Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147E776 + (Integrated Matls Performance Evaluation Program Review of CA Agreement State Program, 961021-25,Draft Rept)
- ML20203D371 + (Integrated Matls Performance Evaluation Program Review of Nebraska Agreement State Program of 980921-25)
- ML20134B452 + (Integrated Matls Performance Evaluation Program Review of Nebraska Agreement State Program, for Period 960715-19)
- ML20236V328 + (Integrated Matls Performance Evaluation Program Review of Alabama Agreement State Program,980420-23, Final Rept)
- ML20195H592 + (Integrated Matls Performance Program Review of Oregon Agreement State Program, 980810-13)
- ML20261C182 + (Integrated Milestone Schedule Clinton Power Station Status as of July 31,1983. Sheet 1 of 1.Drawing Consists of Two Aperture Cards)
- ML24292A077 + (Integrated Multisite SSHAC Level 3 Probabilistic Volcanic Hazard Assessment)
- ML24292A076 + (Integrated Multisite SSHAC Level 3 Probabilistic Volcanic Hazard Assessment)
- ML21063A012 + (Integrated Nonlinear SSI Analysis: the CGD Challenge)
- ML19212A345 + (Integrated Notes of Meetings on 760929,1012,1101,08 & 15)
- ML20126K018 + (Integrated Operations Agreement Between City of Anaheim & Util)
- IR 05000213/1986029 + (Integrated Performance Assessment Insp Rept 50-213/86-29 on 861114-21.No Fundamental Weaknesses Noted.Major Areas Inspected:Operations,Radiological Controls,Maint, Surveillance,Security/Safeguards,Training & QA)
- IR 05000219/1987024 + (Integrated Performance Assessment Team Insp Rept 50-219/87-24 on 870810-21.No Violations Noted.Major Areas Inspected:Operations,Maint,Surveillance Radiation Control & Onsite Engineering Support)
- IR 05000272/1990081 + (Integrated Performance Assessment Team Insp 50-272/90-81 & 50-311/90-81 on 900514-25.Weaknesses Noted.Major Areas Inspected:Evaluation of Current Status of Perceived Decline in Performance Identified in Recent SALP Rept)
- LIC-12-0098, Integrated Performance Improvement Plan, Rev. 3 + (Integrated Performance Improvement Plan, Rev. 3)
- LIC-12-0165, Integrated Performance Improvement Plan, Revision 4 + (Integrated Performance Improvement Plan, Revision 4)
- ML13172A351 + (Integrated Performance Improvement Plan, Revision 5 - Cover Letter)
- ML13172A343 + (Integrated Performance Improvement Plan, Revision 5, Page 138 Through End)
- LIC-13-0086, Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73 + (Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73)
- ML13172A342 + (Integrated Performance Improvement Plan, Revision 5, Page 74 Through Page 137)
- ML15232A028 + (Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- ML13064A353 + (Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 2-051))
- RC-13-0031, Integrated Plan with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Integrated Plan with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- ML20096D732 + (Integrated Plant Assessment Methodology, Rev 1)
- ML20056C252 + (Integrated Plant Assessment Methodology,Vol 2:Component Evaluation)
- ENS 46321 + (Integrated Plant Computer Removed from Service for Upgrade Work)
- ENS 48468 + (Integrated Plant Computer System Out-Of-Service Outside the Control Room for Planned Maintenance)
- ENS 51516 + (Integrated Plant Computer System Removed from Service)
- ENS 49851 + (Integrated Plant Computer System Removed from Service for Planned Maintenance)
- ML17256A441 + (Integrated Plant Safety Assessment REPORT-SYSTEMATIC Evaluation Program.R. E. Ginna Nuclear Power Plant.Docket No. 50-244.(Rochester Gas & Electric Corporation))
- ML17255A392 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - R. E. Ginna Nuclear Power Plant.Docket No. 50-244.(Rochester Gas and Electric Corporation))
- ML20151H606 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - Lacrosse Boiling Water Reactor.Docket No. 50-409.(Dairyland Power Cooperative))
- ML13333B096 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program.San Onofre Nuclear Generating Station Unit 1.Docket No. 50-206.(Southern California Edison Company))
- ML20076M732 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program,Yankee Nuclear Power Station.Docket No. 50-029.(Yankee Atomic Electric Company))
- ML20085K391 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - Big Rock Point Plant.Docket No. 50-155. (Consumers Power Company))
- ML18051A679 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program.Palisades Plant.Docket No. 50-255. (Consumers Power Company))
- ML20080A756 + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-LACROSSE Boiling Water Reactor.Docket No.50-409.(Dairyland Power Cooperative))
- ML20071D904 + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-YANKEE Nuclear Power Station.Docket No. 50-029.(Yankee Atomic Electric Company))
- ML20138A799 + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-MILLSTONE Nuclear Power Station,Unit 1. Docket No. 50-245. (Northeast Nuclear Energy Company))
- ML20080A747 + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-HADDAM Neck Plant.Docket No. 50-213. (Connecticut Yankee Atomic Power Company))
- ML20127P703 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - San Onofre Nuclear Generating Station Unit 1.Docket No. 50-206.(Southern California Edison Company))
- ML20091N274 + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program.Big Rock Point Plant.Docket No. 50-155. (Consumers Power Company))
- ML20072F213 + (Integrated Plant Safety Assessment Systematic Evaluation PROGRAM-MILLSTONE Nuclear Power Station,Unit 1.Docket No. 50-245.(Northeast Nuclear Energy Company))
- ML20212L153 + (Integrated Plant Safety Assessment Systematic Evaluation Program - Lacrosse Boiling Water Reactor.Docket No. 50-409. (Dairyland Power Cooperative))
- ML17256B030 + (Integrated Plant Safety Assessment Systematic Evaluation Program for R.E. Ginna Nuclear Power Plant.Docket No. 50-244.(Rochester Gas & Electric Corporation))
- ML20054A642 + (Integrated Plant Safety Assessment Systematic Evaluation Program for Palisades Plant.Docket No. 50-255.(Consumers Power Company))
- ML20151W259 + (Integrated Plant Safety Assessment Systematic Evaluation PROGRAM-OYSTER Creek Nuclear Generating Station.Docket No. 50-219.(General Public Utilities Corporation and Jersey Central Power and Light Company))
- ML20063C569 + (Integrated Plant Safety Assessment,Ginna Plant,Sep, Technical Evaluation Rept of Draft NUREG-0821)
- ML20236A481 + (Integrated Plant Safety Assessment,Systematic Evaluation Program,Yankee Nuclear Power Station.Docket No. 50-029. (Yankee Atomic Electric Company))
- ML20072P008 + (Integrated Plant Safety Assessment,Systematic Evaluation PROGRAM-HADDAM Neck Plant.Docket No. 50-213.(Connecticut Yankee Atomic Power Company))