Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19263C397 + (Forwards Responses to .Provides List of All Class IE safety-related Equipment W/Identification of Basis for Qualification.Will Be Incorporated in Amend 60 to FSAR)
- ML16341C170 + (Forwards Responses to 10 Questions Re Functioning of Nuclear Regulatory Process at Facilities)
- ML20099E002 + (Forwards Responses to 10 Remaining Open Items Resulting from NRC Review of 881202 Alternate Seismic Criteria & Methodology Submittal & NUREG-0800,NRC Srp,Per 920423 Meeting)
- ML20132F195 + (Forwards Responses to 12 FSAR-related Questions Re Initial Test Program & Remote Shutdown Capability,Posed During 841219 Meeting W/Reviewers)
- ML20058B862 + (Forwards Responses to 12 Questions from 931001 Request for Addl Info Re BAW-10164,Rev 2, RELAP5/MOD2-B&W Advanced Computer Program for LWR LOCA & Non-LOCA Transient Analysis)
- A07458, Forwards Responses to 13 Items Re First 10-yr Inservice Insp Program Plan,Per NRC 880816 Request.Responses Incorporated Into Encl Rev 1 to Plan + (Forwards Responses to 13 Items Re First 10-yr Inservice Insp Program Plan,Per NRC 880816 Request.Responses Incorporated Into Encl Rev 1 to Plan)
- ML20101L688 + (Forwards Responses to 13 Items Re plant-specific Design Info Required for Westinghouse Plants,Incorporating Automatic Shunt Trip Mod,Per Generic Ltr 83-28.W/one Oversize Drawing. Aperture Card Available in PDR)
- W3P83-2197, Forwards Responses to 14 Questions Submitted in NRC Re Depressurization & DHR Capability.Results Indicate Existing Capability Adequate.W/O Encls + (Forwards Responses to 14 Questions Submitted in NRC Re Depressurization & DHR Capability.Results Indicate Existing Capability Adequate.W/O Encls)
- ML20134H750 + (Forwards Responses to 14 Unresolved Items Identified in Insp Rept 50-354/85-24.Revised,marked-up FSAR Text,Closing Unresolved Fire Protection Items,Also Encl.Revised Text Will Be Included in Amend 12 to FSAR Scheduled for 850918)
- ML20215H762 + (Forwards Responses to 14 of 25 Inel Questions on RELAP5YA Computer Code.Info on Remaining 11 Questions Will Be Forwarded in Near Future)
- ML19248C628 + (Forwards Responses to 14 of 50 Questions Submitted in NRC .Will Submit Remaining Responses by 790706. Certificate of Svc Encl)
- ML18093A278 + (Forwards Responses to 14 plant-specific Items Discussed in NRC SAR for WCAP-10858, ATWS Mitigation Sys Actuation Circuitry Generic Design Package, Per 861231 Commitment)
- AECM-87-0164, Forwards Responses to 15 Items Identified by NRC During 870519,0701 & 0728 Telcons Re Procedures Generation Packages (PGP) for Emergency Procedures (Ep).Mods to EPs Resulting from PGP Changes Will Be Performed in Upcoming EP Rev + (Forwards Responses to 15 Items Identified by NRC During 870519,0701 & 0728 Telcons Re Procedures Generation Packages (PGP) for Emergency Procedures (Ep).Mods to EPs Resulting from PGP Changes Will Be Performed in Upcoming EP Rev)
- LD-92-120, Forwards Responses to 154 of Issues Identified in Dser for Sys 80+ + (Forwards Responses to 154 of Issues Identified in Dser for Sys 80+)
- ML20246J091 + (Forwards Responses to 18 Issues Identified in Safety Sys Outage Mod Insp Rept 50-339/89-200,except Issues IC-4 & MS-4 Which Are Closed & MS-1 Which Contains Safeguards Matl. Supporting Engineering Repts Also Encl)
- ML20245G202 + (Forwards Responses to 1989 Natl Program Review Questionnaire in Response to 890206 Memo.Related Documentation Encl)
- ML20053A709 + (Forwards Responses to 20 Comments on Des in Response to 820422 Request.Responses to Two Addl Ltrs Transmitted by NRC Forthcoming)
- ML20039E898 + (Forwards Responses to 21 of 31 Questions Contained in 811026 Request for Addl Info Re Environ Review.W/O Encl)
- LD-93-011, Forwards Responses to 22 Issues Re Closure of Sys 80+ Draft SER Issues + (Forwards Responses to 22 Issues Re Closure of Sys 80+ Draft SER Issues)
- LD-93-009, Forwards Responses to 23 Issues Identified in Draft SER for Sys 80+.Responses Sorted by Review Branch + (Forwards Responses to 23 Issues Identified in Draft SER for Sys 80+.Responses Sorted by Review Branch)
- ML20092P564 + (Forwards Responses to 24 of 28 Auxiliary Sys Branch Draft SER Open Items.Responses to Four Remaining Items Will Be Submitted Shortly)
- ML20237K232 + (Forwards Responses to 25 More Questions from NRC Request for Addl Info.All Responses Will Not Be Submitted Until 870901 Due to Difficulties in Obtaining Required Info from Gpu & Util Subcontractors)
- ML20012C933 + (Forwards Responses to 3 of 4 Questions Re Review of Topical Rept BAW-10166P)
