Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212G338 + (Forwards 990729 Meeting Summary to Discuss Revised Reactor Oversight Program.List of Attendees & Info Exchanged at Meeting Also Encl)
- ML20141N896 + (Forwards AAF-TR-7102A, Impregnated Activated Carbon for Removal of Radioiodine Compounds from Reactor Containment Atmospheres & AAF-TR-7101A, Design & Testing of Fan Cooler Filter Sys for Nuclear Applications)
- ML20141N897 + (Forwards AAF-TR-7102A, Impregnated Activated Carbon for Removal of Radioiodine Compounds from Reactor Containment Atmospheres & AAF-TR-7101A, Design & Testing of Fan Cooler Filter Sys for Nuclear Applications.)
- ML20004C432 + (Forwards AB Andrews & Jh Greenhut Testimony Re Contention 8 on Emergency Planning Info.Related Correspondence)
- ML20004C433 + (Forwards AB Andrews & Jh Greenhut Testimony Re Contention 8 on Emergency Planning Info.Related Correspondence)
- ML20064D503 + (Forwards AB Delbello,Rs Jurkowski,As Curran,Dp Guido, AR Marasco & CW Bates Supplemental Testimony.W/O Testimony. Certificate of Svc Encl)
- ML20136C470 + (Forwards AB Feldman 790412 Ltr to President Carter & Wj Flynn 790406 Ltr to NRC Suggesting Changes to Enhance Nuclear Power Plant Safety)
- ML20136C466 + (Forwards AB Feldman to President Carter & Wj Flynn to NRC Suggesting Changes to Enhance Nuclear Power Plant Safety)
- ML19331E250 + (Forwards AB Johnson Testimony,Pages 63-64 & 80-82,due to Difficulty in Reading Original Submittal)
- ML20056H198 + (Forwards AB Reynolds Expressing Concerns Re Exemption of Univ Research & Training Reactors from Insp for Review & Suggestions)
- ML20244B628 + (Forwards ABB Atom QA Program for Nuclear Fuel & Core Components)
- ML20127L516 + (Forwards ABB C-E Determination That Content of C-E Meeting Slides, High Capacity Spent Fuel Storage Rack Poison Matl, No Longer Proprietary,Per 930112 Telcon Request)
- ML20073P834 + (Forwards ABB Cenp Critical Experiments in Reactor Critical Facility of Rpi)
- ML20199H792 + (Forwards ABB Industrial Sys,Inc Re Transfer of Nuclear Source K-1846-E,per 10CFR31.5)
- LD-93-042, Forwards ABB-C-E Sys 80+ Progress Rept on Structural Analysis of Nuclear Island & Nuclear Annex Structures, to Support 930317 & 18 Meeting in Charlotte,Nc Consisting of Std Structural Design Criteria Draft Spec + (Forwards ABB-C-E Sys 80+ Progress Rept on Structural Analysis of Nuclear Island & Nuclear Annex Structures, to Support 930317 & 18 Meeting in Charlotte,Nc Consisting of Std Structural Design Criteria Draft Spec)
- LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package + (Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package)
- ML20236Q600 + (Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc)
- ML20132E108 + (Forwards ABB-EM 960916 & 1126 Ltrs Which Responded to Notice of Nonconformance 99901297/96-01.Revised QAP-215, Non-Conforming, Also Encl)
- ML20132E112 + (Forwards ABB-EM 960916 & 1126 Ltrs Which Responded to Notice of Nonconformance 99901297/96-01.Revised QAP-215, Non-Conforming, Also Encl)
- ML20148Q291 + (Forwards ABC Listing of Projects on Integrated Schedule,Per Commitment Made at 871216 Meeting Based on License Amend Request 170)
