Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235M623 + (HEAVY-SECTION Steel Technology Program.Semiannual Progress Report for October 1986 - March 1987)
- ML20116F401 + (HEAVY-SECTION Steel Technology Program.Semiannual Progress Report for October 1994 - March 1995)
- 05000263/FIN-2010007-01 + (HELB Analysis Potentially Non-Conservative)
- ML19161A107 + (HELB Background 06-11-2019)
- 05000333/FIN-2009004-01 + (HELB Barrier Doors Left Open and Unattended)
- ML061800393 + (HELB Pre Decisional Powerpoint Presentation)
- ML22277A504 + (HELB-TLR-Final Oct 2022)
- ML18052A567 + (HEM-15-MEMO-042 Radium Ingrowth Background - Distribute)
- ML18052A568 + (HEM-15-MEMO-044 Wrs Test Background Data Set - Distribute)
- ML19249D503 + (HEPA Filter Tests Study, Progress Rept for June 1979)
- ML19249D507 + (HEPA Filter Tests Study, Progress for Apr-June 1979)
- ML19242A586 + (HEPA Filter Tests, Interim rept,Jan-Mar 1979)
- ML23055A674 + (HER-PSAR-001, Revision 2, Hermes Non?Power Reactor Preliminary Safety Analysis Report)
- ML20076F909 + (HEU to LEU Conversion Rept)
- ML20314A058 + (HFC Comments on Amendment 4 Draft Safety Evaluation)
- ML21076A418 + (HFC Topical Report -A Verification Determination)
- ML18135A050 + (HFE Audit Report (Jul 25-2017 - Feb 14-2018))
- ML19108A400 + (HFE ITAAC and Di Implementation Review Audit Plan)
- ML19343B078 + (HFE Preliminary Assessment of Comanche Peak Unit 1 Control Room. Oversize Control Room Layout Drawing Encl)
- ML19220B675 + (HFE Vv Rsr Audit Summary Report)
- ML20259A627 + (HH-194S Cask Assembly. Sheet 1 of 1)
- ML19262H880 + (HHS Pr FRN (84 Fr 48750) 09-16-19)
- ML20260E189 + (HHSI & Lhsi Pump Discharge Valves Logic Diagram System:Si. Actual Drawing NUMBER:5N-12-9-Z-42006 1)
- ML20265D123 + (HHSI & Lhsi Pump Discharge Valves Logic Diagram System:Si)
- ML20261L502 + (HHSI & Lhsi Pump Discharge Valves Logic Diagram System:Si)
- ML102180080 + (HHSI Pump Seals)
- ML20259C996 + (HHSI Pumps & Lhsi Pumps Discharge Valves Logic Diagram System:N-12. Sheet 6)
- ML20260E119 + (HHSI and Lhsi Pumps Logic Diagram System:Si. Actual Drawing NUMBER:5N-12-9-Z-42000 1)
- ML20260B333 + (HHSI and Lhsi Pumps Logic Diagram System:Si)
- ML20086P023 + (HI-2073681, Revision 8, HI-STAR 180 Safety Analysis Report (Sar))
- ML19178A142 + (HI-2073681R7 HI-STAR 180 NON-PROP SAR)
- ML091210263 + (HI-2084175, Revision 3, Holtec Licensing Report for Beaver Valley, Unit 2 Rerack, Enclosure C)
- NL-16-109, HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center + (HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Indian Point Energy Center)
- NL-11-100, HI-2094289, Revision 4, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center, Enclosure 2 to NL-11-100 + (HI-2094289, Revision 4, Licensing Report on the Inter-Unit Transfer of Spent Nuclear Fuel at the Indian Point Energy Center, Enclosure 2 to NL-11-100)
- ML14324A040 + (HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification)
- ML18192B094 + (HI-2115090 HI-STORM Umax Final Safety Analysis Report Revision 5)
- ML19337A802 + (HI-2125175, Rev. 4A, Safety Analysis Report on the HI-STAR 180D Package (Non-Proprietary))
- ML18242A090 + (HI-2146214, Rev. 2A, Safety Analysis Report on the HI-STAR 190 Package)
- ML18072A170 + (HI-2146261, Rev. 2.C, Safety Analysis Report on the HI-STAR 80 Package)
- ML18256A155 + (HI-2146261, Revision 3, Safety Analysis Report on the HI-STAR 80 Package)
- ML21124A207 + (HI-2146312, Revision 3, Safety Analysis Report on the HI-STAR Atb 1T Non-Fuel Waste Transport System)
- ML18058A605 + (HI-2177535, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground Consolidated Interim Storage Facility - Emergency Response Plan)
- ML20153A786 + (HI-2177535, Revision 4, International & Eddy Lea Energy Alliance (Elea) Underground Consolidated Interim Storage Facility - Emergency Response Plan)
- ML18058A606 + (HI-2177558, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground Consolidated Interim Storage Facility - Decommissioning Plan)
- ML18093A423 + (HI-2177562, Revision 2, HI-STORE Cis Facility Training and Qualification Program)
- ML18058A607 + (HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan)
- ML18058A608 + (HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates)
- ML19151A482 + (HI-2188080, Revision 2, Safety Analysis Report on the HI-STAR 100MB Package)
- ML22271A741 + (HI-2188193, Revision 1, SMR-160 Control Rod Assembly Design Criteria Document)
- ML20049A083 + (HI-2188877, Revision 0, HI-STORM 100 License Renewal Application)
- ML21068A255 + (HI-2201064, Rev. 2, Elimination of the Large Break Loss of Coolant Accident (LOCA) and Establishment of LOCA Acceptance Criteria)