Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML023610517 + (Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Watts Bar 1 & 2)
- ML030150840 + (Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Crystal River 3)
- ML25143A159 + (Level 2 Personnel Change at the Missouri University of Science and Technology Reactor)
- ML030850537 + (Level 2, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Fermi 2)
- ML22067A194 + (Level 3 PRA Project Volume 3 (Draft))
- ML22067A211 + (Level 3 PRA Project, Volume 3a: Reactor, At-Power, Level 1 PRA for Internal Events, Part 1 - Main Report (Draft))
- ML22067A212 + (Level 3 PRA Project, Volume 3a: Reactor, At-Power, Level 1 PRA for Internal Events, Part 2 - Appendices (Draft))
- ML22067A213 + (Level 3 PRA Project, Volume 3b: Reactor, At-Power, Level 1 PRA for Internal Floods (Draft))
- ML22067A214 + (Level 3 PRA Project, Volume 3c: Reactor, At-Power, Level 2 PRA for Internal Events and Internal Floods (Draft))
- ML22067A215 + (Level 3 PRA Project, Volume 3d: Reactor, At-Power, Level 3 PRA for Internal Events and Internal Floods (Draft))
- ML22067A210 + (Level 3 PRA Project, Volume 3x: Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Events and Internal Floods (Draft))
- ML23194A015 + (Level 3 PRA Project, Volume 4 Overview of Reactor, At-Power, Level 1, 2, and 3 PRAs for Internal Fires, Seismic Events, and High Winds; Draft Report for Comment)
- ML23194A016 + (Level 3 PRA Project, Volume 4a Reactor, At-Power, Level 1 PRA for Internal Fires; Draft Report for Release)
- ML23194A017 + (Level 3 PRA Project, Volume 4b Reactor, At-Power, Level 1 PRA for Seismic Events; Draft Report for Release)
- ML23194A012 + (Level 3 PRA Project, Volume 4c Reactor, At-Power, Level 1 PRA for High Winds and Other Hazards; Draft Report for Release)
- ML23194A013 + (Level 3 PRA Project, Volume 4d Reactor, At-Power, Level 2 PRA for Internal Fires, Seismic Events, and High Winds; Draft Report for Release)
- ML23194A014 + (Level 3 PRA Project, Volume 4e Reactor, At-Power, Level 3 PRA for Internal Fires, Seismic Events, and High Winds; Draft Report for Release)
- ML24164A010 + (Level 3 PRA Project, Volume 7: Dry Cask Storage PRA (Draft Report for Comment))
- ML19042A018 + (Level 3 Personnel Change)
- ML20009D183 + (Level Control Emergency Procedure)
- ML17256A683 + (Level Control Valve 427 Fuse Coordination - Ginna Station)
- ENS 46205 + (Level Detection Gauge Shutter Control Rod Disengaged)
- ENS 44974 + (Level Gauge Shutter Failure)
- ML20127D109 + (Level I Mgt Info Rept)
- ML18206A836 + (Level I Specification Change at the Missouri University of Science and Technology Reactor Facility, License R-79, Docket 50-123)
- ML16235A483 + (Level I Technical Specification Personnel Change at the Missouri University of Science & Technology Reactor Facility)
- ML18019A421 + (Level II and Level III Specification Change at the Missouri University of Science and Technology Reactor Facility)
- ML19028A294 + (Level III Personnel Change at the Missouri University of Science and Technology Reactor Facility, License R-79, Docket 50-123)
- Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization + (Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization)
- ML20009D188 + (Level Restoration Emergency Procedure)
- ML16274A217 + (Level of Detail Required for Design Certification Under Part 52)
- ML14098A471 + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-19-043, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-17-064, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-13-048, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-12-040, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-11-065, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-18-052, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-20-055, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-21-040, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-22-044, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-24-041, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- GO2-25-057, Level of Financial Protection - Annual Reporting Requirement + (Level of Financial Protection - Annual Reporting Requirement)
- ML040980042 + (Level of Financial Protection Annual Reporting Requirement for Columbia Generating Station)
- GO2-10-053, Level of Financial Protection Annual Reporting Requirement + (Level of Financial Protection Annual Reporting Requirement)
- GO2-09-058, Level of Financial Protection Annual Reporting Requirement + (Level of Financial Protection Annual Reporting Requirement)
- GO2-06-049, Level of Financial Protection Annual Reporting Requirement + (Level of Financial Protection Annual Reporting Requirement)
- GO2-03-055, Level of Financial Protection Annual Reporting Requirement + (Level of Financial Protection Annual Reporting Requirement)
- ML16081A393 + (Level of Financial Protection, Annual Reporting Requirement)
- ML070930293 + (Level of Financial Protection, Annual Reporting Requirement)
- GO2-15-046, Level of Financial Protection, Annual Reporting Requirement + (Level of Financial Protection, Annual Reporting Requirement)
- GO2-08-049, Level of Financial Protection, Annual Reporting Requirement + (Level of Financial Protection, Annual Reporting Requirement)
- Information Notice 1997-38, Level-Sensing System Initiates Common-Mode Faulure of High-Pressure-Injection Pumps + (Level-Sensing System Initiates Common-Mode Faulure of High-Pressure-Injection Pumps)
- ML20263G696 + (Leveling Pad)
- NRC-21-0020, Levels and Sources of Property Insurance Coverage + (Levels and Sources of Property Insurance Coverage)
- NRC-23-0024, Levels and Sources of Property Insurance Coverage + (Levels and Sources of Property Insurance Coverage)
- NRC-24-0008, Levels and Sources of Property Insurance Coverage + (Levels and Sources of Property Insurance Coverage)
- NRC-25-0017, Levels and Sources of Property Insurance Coverage + (Levels and Sources of Property Insurance Coverage)
- ML18085A567 + (Levi Mcallister, Representing the Department of Energy, Comments Regarding the February 27 - 28, 2018 Licensing Support Network Advisory Review Panel Meeting)
- ML072670384 + (Levin, S. 2000. Letter, Levin (Gpu Nuclear Inc.) to New Jersey Department of Environmental Protection. Application for Transfer of Ownership and of a Permit)
- ML21050A157 + (Levitan - Presentation_Latest Developments in Tornado Hazard Characterization and Tornado Loads on Buildings and Structures)
- ML20280A452 + (Levitan- Developments in Tornado Hazard Characterization)