- 05000483/LER-2003-003, Incorrect Steam Generator Tube Rupture Analysis Contained in FSAR + (Incorrect Steam Generator Tube Rupture Analysis Contained in FSAR)
- 05000305/FIN-2011004-06 + (Incorrect Transformer Load Tap Changer Setting Causes Inoperable Offsite Power)
- 05000305/FIN-2013002-01 + (Incorrect Ultimate Heat Sink Water Level)
- NLS2007047, Incorrect Units Specified in Dose Calculations + (Incorrect Units Specified in Dose Calculations)
- ML072320065 + (Incorrect Units Specified in Dose Calculations)
- Information Notice 1997-60, Incorrect Unreviewed Safety Question Determination Related to Emergency Core Cooling System Swapover from the Injection Mode to the Recriculation Mode + (Incorrect Unreviewed Safety Question Determination Related to Emergency Core Cooling System Swapover from the Injection Mode to the Recriculation Mode)
- 05000395/LER-2002-002, Incorrect Value in Fuel Handling Accident Analysis + (Incorrect Value in Fuel Handling Accident Analysis)
- 05000341/FIN-2014007-01 + (Incorrect Valve Location in Procedure)
- 05000445/FIN-2015005-01 + (Incorrect Visual Resolution Requirements in Augmented Dissimilar Metal Weld Visual Examination Procedures)
- 05000254/FIN-2010003-03 + (Incorrect Wind Direction on NARS Form)
- 05000266/FIN-2016002-06 + (Incorrect Wiring Causes Transformer Lockout)
- 05000346/FIN-2009005-04 + (Incorrect Wiring of Service Water Strainer Starter 2 Contactor Causing Inoperability)
- 05000277/FIN-2007002-04 + (Incorrect size breaker resulted in a fire in the 4T4 480 volt load center)
- 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications + (Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications)
- 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications + (Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications)
- 05000305/FIN-2012002-01 + (Incorrectly Modeled Ventilation Damper Changes Daily Risk Color)
- 05000336/LER-2021-001, Incorrectly Placed Spent Fuel Assemblies in Unit 2 Spent Fuel Pool + (Incorrectly Placed Spent Fuel Assemblies in Unit 2 Spent Fuel Pool)
- 05000313/FIN-2012005-08 + (Incorrectly Positioned Manual Jack Sleeve Results in Feedwater Regulating Valve not Fully Closing)
- TSTF-370 + (Increase Accumulator Completion Time from 1 Hour to 24 Hours - WCAP-15049)
- ML19324F481 + (Increase Allowable MSIV Leakage Rates)
- TSTF-537 + (Increase CIV Completion Time - Update of TSTF-373)
- TSTF-373 + (Increase CIV Completion Time from 72 Hours to 7 Days (NPSD-1168))
- TSTF-223 + (Increase Completion Time for HPCI and One ADS Valve Inoperable)
- TSTF-224 + (Increase Completion Time for One ADS and One LOW Pressure ECCS Inoperable)
- TSTF-359 + (Increase Flexibility in Mode Restraints)
- ML23212A986 + (Increase in American Nuclear Insurers (ANI) Available Primary Liability Insurance Capacity)
- 05000259/LER-1980-049-03, Increase in Pressure Detected on Shell Side of RHR 1-C Hx.Caused by Loose Locking & Full Nuts on Floating Head Due to Thermal Cycling & Vibration.Locking Tabs Installed on Nuts + (Increase in Pressure Detected on Shell Side of RHR 1-C Hx.Caused by Loose Locking & Full Nuts on Floating Head Due to Thermal Cycling & Vibration.Locking Tabs Installed on Nuts)
- ML020800006 + (Increase in the Maximum Fuel rod-average burn-up Limit)
- TSTF-142 + (Increase the Completion Time When the Core Reactivity Balance is Not within Limit)
- TSTF-242 + (Increase the Time to Perform a Cot on Power Range and Intermediate Range Instruments)
- ML18348A881 + (Increase to 2530 Mwt Report, 12/14/1977, Documents Test Results, & Met All Acceptance Criteria & Limits)
- 05000255/FIN-2007006-05 + (Increased Airborne Radioactivity in Containment)
- 05000416/LER-2008-003, Increased Buss Voltages Results in Breaker Trip on Over Current of a High Pressure Core Spray Pump Low Flow Valve Resulting in Non-Compliance with Technical Specification 3.6.1.3, Primary Containment Isolation + (Increased Buss Voltages Results in Breaker Trip on Over Current of a High Pressure Core Spray Pump Low Flow Valve Resulting in Non-Compliance with Technical Specification 3.6.1.3, Primary Containment Isolation.)
- Information Notice 1994-72, Increased Control Rod Drop Time from Crud Buildup + (Increased Control Rod Drop Time from Crud Buildup)
- ML20077C507 + (Increased Core Flow & Extended Load Line Limit Analysis for Hope Creek Generating Station Unit 1,Cycle 2)
- ML20207B389 + (Increased Core Flow & Partial Feedwater Heating Analysis for Limerick Generating Station Unit 1 Cycle 1. Related Correspondence)
- Information Notice 2020-01, Increased Electronic Equipment Issues After Electrostatic Cleaning + (Increased Electronic Equipment Issues After Electrostatic Cleaning)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices are Installed + (Increased Instrument Response Time When Pressure Dampening Devices are Installed)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices Are Installed + (Increased Instrument Response Time When Pressure Dampening Devices Are Installed)
- ML18039A882 + (Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept)
- Information Notice 1986-59, Increased Monitoring of Certain Patients with Implanted Coratomic, Inc. Model C-100 and C-101 Nuclear-Powered Cardiac Pacemakers + (Increased Monitoring of Certain Patients with Implanted Coratomic, Inc. Model C-100 and C-101 Nuclear-Powered Cardiac Pacemakers)
- 05000334/LER-1981-077-03, Increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue + (Increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue)
- ML18088B190 + (Increased Water Hole Peaking in Operating Reactors)
- ML19322B150 + (Increases Funding for Consulting Contract Due to Addl Review of Underwater Weir Per AEC 661222 & s)
- ENS 49290 + (Increasing Background Noise in Stack Radiation Monitor Renders It Non-Functional)
- ML070360219 + (Increasing U.S. Representation from NRC on the IAEA Staff)
- ML20203M999 + (Incredible Tale of Texasgulf Cane Creek Number 7 Well & Anisotropic Extension Fracture Permeability,Paradox Basin, Ut)
- ML19320D395 + (Increment of Analysis,Estimated Airbourne Release of Pu from Exxon Nuclear Mixed Oxide Fuel Plant at Richland,Wa as Result of Postulated Damage from Severe Wind & Earthquake Hazard)
- ML19320B050 + (Increment of Analysis:Estimated Airborne Release of Pu from Exxon Nuclear Mixed Oxide Fuel Plant at Richland,Wa as Result of Postulated Damage from Severe Wind & Earthquake Hazard)
- ML24132A009 + (Incremental Extension of Burnup Limit for Westinghouse and Combustion Engineering Fuel Designs)