- ML20059M093 + (Forwards ABWR Adaptation of New Section 5.0 of Std Tech Specs Re Administrative Controls)
- ML19346C357 + (Forwards ABWR Pra/Sa/Dba Punch List,Per 930812 Telcon)
- ML20127M414 + (Forwards ABWR SSAR Markups Addressing Open Items 6.2.1.6-1, 6.2.1.6-2,6.2.4.1-1,6.2.4.1-2,6.2.4.1-3 & 6.5.1-2 & Confirmatory Items 6.5.1-2,including Addl Change in Subsection 6.2.1.2-2)
- ML20106C944 + (Forwards ABWR SSAR Markups Corresponding to Majority of Piping Design Audit Open Items.Markups for Outstanding Open Items Will Be Provided on Listed Schedule)
- ML20056D812 + (Forwards ABWR STS 3.1.7, Standby Liquid Control Sys)
- ML20057F431 + (Forwards ABWR Schedule Re Fuel & Core Designs)
- ML20059G977 + (Forwards ABWR Schedule Re TS 3.6.1.6 Bases Addition, Indicated by Redlined Text)
- ML20057E239 + (Forwards ABWR Ssar/Tier 1 Cross Reference Matl, Consisting of Tables Which Identify Relationship Between SSAR Safety Analysis Assumptions & ITAAC Defined in ABWR Design Certification Matl Submitted in)
- ML20045E841 + (Forwards ABWR Tier 1/ITAAC Matl That Was Not Included in Submittals Dtd 930426,0521,0604 & 18.Matl Preliminary in That Matl Has Not Been Fully Verified Using GE Procedures Governing Compliance W/Qa Requirements)
- ML19326A964 + (Forwards AC Bolander Re Proposed Facility)
- ML20135D949 + (Forwards ACMUI Comments on DSI-12 Re risk-informed, performance-based Regulation)
- ML20149L955 + (Forwards ACMUI Comments on DSI-7 Re Strategic Assessment & Dsi Papers from Meeting Held on 961114-15)
- ML20248B439 + (Forwards ACMUI Response to Srm, Re Meeting W/Acmui)
- ML19325E779 + (Forwards ACNW Comments on Staff Technical Position, Design of Erosion Protection Covers for Stabilization of U Mill Tailings Site)
- ML20247A984 + (Forwards ACNW Ltr Rept for Apr 1998)
- ML19308B207 + (Forwards ACRS & Topical Index to Application,As Amended.W/O Encl)
- ML19264B580 + (Forwards ACRS 570916 Rept Re Util Application for OL Per 571013 Request)
- ML20148K099 + (Forwards ACRS 581021 Ltr to Commission Re Amends 7,8 & 10 to OL Application.Util Should Submit Amend Re Specific Experiments to Be Performed & Procedures to Be Followed for Pu Buildup.Acrs 581021 Meeting Minutes Encl)
- ML20148F095 + (Forwards ACRS 600627 Ltr Re Amends 22 & 23 to OL Application)
- ML20037B146 + (Forwards ACRS 610408 Rept Re Facility Operating Procedure Mods & Proposed New Control Rod Blades.W/O Encl)
- ML20037A897 + (Forwards ACRS 620705 Rept Re Facility.W/O Encl)
- ML20234B098 + (Forwards ACRS 630418 Rept Re Proposed Reactor at Bodega Bay, Ca,Per 610801 Understanding.W/O Encl)
- ML19345A319 + (Forwards ACRS 630718 Rept Per 610801 Agreement Between AEC & Hew.W/O Encl)
- ML19264B584 + (Forwards ACRS 630718 Rept Re Facility.W/O Encl)
- ML19291C894 + (Forwards ACRS 630718 Rept Re Util Proposed Change 36)
- ML19345A317 + (Forwards ACRS 630718 Rept Re Util.W/O Encl)
- ML19264B582 + (Forwards ACRS 630912 Rept Per 610801 Agreement Between AEC & Hew.W/O Encl)
- ML19264B585 + (Forwards ACRS 630912 Rept Re Facility.W/O Encl)
- ML19264B583 + (Forwards ACRS 630912 Rept Re Facility.W/O Encl)
- ML20235C793 + (Forwards ACRS 641020 Rept on Bodega Bay.Related News Clippings Encl.W/O Rept)
- ML20235C777 + (Forwards ACRS 641020 Rept on Bodega Bay.W/O Encl)