-508 and 50-509 Date and Time of Meeting: October 9,1980 10:30'a.m.

Location of Meeting:

Kilroy 'ower No. 2, SEA-TAC Airport, Seattle, Washington (WPPSS Offices, 4th Floor)

Purpose of Meeting: 'NRC Regional Evaluation of Licensee Performance for the period of May 1979 through July 1980 (Units 1 and 4) and August 1979 through August 1980 (Units 3 and 5)

IE Attendees:

R. H. Engelken, Regional Director, RV R. C. Haynes, RC&ES Branch, Projects Section Chief T. W. Bishop, Resident Inspector D. P. Haist, Reactor Inspector A. D. Toth, Resident Inspector Licensee Attendees:

R. L. Ferguson, Managing Director A. Squire, Deputy Managing Director D. L. Renberger, Assistant Director-Technoloay F. D. McElwee, Assistant Director - Projects M. E. Witherspoon, Division Manager - Quality Assurance A. D. Kohler - Project Manager, Units 1 and 4 D. E. Dobson - Project Manager, Units 3 and 5 Distribution:

H. D. Thornburg, Director, IE:HQ R.~H. Engelken, Director, RV D. Thompson, X00S, IE:HQ G. S.. Spencer, RC&ES Branch Chief, RV R.-L. Tedesco, Assistant Director, DL, NRR m8olosle3/I

/

t

  1. g tfnuq%

s UNITED STATES -

8 L

I NUCLEAR REGULATORY COMMISSION

'k REGION V d['

0, 1990 N. CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA 44,,*

WALNUT CREEK, CALIFORNIA 94596 3EP *i0 1980 AGENDA LICENSEE: Washington Public Power Supply System FACILITY: Washington Nuclear Projects - Units 1 and 4: 3 and 5 DATE AND TIME OF MEETING: October 9, 1980, 10:30 a.m.

LOCATION:

Kilroy Tower No. 2, SEA-TAC Airport, Seattle, Washington

SUBJECT:

NRC Regional Evaluation of Licensee Performance for period of May 1979 through July 1980 (Units 1 and 4) and August 1979 through August 1980 (Units 3 and 5) 1.

Introduction - R. H. Engelken, Director, Region V 2.

Description of NRC's Systematic Assessment of Licensee Performance Program - R. H. Engelken, Director, Region V 3.

Identification of NRC Regional Review Board Members, WNP 1 and 4 R. H. Engelken, Director, Region V a.

Summary of findings of current review - R. C. Haynes, Chief, Projects Section, Reactor Construction and Engineering Support Branch 1)

Enforcement 2)

Bulletins, reporting

3) Changes to NRC inspection program b.

Specific areas of concern - R. C. Haynes

l' i,

Agenda 4.

Identification of NRC Regional Review Board Members, WNP 3 and 5

- R. H. Engelken, Director, Region V a.

Summary of findings of current re eew - R. C. Haynes, Chief, Projects Section, Reactor Construction and Engineering Support Branch

1) Enforcement history
2) Bulletins, reporting
3) Changes in NRC inspection program b.

Specific areas of concern - R. C. aynes 5.

Questions / comments i

i r..

e t