Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Integrated Plant Computer Failure". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20147E776  + (Integrated Matls Performance Evaluation Program Review of CA Agreement State Program, 961021-25,Draft Rept)
  • ML20203D371  + (Integrated Matls Performance Evaluation Program Review of Nebraska Agreement State Program of 980921-25)
  • ML20134B452  + (Integrated Matls Performance Evaluation Program Review of Nebraska Agreement State Program, for Period 960715-19)
  • ML20236V328  + (Integrated Matls Performance Evaluation Program Review of Alabama Agreement State Program,980420-23, Final Rept)
  • ML20195H592  + (Integrated Matls Performance Program Review of Oregon Agreement State Program, 980810-13)
  • ML20261C182  + (Integrated Milestone Schedule Clinton Power Station Status as of July 31,1983. Sheet 1 of 1.Drawing Consists of Two Aperture Cards)
  • ML24292A077  + (Integrated Multisite SSHAC Level 3 Probabilistic Volcanic Hazard Assessment)
  • ML24292A076  + (Integrated Multisite SSHAC Level 3 Probabilistic Volcanic Hazard Assessment)
  • ML21063A012  + (Integrated Nonlinear SSI Analysis: the CGD Challenge)
  • ML19212A345  + (Integrated Notes of Meetings on 760929,1012,1101,08 & 15)
  • ML20126K018  + (Integrated Operations Agreement Between City of Anaheim & Util)
  • IR 05000213/1986029  + (Integrated Performance Assessment Insp Rept 50-213/86-29 on 861114-21.No Fundamental Weaknesses Noted.Major Areas Inspected:Operations,Radiological Controls,Maint, Surveillance,Security/Safeguards,Training & QA)
  • IR 05000219/1987024  + (Integrated Performance Assessment Team Insp Rept 50-219/87-24 on 870810-21.No Violations Noted.Major Areas Inspected:Operations,Maint,Surveillance Radiation Control & Onsite Engineering Support)
  • IR 05000272/1990081  + (Integrated Performance Assessment Team Insp 50-272/90-81 & 50-311/90-81 on 900514-25.Weaknesses Noted.Major Areas Inspected:Evaluation of Current Status of Perceived Decline in Performance Identified in Recent SALP Rept)
  • LIC-12-0098, Integrated Performance Improvement Plan, Rev. 3  + (Integrated Performance Improvement Plan, Rev. 3)
  • LIC-12-0165, Integrated Performance Improvement Plan, Revision 4  + (Integrated Performance Improvement Plan, Revision 4)
  • ML13172A351  + (Integrated Performance Improvement Plan, Revision 5 - Cover Letter)
  • ML13172A343  + (Integrated Performance Improvement Plan, Revision 5, Page 138 Through End)
  • LIC-13-0086, Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73  + (Integrated Performance Improvement Plan, Revision 5, Cover Through Page 73)
  • ML13172A342  + (Integrated Performance Improvement Plan, Revision 5, Page 74 Through Page 137)
  • ML15232A028  + (Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
  • ML13064A353  + (Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 2-051))
  • RC-13-0031, Integrated Plan with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)  + (Integrated Plan with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
  • ML20096D732  + (Integrated Plant Assessment Methodology, Rev 1)
  • ML20056C252  + (Integrated Plant Assessment Methodology,Vol 2:Component Evaluation)
  • ENS 48197  + (Integrated Plant Computer Failure)
  • ENS 46321  + (Integrated Plant Computer Removed from Service for Upgrade Work)
  • ENS 48468  + (Integrated Plant Computer System Out-Of-Service Outside the Control Room for Planned Maintenance)
  • ENS 51516  + (Integrated Plant Computer System Removed from Service)
  • ENS 49851  + (Integrated Plant Computer System Removed from Service for Planned Maintenance)
  • ML17256A441  + (Integrated Plant Safety Assessment REPORT-SYSTEMATIC Evaluation Program.R. E. Ginna Nuclear Power Plant.Docket No. 50-244.(Rochester Gas & Electric Corporation))
  • ML17255A392  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - R. E. Ginna Nuclear Power Plant.Docket No. 50-244.(Rochester Gas and Electric Corporation))
  • ML20151H606  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - Lacrosse Boiling Water Reactor.Docket No. 50-409.(Dairyland Power Cooperative))
  • ML13333B096  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program.San Onofre Nuclear Generating Station Unit 1.Docket No. 50-206.(Southern California Edison Company))
  • ML20076M732  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program,Yankee Nuclear Power Station.Docket No. 50-029.(Yankee Atomic Electric Company))
  • ML20085K391  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - Big Rock Point Plant.Docket No. 50-155. (Consumers Power Company))
  • ML18051A679  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program.Palisades Plant.Docket No. 50-255. (Consumers Power Company))
  • ML20080A756  + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-LACROSSE Boiling Water Reactor.Docket No.50-409.(Dairyland Power Cooperative))
  • ML20071D904  + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-YANKEE Nuclear Power Station.Docket No. 50-029.(Yankee Atomic Electric Company))
  • ML20138A799  + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-MILLSTONE Nuclear Power Station,Unit 1. Docket No. 50-245. (Northeast Nuclear Energy Company))
  • ML20080A747  + (Integrated Plant Safety Assessment Report,Systematic Evaluation PROGRAM-HADDAM Neck Plant.Docket No. 50-213. (Connecticut Yankee Atomic Power Company))
  • ML20127P703  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program - San Onofre Nuclear Generating Station Unit 1.Docket No. 50-206.(Southern California Edison Company))
  • ML20091N274  + (Integrated Plant Safety Assessment Report,Systematic Evaluation Program.Big Rock Point Plant.Docket No. 50-155. (Consumers Power Company))
  • ML20072F213  + (Integrated Plant Safety Assessment Systematic Evaluation PROGRAM-MILLSTONE Nuclear Power Station,Unit 1.Docket No. 50-245.(Northeast Nuclear Energy Company))
  • ML20212L153  + (Integrated Plant Safety Assessment Systematic Evaluation Program - Lacrosse Boiling Water Reactor.Docket No. 50-409. (Dairyland Power Cooperative))
  • ML17256B030  + (Integrated Plant Safety Assessment Systematic Evaluation Program for R.E. Ginna Nuclear Power Plant.Docket No. 50-244.(Rochester Gas & Electric Corporation))
  • ML20054A642  + (Integrated Plant Safety Assessment Systematic Evaluation Program for Palisades Plant.Docket No. 50-255.(Consumers Power Company))
  • ML20151W259  + (Integrated Plant Safety Assessment Systematic Evaluation PROGRAM-OYSTER Creek Nuclear Generating Station.Docket No. 50-219.(General Public Utilities Corporation and Jersey Central Power and Light Company))
  • ML20063C569  + (Integrated Plant Safety Assessment,Ginna Plant,Sep, Technical Evaluation Rept of Draft NUREG-0821)
  • ML20236A481  + (Integrated Plant Safety Assessment,Systematic Evaluation Program,Yankee Nuclear Power Station.Docket No. 50-029. (Yankee Atomic Electric Company))
  • ML20072P008  + (Integrated Plant Safety Assessment,Systematic Evaluation PROGRAM-HADDAM Neck Plant.Docket No. 50-213.(Connecticut Yankee Atomic Power Company))