Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000237/LER-1981-011-03, L-0 for Dresden, Unit 2 Re Observed Inadequacies in the Implementation of Administrative or Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection Systems or Engineered S + (L-0 for Dresden, Unit 2 Re Observed Inadequacies in the Implementation of Administrative or Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection Systems or Engineered Safety Feature)
- 05000280/LER-2078-028-03, L-0 for Surry 2 Re Containment Pressure Exceeded Allowable Limit + (L-0 for Surry 2 Re Containment Pressure Exceeded Allowable Limit)
- 05000254/LER-1976-017-03, L-0:on 760427,while Performing MSIV Surveillance, Duel Indication Received for Valves AO 1-203-1B & AO 1-203-1D.Caused by Switches Being Out of Alignment.Minor Air Leak repaired.W/760430 Forwarding Ltr + (L-0:on 760427,while Performing MSIV Surveillance, Duel Indication Received for Valves AO 1-203-1B & AO 1-203-1D.Caused by Switches Being Out of Alignment.Minor Air Leak repaired.W/760430 Forwarding Ltr)
- 05000245/LER-1979-034-03, L-0:on 791115,while Performing Routine Surveillance,Electrical Fault in Motor Controller Rendered Lcpi Inboard Isolation Stop Valve Inoperable.Caused by Contactor Arcing + (L-0:on 791115,while Performing Routine Surveillance,Electrical Fault in Motor Controller Rendered Lcpi Inboard Isolation Stop Valve Inoperable.Caused by Contactor Arcing)
- 05000315/LER-1981-012-03, L-0:on 810428,Steam Generator 2,Channel 4 Level Indication Found Indicating High.Caused by Leak on Ref Line of Transmitter BLP-120.Leak Suspected Inside Containment & Will Be Corrected on Next Refueling Outage + (L-0:on 810428,Steam Generator 2,Channel 4 Level Indication Found Indicating High.Caused by Leak on Ref Line of Transmitter BLP-120.Leak Suspected Inside Containment & Will Be Corrected on Next Refueling Outage)
- 05000311/LER-1982-013-03, L-0:on 820215,shift Supervisor Informed That Two 4-inch Core Bores Opened on 78-ft Elevation Between Mechanical & Electrical Penetration Areas.No Fire Watch Posted.Caused by Inadvertently Posting Watch on Wrong Unit + (L-0:on 820215,shift Supervisor Informed That Two 4-inch Core Bores Opened on 78-ft Elevation Between Mechanical & Electrical Penetration Areas.No Fire Watch Posted.Caused by Inadvertently Posting Watch on Wrong Unit)
- ML20054A850 + (L-0:on 820303,during Mode 3 Operation,One Auxiliary Feedwater Automatic Control Valve Controller 2-LIC-3-173 Inoperable.Caused by Open Loop Due to Loose Connection at Controller.Connection Tightened)
- ML19003A507 + (L-2017-PMP-0001 Release of Areva Letters of Credit SB22-401 and SB22-493 (002))
- L-2018-136, L-2018-136-Attachment 16 Enclosure 1 - Letter Regarding Turkey Point Power: Mcgregor Smith Ranger House Potential Restoration Project + (L-2018-136-Attachment 16 Enclosure 1 - Letter Regarding Turkey Point Power: Mcgregor Smith Ranger House Potential Restoration Project)
- ML18247A524 + (L-2018-136-Attachment 16 Enclosure 1 - Letter Regarding Turkey Point Power: Mcgregor Smith Ranger House Potential Restoration Project)
- L-2018-136, L-2018-136-Attachment 19 Enclosure 1 - Expert Report of Ron Seagraves for Southern Alliance for Clean Energy, Et Al. V. Florida Power & Light Co., Case No. 1:16-cv-23017 (S.D Fla.) + (L-2018-136-Attachment 19 Enclosure 1 - Expert Report of Ron Seagraves for Southern Alliance for Clean Energy, Et Al. V. Florida Power & Light Co., Case No. 1:16-cv-23017 (S.D Fla.))
- ML18247A525 + (L-2018-136-Attachment 19 Enclosure 1 - Expert Report of Ron Seagraves for Southern Alliance for Clean Energy, Et Al. V. Florida Power & Light Co., Case No. 1:16-cv-23017 (S.D Fla.))
