Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Discussion Items for 990323 Telcon". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19308A240  + (Forwards Discovery Progress Rept for Dec 1978. NRC Contemplates Serving Interrogatories & Requests for Documents During Jan 1979)
  • ML20062F132  + (Forwards Discovery Rept for Oct.Util Neither Initiated Nor Received Any Discovery Requests)
  • ML20084N265  + (Forwards Discovery Request on Applicant 840411 Response to Partial Initial Decision Re A500 Steel Per 840510 Discussion.Counterproposal,Re Possible Settlement of Design Matters,Prioritized.Related Correspondence)
  • ML20127P800  + (Forwards Discovery Requests Under ASLB 841218 Memorandum (Reopening Discovery,Misleading Statement))
  • ML20217B224  + (Forwards Discrepancy Rept Identified During Review Activities for Independent Corrective Action Verification Program.Dr Distributed in Accordance W/Communications Protocol,PI-MP3-01)
  • ML19253C824  + (Forwards Discrepancy Rept Re Radwaste Shipment from Fl Shipper to Barnwell Site.W/O Encl)
  • ML20199D353  + (Forwards Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program.Listed Dr DR-MP3-0510 Has Been Determined Invalid)
  • ML20217Q219  + (Forwards Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verfication Program.Drs Distributed IAW Communication Protocol, PI-MP3-01)
  • ML20217E603  + (Forwards Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program,Iaw Communications Protocol,PI-MP3-01)
  • ML20247M043  + (Forwards Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program.Drs Being Distributed IAW Communications Protocol, PI-MP3-01)
  • ML20248E789  + (Forwards Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program)
  • ML20247K013  + (Forwards Discrepancy Repts (Drs) Identified During Review Activities for ICAVP)
  • ML20216C896  + (Forwards Discrepancy Repts (Drs)Identified During Review Activities for Independent Corrective Action Verification Program.Drs Distributed IAW Communications Protocol, PI-MP3-01)
  • ML20141G683  + (Forwards Discrepancy Repts DR-MP3-0007 & DR-MP3-0008, Identified During Programmatic Review Activities for ICAVP)
  • ML20217D481  + (Forwards Discrepancy Repts Identified During Review Activities for Independent Correctiive Action Verification Program.Drs Distributed in Accordance W/Communications Protocol,PI-MP3-01)
  • ML20148T557  + (Forwards Discrepancy Repts Identified During Programmatic Review Activities for ICAVP)
  • ML20207G770  + (Forwards Discription of Licensing Topical Rept (LTR) Governing Use of XCOBRA-T Code)
  • ML20216G272  + (Forwards Discrpancy Rept (Dr) Identified During Review Activities for Independent Corrective Action Verification Program,10 Drs Which Have Been Reviewed & Accepted by S&L & 10 Drs Which Have Been Reviewed But Not Accepted)
  • ML19282C968  + (Forwards Discussing Insp of License 13-10042-01 on 790309,16,21-23 & 29.Ltr Referenced in Reply to Applicants Motion for Emergency Action & Applicants Order to Show Cause)
  • ML19273B665  + (Forwards Discussing Reg Guide 1.120 Requirements for Cable Penetrations)
  • ML19290A131  + (Forwards Discussion & Event Tree for TMI Accident in Response to 790716 Request)
  • ML20197B370  + (Forwards Discussion & Justification for Present Configuration of Primary Auxiliary Bldg (Pab) Monitor. Isokinetic Nozzles Can Remain Downstream of Pab Ventilation Filters.Encl Attachment 1 Contains Necessary FSAR Changes)
  • ML19274E708  + (Forwards Discussion Based on Postulated Failure of Flow Splitter Plate & Postulated Evaluation of Reactor Coolant Pump Suction Elbow Splitter)
  • ML18051A955  + (Forwards Discussion Items Associated W/Sep Topic III-7.B, Design Codes,Design Criteria & Loading Combinations, Per NRC .Item Re Snow Loads & High Temp/Thermal Gradients in Concrete Structures Will Be Sent at Later Date)
  • ML20204F147  + (Forwards Discussion Items for 990319 Telcon Re IWE Containment Insp)
  • ML20204F331  + (Forwards Discussion Items for 990323 Telcon)
  • IA-85-124, Forwards Discussion Notes from 850103 Meeting W/D Basdeka Re Safety Issues A-47 & A-49 Concerning Pressurizer Thermal Shock & Control Sys,Respectively.Results of ACRS Review of Basdeka Concerns Requested  + (Forwards Discussion Notes from 850103 Meeting W/D Basdeka Re Safety Issues A-47 & A-49 Concerning Pressurizer Thermal Shock & Control Sys,Respectively.Results of ACRS Review of Basdeka Concerns Requested)
