Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Interim Reliability Evaluation Program Procedures Guide". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20210L801  + (Interim Potentially Reportable Significant Deficiency Rept 86-05 Re 860315 Diesel Generator Exhaust Pipe Insulation Failure & Subsequent Fire.Initially Reported on 860318. Evaluation in Progress.Final Rept by 860515)
  • ML20117C833  + (Interim Potentially Significant Deficiency Rept (Rdc 132(85)) Re Starting Voltages to Some Class 1E Power Sys During Degraded Offsite Power & Loca.Initially Reported on 850401.Design Changes Pursued to Modify Class 1E Loads)
  • ML20212E287  + (Interim Potentially Significant Deficiency Rept 86-06 Re 480-volt Ite/Telemecanique Circuit Breakers.Caused by Latch Cam Design Change.Latch Cams to Be Replaced.Next Rept Expected After Safety Evaluation Completed)
  • ML19347C334  + (Interim Preliminary Draft Rept to ACRS, Review of Recent Malfunctions of BWR Scram Sys)
  • ML19345D619  + (Interim Procedure (IP) SA-100 - Implementation of the Integrated Materials Performance Evaluation Program (Impep))
  • ML19351E407  + (Interim Procedure (IP) SA-104, Reviewing the Common Performance Indicator, Technical Quality of Licensing Actions)
  • ML19318E233  + (Interim Procedure (IP) SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Allegation Activities)
  • ML19324F028  + (Interim Procedure (IP) SA-108, Reviewing the Non-Common Performance Indicator, Sealed Source and Device Evaluation Program)
  • ML19324D066  + (Interim Procedure (IP) SA-110, Reviewing the Non-Common Performance Indicator, Uranium Recovery Program)
  • ML21082A081  + (Interim Procedure (IP) SA-700 Handbook for Processing an Agreement)
  • ML17213B099  + (Interim Procedure Guidelines for Core Damage Assessment)
  • ML17293A201  + (Interim Procedure SA-105, Reviewing the Common Performance Indicator, Technical Quality of Incident and Allegation Activities)
  • ML19326B466  + (Interim Procedure SA-106 - the Management Review Board)
  • ML19311C783  + (Interim Procedure SA-107, Reviewing the Non-Common Performance Indicator, Legislation, Regulations, and Other Program Elements)
  • ML19311C784  + (Interim Procedure SA-200, Compatibility Categories and Health and Safety Identification for NRC Regulations and Other Program Elements)
  • ML19311C779  + (Interim Procedure SA-201, Review of State Regulatory Requirements)
  • ML20062J065  + (Interim Procedures for Agency Appellate Review, Final Rule.Rule Puts Into Place Transition Plan NRC Adopting to Handle All Appeals from Initial Decisions of Presiding Officers in All Formal & Informal Agency Adjudications)
  • ML20148N964  + (Interim Progress Rept Yellowcake Solubility-Quarterly Status Rept 1. Rept Discusses Problems to Be Overcome, Meetings W/Nrc,State Officials & Uranium Mill Representatives & Conclusions Reached to Date)
  • ML20148P511  + (Interim Progress Rept for 780401-780731,Validation of Nuc Fuel Cycle Facil Dose Assessment Models. Presents Results of Subtask 4:to Relate Uncertainty Assoc W/Variability of Data to the Values Assumed Appropriate by NRC)
  • ML19281A119  + (Interim Progress Rept for Nov-Dec 1978, Physical Protection of Nuclear Matl in Transit)
  • ML19263C702  + (Interim Progress Rept of cost-benefit Analysis Group.Lists Anticipated & Attained Schedules for Major Milestones, Including Statement Casework,Technical Projects & Research Projects)
  • ML19269E178  + (Interim Progress Rept, Chemical Effluents in Surface Waters from Nuclear Power Plants)
  • ML19269E181  + (Interim Progress Rept, Chemical Effluents in Surface Waters from Nuclear Power Plants)
  • ML18057A388  + (Interim Provisional License DPR-20 for Facility)
  • ML19317D516  + (Interim Radwaste Bldg General Arrangement/Architecture Plans & Sections)
  • ML20072R542  + (Interim Reliability Evaluation Program Procedures Guide)
  • ML19344A582  + (Interim Reliability Evaluation Program,Phase Ii,Procedure & Schedule Guide, Draft Revision 1.Related Matl Encl)
  • ML20076E240  + (Interim Reliability Evaluation Program: Analysis of the Millstone Point Unit I Nuclear Power Plant.Docket No. 50-245.(Northeast Utilities))
  • ML20100J448  + (Interim Reliability Evaluation Program:Analysis of the Calvert Cliffs Unit 1 Nuclear Power Plant.Volume II, Appendices A,B and C)
  • ML18025B878  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix A-Event Trees. Docket No. 50-259.(Tennessee Valley Authority))
  • ML20077F096  + (Interim Reliability Evaluation Program:Analysis of the Millstone Point Unit 1 Nuclear Power Plant.Vol III Appendix B.5 Thru B.8.Docket No. 50-245.(Northeast Nuclear Energy))
  • ML20080C020  + (Interim Reliability Evaluation Program:Analysis of the Millstone Point Unit 1 Nuclear Power Plant.Vol II - Appendix a and B.1 Thru B.4.Docket No. 50-245.(Northeast Nuclear Energy Company))
  • ML20090H871  + (Interim Reliability Evaluation Program:Analysis of the Calvert Cliffs Unit 1 Nuclear Power Plant.Volume 1.Main Report)
  • ML20085E215  + (Interim Reliability Evaluation Program:Analysis of the Millstone Point Unit 1 Nuclear Power Plant.Vol IV Appendix B.9 Thru B.19 and C.Docket No.50-245.(Northeast Nuclear Energy))
  • ML18025B877  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix B-System Descriptions and Fault Trees.Docket No. 50-259.(Tennessee Valley Authority))
  • ML18025B880  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Appendix C-Sequence Quantification.Docket No. 50-259.(Tennessee Valley Authority))
  • ML20064M278  + (Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company))
  • ML18025B876  + (Interim Reliability Evaluation Program:Analysis of the Browns Ferry,Unit 1,NUCLEAR Plant.Docket No. 50-259. (Tennessee Valley Authority))
  • ML20063P327  + (Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility)
  • ML14090A432  + (Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62)
  • ML14090A431  + (Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Testing of PV-62)
  • ML14192A040  + (Interim Report - 10CFR Part 21 Evaluation Regarding Potential Deficiencies)
  • ML13358A306  + (Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Cracking in KCR-13 Standby Battery Jars)
  • ML14094A012  + (Interim Report - Inability to Complete 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries)
  • ENS 50681  + (Interim Report - Potential Part 21 Notification)
  • ML14129A436  + (Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing)
  • ML14252A309  + (Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met)
  • ML14241A238  + (Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met)
  • ENS 47735  + (Interim Report Concerning Battery Cells with Potentially Reduced Discharge Capacity)
  • ML12073A347  + (Interim Report Concerning Battery Cells with Potentially Reduced Discharge Capacity)
  • ML17142A323  + (Interim Report Concerning Supply of Stainless Steel Tubing)