- L-2018-136, L-2018-136-Attachment 20 Enclosure 1 - E-Mail Result of Least Tern Survey at Turkey Point + (L-2018-136-Attachment 20 Enclosure 1 - E-Mail Result of Least Tern Survey at Turkey Point)
- ML18247A526 + (L-2018-136-Attachment 20 Enclosure 1 - E-Mail Result of Least Tern Survey at Turkey Point)
- L-2018-136, L-2018-136-Attachment 20 Enclosure 2 - E-Mail St. Lucie Power Plant Discussing 2017 and 2018 Data Summary + (L-2018-136-Attachment 20 Enclosure 2 - E-Mail St. Lucie Power Plant Discussing 2017 and 2018 Data Summary)
- ML18247A527 + (L-2018-136-Attachment 20 Enclosure 2 - E-Mail St. Lucie Power Plant Discussing 2017 and 2018 Data Summary)
- L-2018-136, L-2018-136-Attachment 21 Enclosure 1 - Eastern Indigo Stake (Drymarchon Couperi) M-Rc Survey Form Dated 06/20/2013 + (L-2018-136-Attachment 21 Enclosure 1 - Eastern Indigo Stake (Drymarchon Couperi) M-Rc Survey Form Dated 06/20/2013)
- ML18247A529 + (L-2018-136-Attachment 21 Enclosure 1 - Eastern Indigo Stake (Drymarchon Couperi) M-Rc Survey Form Dated 06/20/2013)
- L-2018-136, L-2018-136-Attachment 21 Enclosure 2 - Eastern Indigo Snake (Drymarchon Couperi) M-Rc Survey Form Dated 10/19/2016 + (L-2018-136-Attachment 21 Enclosure 2 - Eastern Indigo Snake (Drymarchon Couperi) M-Rc Survey Form Dated 10/19/2016)
- ML18247A530 + (L-2018-136-Attachment 21 Enclosure 2 - Eastern Indigo Snake (Drymarchon Couperi) M-Rc Survey Form Dated 10/19/2016)
- L-2018-136, L-2018-136-Attachment 22 Enclosure 1 - FPL Response to NRC RAI No. SS-FWS-3 + (L-2018-136-Attachment 22 Enclosure 1 - FPL Response to NRC RAI No. SS-FWS-3)
- ML18247A531 + (L-2018-136-Attachment 22 Enclosure 1 - FPL Response to NRC RAI No. SS-FWS-3)
- L-2018-136, L-2018-136-Attachment 22 Enclosure 2 - 01/31/2017 Letter Submitting 2016 Annual Report for the Federal Fish & Wildlife Endangered Species Permit + (L-2018-136-Attachment 22 Enclosure 2 - 01/31/2017 Letter Submitting 2016 Annual Report for the Federal Fish & Wildlife Endangered Species Permit)
- ML18247A532 + (L-2018-136-Attachment 22 Enclosure 2 - 01/31/2017 Letter Submitting 2016 Annual Report for the Federal Fish & Wildlife Endangered Species Permit)
- L-2018-136, L-2018-136-Attachment 22 Enclosure 3 - Submittal of Florida Power & Light Company'S 2017 Annual Report for the Federal Fish & Wildlife Endangered Species Permit + (L-2018-136-Attachment 22 Enclosure 3 - Submittal of Florida Power & Light Company'S 2017 Annual Report for the Federal Fish & Wildlife Endangered Species Permit)
- ML18247A533 + (L-2018-136-Attachment 22 Enclosure 3 - Submittal of Florida Power & Light Companys 2017 Annual Report for the Federal Fish & Wildlife Endangered Species Permit)
- L-2018-136, L-2018-136-Attachment 22 Enclosure 4 - Spreadsheet + (L-2018-136-Attachment 22 Enclosure 4 - Spreadsheet)
- ML18247A534 + (L-2018-136-Attachment 22 Enclosure 4 - Spreadsheet)
- L-2018-136, L-2018-136-Attachment 25 Enclosure 1 - Us Dept. of the Army Letter Regarding Authorization of Placement 181,000 Cubic Yards of Fill Over 7.5 Acres + (L-2018-136-Attachment 25 Enclosure 1 - Us Dept. of the Army Letter Regarding Authorization of Placement 181,000 Cubic Yards of Fill Over 7.5 Acres)
- ML18247A535 + (L-2018-136-Attachment 25 Enclosure 1 - Us Dept. of the Army Letter Regarding Authorization of Placement 181,000 Cubic Yards of Fill Over 7.5 Acres)
- L-2018-136, L-2018-136-Attachment 28 Enclosure 1 - Figures, Page 1 of 60 Through Page 60 of 60 + (L-2018-136-Attachment 28 Enclosure 1 - Figures, Page 1 of 60 Through Page 60 of 60)
- ML18247A536 + (L-2018-136-Attachment 28 Enclosure 1 - Figures, Page 1 of 60 Through Page 60 of 60)
- L-2018-136, L-2018-136-Attachment 32 Enclosure 1 - Exhibit B-1 - Detailed Scope of Work for Grounds Keeping Duties in Support of the Turkey Point Land Utilization Services and Cooling Canal System Maintenance Group + (L-2018-136-Attachment 32 Enclosure 1 - Exhibit B-1 - Detailed Scope of Work for Grounds Keeping Duties in Support of the Turkey Point Land Utilization Services and Cooling Canal System Maintenance Group)
