Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078P122 + (Human Factors Review of Safety Parameter Display Sys)
- ML20212N490 + (Human Factors Study Conducted in Conjunction with a MINI- Round Robin Assessment of Ultrasonic Technician Performance)
- ML20235N622 + (Human Factors Team Rept for 1987 Control Room Configuration)
- ML20350B622 + (Human Factors and Non-destructive Examination (PNNL-SA-158629))
- ML25150A114 + (Human Factors for Control Room Digital Modifications:Key Lessons Learned)
- ML20206N261 + (Human Factors in Annunciator/Alarm Systems:Annunciator Experiment Plan I)
- ML19209C836 + (Human Factors in Design. Prepared for Erda)
- ML20010D281 + (Human Factors in Encoded Exams: Planning for Task Analysis)
- ML18214A191 + (Human Factors in Nondestructive Examination Presentation at ASME BPV Code Week July 31 2018)
- ML21124A141 + (Human Factors of Encoded UT (PNNL-31245))
- ML20086R328 + (Human Interactions Evaluation Failure to Isolate Incorrect Valve Alignment During Shutdown)
- 05000266/FIN-2000006-03 + (Human Performance)
- ML20029D054 + (Human Performance Aspects of Operating Events W/Bypass or Defeat of Esf)
- 05000266/FIN-2001012-05 + (Human Performance CROSS-CUTTING Issue Due to Weaknesses in Fire Protection Engineering Area)
- ML060390458 + (Human Performance Crosscutting Issue Closure)
- 05000255/FIN-2001015-08 + (Human Performance Deficiency. Inadequate Engineering Products for Modifications, Operability and Corrective Evaluations)
- ML20087J778 + (Human Performance Enhancement Sys Rept Inadvertent Penetration of Saxton Containment Vessel Liner During Site Characterization Activities)
- 05000424/FIN-2013002-03 + (Human Performance Error Renders 1A CS Pump Inoperable)
- 05000424/FIN-2009004-02 + (Human Performance Error Renders 2B EDG Inoperable)
- 05000424/FIN-2009004-03 + (Human Performance Error Renders NSCW Pump #5 Inoperable)
- 05000155/LER-2023-001, Human Performance Error Resulted in Compensatory Measures Not Properly Employed + (Human Performance Error Resulted in Compensatory Measures Not Properly Employed)
- 05000334/FIN-2010002-01 + (Human Performance Error Results in Disabling a Control Room Annunciator)
- 05000424/FIN-2011005-01 + (Human Performance Error Results in Inoperability of TDAFW Pump)
- 05000424/LER-2025-001, Human Performance Error Results in Loss of Main Feedwater Pump and Manual Reactor Trip + (Human Performance Error Results in Loss of Main Feedwater Pump and Manual Reactor Trip)
- 05000387/FIN-2017001-01 + (Human Performance Error Results in Loss of Safety Secondary Containment Function)
- 05000458/LER-2025-001, Human Performance Error Results in Manual Reactor Trip + (Human Performance Error Results in Manual Reactor Trip)
- 05000424/FIN-2009005-03 + (Human Performance Error Results in Manual Reactor Trip Section)
- ENS 45046 + (Human Performance Error While Troubleshooting a Power Supply)
- 05000298/LER-2024-006, Human Performance Errors Cause a Condition Prohibited by Technical Specifications and Common Cause Inoperability of Independent Reactor Protection System Channels + (Human Performance Errors Cause a Condition Prohibited by Technical Specifications and Common Cause Inoperability of Independent Reactor Protection System Channels)
- 05000461/LER-2003-001, Human Performance Errors Result in Inoperable Containment Isolation Valve & Failure to Isolate Penetration within 4 Hours + (Human Performance Errors Result in Inoperable Containment Isolation Valve & Failure to Isolate Penetration within 4 Hours)
- 05000387/FIN-2015001-05 + (Human Performance Errors Result in Losses of Safety Function)
- 05000277/FIN-2016002-03 + (Human Performance Event Results in Emergent Downpower)
- L-12-310, Human Performance H.1(b) and H.2(c) Substantive Cross-Cutting Issues + (Human Performance H.1(b) and H.2(c) Substantive Cross-Cutting Issues)
- L-12-187, Human Performance H.1(b) and H.2(c) Substantive Cross-Cutting Issues + (Human Performance H.1(b) and H.2(c) Substantive Cross-Cutting Issues)
- ML100150704 + (Human Performance Slides)
- ML24158A229 + (Human Performance Test Facility (Hptf) Volume 4 - Supplemental Exploratory Analyses of Task Order Effects)
- ML22356A171 + (Human Performance Test Facility - Volumes 1-3)
- ML16222A852 + (Human Performance in Operating Events)
- ML20072B123 + (Human Performance in Operating Events:Lessons Learned for AP600 M-MIS Design)
- ML20216E575 + (Human Performance in Radiological Survey Scanning)
- ML24250A014 + (Human Performance in Remote Operations and Advanced Reactors Hfes Conference 2024)
- ML19276H399 + (Human Reliability Analysis Applied to Nuclear Power)
- ML24302A089 + (Human Reliability Analysis Data Workshop Agenda)
- ML19092A461 + (Human Reliability Analysis Data Workshop in the NRC, March 14 -15, 2019)
- ML20072R493 + (Human Reliability Data Bank for Nuclear Power Plant Operations.Volume 1:A Review of Exisiting Human Reliability Data Banks)
- ML20023C133 + (Human Reliability Data Bank for Nuclear Power Plant Operations.Volume 2:A Data Bank Concept and System Description)
- ML20116P127 + (Human Reliability Data Bank.Evaluation Results)
- ML20210K057 + (Human Reliability Impact on Inservice Inspection.Volume 2: Review and Analysis of Human Performance in Nondestructive Testing (Emphasizing Ultrasonics))
- ML20210K062 + (Human Reliability Impact on Inservice Inspection.Volume 1: Phase 1 Summary Report)
- ML033440453 + (Human Reliability Screening Analysis ANO Fire Issue)
- ML19209C866 + (Human Reliability Study)