  • ML20126E333  + (Forwards Discussion Notes from 850103 Meeting W/D Basdeka Re Safety Issues A-47 & A-49 Concerning Pressurizer Thermal Shock & Control Sys,Respectively.Results of ACRS Review of Basdeka Concerns Requested)
  • ML19308C811  + (Forwards Discussion Outline for ACRS Subcommittee 790808 Meeting Re Underlying Causes Contributing to TMI Accident)
  • ML20138F154  + (Forwards Discussion Paper Current & Future Needs of Nuclear Regulatory Bodies,To Be Discussed at 960912-13 Senior Regulators Meeting in Paris & Draft Terms of Ref.Views on Paper & Reference Requested)
  • ML20137Z784  + (Forwards Discussion Paper Prepared for 960912-13 NEA Senior Regulators Meeting in Paris to Discuss Current & Future Needs of Nuclear Regulatory Bodies.W/O Discussion Paper. Partially Withheld Summary of 960815 Meeting in Canada)
  • ML20137Z819  + (Forwards Discussion Paper Prepared for 960912-13 NEA Senior Regulators Meeting in Paris to Discuss Current & Future Needs of Nuclear Regulatory Bodies.W/O Paper)
  • ML20138F166  + (Forwards Discussion Paper Prepared for Meeting Participants at NEA Senior Regulators Meeting on 960912-13 in Paris.Draft Terms of Ref Also Encl.W/O Encl)
  • ML20059G956  + (Forwards Discussion Paper on ABWR Schedule Re Primary Containment Pressure Control EPG-low Pressure Venting for Nrc/Ge Conference Call Scheduled for 931104)
  • ML20211E530  + (Forwards Discussion Points for Panel Discussion at Asqc 870209-11 Meetings in Las Vegas,Nv)
  • ML20062G059  + (Forwards Discussion Questions for 901129-30 Meeting on EPRI Passive Alwr Requirements Documents)
  • ML20154S736  + (Forwards Discussion Re Analysis of HR 6390 Udall Omnibus Nuclear Legislation.Review of Bill Shows Comments Needed from Waste Mgt & Fc.Staff Comments Are Due to OGC by COB March 7)
  • ML19242A290  + (Forwards Discussion Re Cost Estimates for Mill Decommissioning)
  • ML20133M247  + (Forwards Discussion Re History of Pipe Vibration Problems at Facility,Per 790314 Request)
  • ML20011A620  + (Forwards Discussion Re Required Concessions to Technical Requirements for Completion of NUREG-0737 Mods by Startup Following Sept 1982 Outage.Typical Equipment Procurement Schedules Also Encl)
  • ML20213E066  + (Forwards Discussion Re TMI Task Action Plan Item II.K.1.23, Reactor Level Instrumentation)
  • ML20024E713  + (Forwards Discussion Rept on Mark III Containment Interface Issues)
  • ML19289C217  + (Forwards Discussion Topics for Meeting to Be Held on 781212. Purpose of Meeting Is to Obtain Info for Use in Reactor Safety Study Methodology Appls Prog Res Proj)
  • ML20206H991  + (Forwards Discussion Topics for Pump & Valve Operability Review Team (Pvort) Audit.Formal Pvort Audit Package Unnecessary But Evidence of Appropriate Documentation & Administrative Controls Needed)
  • ML19309F658  + (Forwards Discussion in Response to Committee to Bridge the Gap 791003 Petition Alleging Deficiencies in Review Procedures Used in Support of Amend 10 to Ol.Further NRC Input to Cover All Alleged Deficiencies Necessary)
  • ML20151X241  + (Forwards Discussion of & Proposed Revs to Tech Specs for Resolution of NRC Comments Concerning Deletion of Auxiliary Feedwater Pump Turbine Inlet Steam Pressure Interlock Operability Requirements,Per 880406 Telcon)
  • ML19308C347  + (Forwards Discussion of 781107 Reactor Trip.Trip Caused by Elevated RCS Temp Required by Testing in Progress.Transient to Be Included in Operating Training & More Specific Guidance for Control Room Operators to Be Given)
  • ML20035E072  + (Forwards Discussion of Actions,Agreements,Requests & Commitments Made During ACRS 393rd Meeting on 930107-08 Re Response to Petition Submitted by R Grill for Rulemaking on Electrical Transients,PRM-50-56 & Resolution of GSI B-56)
  • ML20148C072  + (Forwards Discussion of Alternative Organizational Approaches for NRC Emergency Preparedness & Related Ofc Comments. Emergency Preparedness Licensing Functions Should Be Functions of NMSS & Ofc of Nuclear Reactor Regulation)
  • ML20234C582  + (Forwards Discussion of Analyses of Errors & Uncertainties in Calculation of Pressurizer Level & Pressure Response to Load Rejections,Per 870320 Telcon)
  • 1CAN069106, Forwards Discussion of Assumptions Used & Results of Main Steam Line Break Reanalysis for Facility  + (Forwards Discussion of Assumptions Used & Results of Main Steam Line Break Reanalysis for Facility)