ML20057E239

From kanterella
Jump to navigation Jump to search
Forwards ABWR Ssar/Tier 1 Cross Reference Matl, Consisting of Tables Which Identify Relationship Between SSAR Safety Analysis Assumptions & ITAAC Defined in ABWR Design Certification Matl Submitted in
ML20057E239
Person / Time
Site: 05200001
Issue date: 09/30/1993
From: Quirk J
GENERAL ELECTRIC CO.
To: Joshua Wilson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20057E241 List:
References
MFN-157-93, NUDOCS 9310080166
Download: ML20057E239 (2)


Text

GE Nuclear Energy MFN 157-93 Docket No. STN 52 001 September 30, 1993 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 I

Attention:

Mr. Jerry N. Wilson, Acting Director Standardization Project Directorate l

Subject:

Submittal of SSAR/ Tier 1 Cross Reference Material l

for the GE ABWR

Reference:

1) GE letter to Document Control Desk, Attention Jerry N.

l Wilson, dated August 31, 1993, MFN No. 138-93, Docket No.

STN 52-001 s

l

2) Letter Dennis M. Crutchfield to Patrick W. Marriott,
    • [

l subject, " Guidance on the Form and Content of a Design Control Document," undated, Docket No.52-001.

l Gentlemen:

i l

Enclosed are thirty-four (34) copies of Standard Safety Analysis Report (SSAR)/ Tier 1 cross reference material for the ABWR. This material l

consists of tables which identify the relationship between SSAR safety analysis assumptions and the Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) defined in the ABWR Design Certification Material l

submitted August 31, 1993 (Reference 1).

I This submittal represents completion of the final element in the GE/NRC agreements on disposition of Roadmap-related issues as summarized in Reference 2.

These GE and NRC agreements include the understanding that the attached material will not be included in either the SSAR or the Design Control Document (DCD). However, the attached information is consistent with SSAR Tables 14.3-1 through -3 and Tables 19.14-1 through -10.

l

, f j

080011 0

J05 i

(

9310000166 930730

  • 1 i

PDR ADOCK 05200001 [h I g4 i

A PDR ta l

I

1 Document Control Desk September 30, 1993 U. S. Nuclear Regulatory Commission MFN No. 157-93 Washington, D. C. 20555 Docket No. STN 52-001 Attn:

Mr. Jerry N. Wilson As always, GE personnel will be available to provide clarification of this material and to answer any questions the staff may have.

Sincerely,

(

F.

irk, Project Manager JJWR Certification Program Mail Code 782, Phone (408) 925-6219 enclosure cc:

N. D. Fletcher (DOE)

T.'A. Boyce (NRC)

J. A. Beard (GE-Rockville)

J. N. Fox (GE)

A. J. James (GE)

R. Louison (GE)

N. D. Hackford (GE)

F. M. Paridiso (CE) 2 MFN LTR:c-4