- ML18247A537 + (L-2018-136-Attachment 32 Enclosure 1 - Exhibit B-1 - Detailed Scope of Work for Grounds Keeping Duties in Support of the Turkey Point Land Utilization Services and Cooling Canal System Maintenance Group)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 1 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Thirty-Ninth Quarterly Well Report + (L-2018-136-Attachment 43 Enclosure 1 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Thirty-Ninth Quarterly Well Report)
- ML18247A540 + (L-2018-136-Attachment 43 Enclosure 1 - Submittal of FPL Turkey Point, Unit 5 Groundwater Monitoring Plan Thirty-Ninth Quarterly Well Report)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 10 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Units 3-5 + (L-2018-136-Attachment 43 Enclosure 10 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Units 3-5)
- ML18247A549 + (L-2018-136-Attachment 43 Enclosure 10 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Units 3-5)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 11 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Seventh Quarterly Well Report + (L-2018-136-Attachment 43 Enclosure 11 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Seventh Quarterly Well Report)
- ML18247A550 + (L-2018-136-Attachment 43 Enclosure 11 - FPL Turkey Point Unit 5 Groundwater Monitoring Plan Forty-Seventh Quarterly Well Report)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 12 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Unit 3-5 + (L-2018-136-Attachment 43 Enclosure 12 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Unit 3-5)
- ML18247A551 + (L-2018-136-Attachment 43 Enclosure 12 - Florida Power & Light Company - Conditions of Certification PA 03-45E for Turkey Point Unit 3-5)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 13 - Florida Power & Light Company - Conditions of Certification PA-03-45E for Turkey Point Units 3-5 + (L-2018-136-Attachment 43 Enclosure 13 - Florida Power & Light Company - Conditions of Certification PA-03-45E for Turkey Point Units 3-5)
- ML18247A552 + (L-2018-136-Attachment 43 Enclosure 13 - Florida Power & Light Company - Conditions of Certification PA-03-45E for Turkey Point Units 3-5)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 14 - South Florida Water Management District Pumpage Report for Water Use Permit + (L-2018-136-Attachment 43 Enclosure 14 - South Florida Water Management District Pumpage Report for Water Use Permit)
- ML18247A553 + (L-2018-136-Attachment 43 Enclosure 14 - South Florida Water Management District Pumpage Report for Water Use Permit)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 15 - FPL Turkey Point Unit 5 Quarterly Well Report + (L-2018-136-Attachment 43 Enclosure 15 - FPL Turkey Point Unit 5 Quarterly Well Report)
- ML18247A554 + (L-2018-136-Attachment 43 Enclosure 15 - FPL Turkey Point Unit 5 Quarterly Well Report)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 16 - South Florida Water Management District Pumpage Report for Water Use Permit + (L-2018-136-Attachment 43 Enclosure 16 - South Florida Water Management District Pumpage Report for Water Use Permit)
- ML18247A555 + (L-2018-136-Attachment 43 Enclosure 16 - South Florida Water Management District Pumpage Report for Water Use Permit)
- L-2018-136, L-2018-136-Attachment 43 Enclosure 17 - South Florida Water Management District Pumpage Report for Water Use Permit + (L-2018-136-Attachment 43 Enclosure 17 - South Florida Water Management District Pumpage Report for Water Use Permit)
- ML18247A556 + (L-2018-136-Attachment 43 Enclosure 17 - South Florida Water Management District Pumpage Report for Water Use Permit)