- DCL-84-186, Forwards Responses to 31 Allegations Identified in Sser 22, Per 840419 Request.Receipt Ack Requested + (Forwards Responses to 31 Allegations Identified in Sser 22, Per 840419 Request.Receipt Ack Requested)
- LD-92-115, Forwards Responses to 359 Issues Identified in Dser for Sys 80+.Many Responses Refer to CESSAR-DC,Amend K.Amend Will Be Formerly Printed by Early December + (Forwards Responses to 359 Issues Identified in Dser for Sys 80+.Many Responses Refer to CESSAR-DC,Amend K.Amend Will Be Formerly Printed by Early December)
- ML20040E027 + (Forwards Responses to 39 Questions in NRC Requesting Info Re Socioeconomic Assessment Provided in Environ Rept Amend X.Also Forwards Rept of Development of Criteria for Designation of Health Manpower Shortage Areas)
- ML20127M408 + (Forwards Responses to 54 Issues Identified in Draft SER for Sys 80+)
- LD-93-005, Forwards Responses to 54 Issues Identified in Draft SER for Sys 80+ + (Forwards Responses to 54 Issues Identified in Draft SER for Sys 80+)
- ML19309E069 + (Forwards Responses to 60-day Action Items of NRC 800211 Confirmatory Order (Interim Actions).Steady State Generator Operating Level Was Chosen on Basis of Analyses & Set point- Type Studies.Level Optimized W/Class I Transients)
- ML20071Q160 + (Forwards Responses to 731106 Questions,Indicating Specified Locations on Floor Plan)
- ML19344A923 + (Forwards Responses to 780517 Ltr Re Control of Heavy Loads Near Spent Fuel)
- ML20147F867 + (Forwards Responses to 780614 Questions Re NRC Testimony Before Subcommittee on Nuclear Regulation)
- ML19289B980 + (Forwards Responses to 780614 Questions Re NRC Testimony Before Subcommittee on NRC Regulation.Responses Represent Collegial View of NRC)
- ML20058A299 + (Forwards Responses to 780803 Staff Round 3 Questions Re Facil Cycle 5 Reload Submittal)
- ML20147B167 + (Forwards Responses to 780815 Questions A-1,A-16,A-17 & A-23 from C.Smith.Response to Question A-18 Will Follow Shortly. Questions Concern Accidents,Alternative Sites & low-level Radioactive Waste Disposal)
- ML20064E103 + (Forwards Responses to 780913 &19 NRC Ltrs Re Addl Info on Fire Protec Prog Equip)
- ML20064E086 + (Forwards Responses to 780920 NRC Ltr Re Radiological Emergency Plan & Quality Assurance Prog.Responses Will Be Documented in Amend 58 of the FSAR)
- ML20064J166 + (Forwards Responses to 780922 NRC Ltr Encl 3 Re Staff Positions on Fire Protec Prog.Responses to Encl 2 & 3 of 780922 NRC Ltr Were Submitted to NRC on 781023 & 781027)
- ML17272A270 + (Forwards Responses to 781103 First Round Containment Sys Branch Questions.Responses Will Be Formally Submitted as Amend to FSAR)
- ML19261B654 + (Forwards Responses to 781229 Request for Addl Financial Info)
- ML19261D977 + (Forwards Responses to 790402 Request for Addl Info Re Deviation Noted in QA Program Insp Rept 99900066/78-03)
- ML19270G452 + (Forwards Responses to 790404 Questions & Revised Portions of Text Referenced in Responses.Responses & Revision of Site Suitability Er to Be Distributed by First Week of June,1979. W/O Encl)
- ML19253A466 + (Forwards Responses to 790411 Request Re Storage of Liquid Waste in Tank Cars)
- ML19256B616 + (Forwards Responses to 790418 Questions Re Chemical Decontamination of Primary Cooling Sys)
- ML19247B807 + (Forwards Responses to 790522 Request for Addl Info Re Amend of License SNM-1107 for Expansion Facility)
- ML19309A690 + (Forwards Responses to 800215 Notice of Violation,Notice of Proposed Imposition of Civil Penalties & Request for Identification & Implementation of Improvements in Physical Protection Mgt.Encls Withheld (Ref 10CFR2.790))
- ML19305A795 + (Forwards Responses to 800223 Questions Re Primary Coolant Sys Pressure Isolation Valves.Steps Are Being Taken to Assure That Leakage Which Could Result in Intersystem LOCA Is Detected)
- ML17272A943 + (Forwards Responses to 800307 Hydrologic Engineering Questions Re Waste Treatment Sys,To Assist NRC Environ Review of Unit 2.Affidavit Encl)
- ML17261A176 + (Forwards Responses to 800325 Lessons Learned Audit Questions)
- ML19344F538 + (Forwards Responses to 800527 Questions Re Info Provided by NRC on 800501 Concerning Differences in Role of NRC & Executive Branch in Processing Export Requests.Supporting Documentation Encl)
- ML20049A338 + (Forwards Responses to 800903 Memo Re Draft Suppl 4 to SER Answering Util Discussing Compliance W/Nrc Regulation)
- ML20040C232 + (Forwards Responses to 801222 Transmittal of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Info Contains Results of Evaluations & Analyses of Load Handling Practices to Demonstrate That Risk Is Extremely Small)