Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Guidance for Post Fire Safe Shutdown Circuit Analysis". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20245E561  + (Guidance for Addressing Software Common Cause Failure in High Safety-Significant Safety Related Digital I&C Systems)
  • Regulatory Guide 3.37  + (Guidance for Avoiding Intergranular Corrosion and Stress Corrosion in Austenitic Stainless Steel Components of Fuel Reprocessing Plants)
  • ML20349A335  + (Guidance for Changes During Construction for New Nuclear Power Plants Being Constructed Under a Combined License Referencing a Certified Design Under 10 CFR Part 52)
  • ML20314A232  + (Guidance for Conducting NRC Reciprocity Inspections Memorandum)
  • Regulatory Guide 1.87  + (Guidance for Construction of Class 1 Components in Elevated-Temperature Reactors (Supplement to ASME Section III Code Cases 1592, 1593, 1594, 1595, and 1596))
  • ML17146A200  + (Guidance for Determination of Appropriate Regulatory Action Based on Seismic Probabilistic Risk Assessment Submittals in Response to Near Term Task Force Recommendation 2.1: Seismic)
  • ML072770468  + (Guidance for Determining the Public Availability of NRC Records)
  • ML20149L546  + (Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45)
  • ML20081A796  + (Guidance for Disposal of Uranium Mill TAILINGS:LONG-TERM Stabilization of Earthen Cover Materials)
  • ML13031A056  + (Guidance for Electronic Submissions to the NRC, Revision 10)
  • RIS 2005-18, Guidance for Establishing and Maintaining a Safety Conscious Work Environment  + (Guidance for Establishing and Maintaining a Safety Conscious Work Environment)
  • Regulatory Guide 1.215  + (Guidance for ITAAC Closure Under 10 CFR Part 52)
  • ML22020A292  + (Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments, at Non-Power Production or Utilization Facilities)
  • ML17195A655  + (Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments)
  • ML21106A215  + (Guidance for Implementation of 10 CFR 50.59, Changes, Tests, and Experiments)
  • ML20211L879  + (Guidance for Implementation of 10 CFR 72.48, Changes, Tests, and Experiments)
  • ML20202A667  + (Guidance for Implementation of 10 CFR 72.48 Requirements Workshop Public Meeting Presentation Slides)
  • PMNS20250877, Guidance for Implementing the Requirements in 10 CFR Part 52 for Early Site Permit Renewal  + (Guidance for Implementing the Requirements in 10 CFR Part 52 for Early Site Permit Renewal)
  • ML040720196  + (Guidance for Licensee Review of Preliminary ASP Analysis)
  • ML030700177  + (Guidance for Licensee Review of Preliminary ASP Analysis (Enclosure 2))
  • ML072050531  + (Guidance for Licensees Evaluation of Criminal History (Fingerprint) Checks)
  • ML22231B043  + (Guidance for Monitoring of Fixed Neutron Absorbers in Spent Fuel Pools, Revision 1, August 2022)
  • ML20198K509  + (Guidance for NRR Audit of Licensee Programs for Managing Commitments Made to NRC, Rev 971110)
  • ML17338A449  + (Guidance for Northstar Medical Radioisotope, LLC Radiogenix Molybdenum-99T/Technetium-99m Generator System)
  • ML17320A146  + (Guidance for Optimizing the Use of Portable Equipment)
  • ML17009A343  + (Guidance for Performing Criticality Analyses of Fuel Storage at Light Water Reactor Power Plants, Revision 2 - Draft B)
  • ML20085F705  + (Guidance for Postponement of REP Exercises Due to the COVID-19 Outbreak)
  • ML19312C460  + (Guidance for Preparation of short-term & long-term Repts & Monitoring Program Re Evaluation of Potential Seismic Hazard at Jocassee Dam)
  • ML19210A635  + (Guidance for Preparing Pump & Valve Testing Program Descriptions & Associated Relief Requests. Recommended Std Format for Valve Inservice Testing Program Submittals Encl)
  • ML033650436  + (Guidance for Preservation of Historic, Cultural and Archaeological Resources (Ltr. to R. Stroup, Dated 1/15/03))
  • ML20116F275  + (Guidance for Professional Development of NRC Staff in Regulatory Risk Analysis)
  • ML20115A867  + (Guidance for Professional Development of NRC Staff in Digital Instrumentation and Controls)
  • ML20037B337  + (Guidance for Proposed License Amends Re Refueling, Draft. Refueling Info Request Encl)
  • ML18229A137  + (Guidance for Review of Twrs Privatization Contractor Initial Quality Assurance Program, October 1996, RL/REG-96-01, Revision 0, and Guidance for Review of Twrs Privatization Contractor Employee Concerns Management System, October 1996, Rl/R)
  • RIS 2002-03, Guidance for Submitting Measurement Uncertainty Recapture Power Uprate Applications  + (Guidance for Submitting Measurement Uncertainty Recapture Power Uprate Applications)
  • ML22284A101  + (Guidance for Transgender and Gender Expansive Individuals)
  • ML20082J891  + (Guidance for a Large Tabletop Exercise for a Nuclear Power Plant)
  • Regulatory Guide 1.233  + (Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light Water Reactors)
  • ML112101610  + (Guidance for the Assessment of Beyond-Design-Basis Aircraft Impacts (Draft Was Issued as DG-1176 Dated July 2009) (New Regulatory Guide))
  • ML18192A328  + (Guidance for the August 13-14, 2018, Monitoring Onsite Observation Visit to the Savannah River Site F and H Area Tank Farms)
  • ML23125A320  + (Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 Revision a 5-4-23 Tirice Response to NRC Comments)
  • ML18176A377  + (Guidance for the Final Rule Medical Use of Byproduct Material - Medical Event Definitions, Training and Experience, and Clarifying Amendments and Comment Resolution for Proposed Guidance on the Proposed Rule)
  • ML23017A109  + (Guidance for the Jan./Feb. 2023 Monitoring Onsite Observation Visit to the Savannah River Site Saltstone Disposal Facility)
  • ML18155A389  + (Guidance for the July 9-11, 2018, Monitoring Onsite Observation Visit to the Savannah River Site, Saltstone Disposal Facility)
  • ML19016A468  + (Guidance for the March 2019 Monitoring Onsite Observation Visit to the Savannah River Site F and H Tank Farms)
  • ML21256A291  + (Guidance for the Proposed Rule, Items Containing Byproduct Material Incidental to Production)
  • ML18296A068  + (Guidance for the Reviews of Proposed Disposal Procedures and Transfers of Radioactive Material, Under 10 CFR 20.2002 and 10 CFR 40.13(a))
  • RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services  + (Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services)
  • ML25247A172  + (Guidance on Accountability of General License Devices Requiring Registration)
  • ML031500232  + (Guidance on Addressing GSI-168 for License Renewal. Letter from Christopher Grimes (NRC) to Doug Walters (NEI) Dated 06/02/1998)