.L, GPU Nuclear Corporation 6 0 Nuclear
- e mg==
o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Olal Number:
April 4, 1988 C311 2037 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Threr Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 License Amendment Request No.170 -
Integrated Schedule "ABC" List Pursuant to our commitent made in the December 16, 1987 meeting in Bethesda, Maryland, the ABC listing of. projects (ABC refers to the categories of items in the Integrated Schedule Plan) on the Integrated Schedule is hereby submitted for your informatio.
4 Sincerely, i
I l
l
'H. D. H kill Vice President and Director, TAI-1 HDH/GG/spb:1137A l
l cc:
J. Stolz W. Russell R. Hernan R. Conte 1
l Attachment l
8804120393 080404 Cl PDR ADOCK 05000289 0
P PDR
\\
\\
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
s~
^
TMI-I PROJECT LISTIOc
'o CATEGORY *A" PROJECTS i
SORT BY CATEGORY / CYCLE /BA %rMBER STATUS AS OF 30 MAR 88 j
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEAR PR.OJECT DESCRIPTION 1
I I
I 128061P2 REG GUIDE 1.97 MODS-SEISMIC 7R NRR I
CR
'40DIFY PANELS TO MEET SEISMIC REOUIREMENTS AS NECESSARY.
LAI 86-9196.
i j
2 412244P5 REMOTE SHUTDOWN SYS ENHANCEFENT 7R NRR i
CR j
REWIRE RSD PANELS TO ISOLATE LSAS CONTACT FROM ICV 364.
l l
3 412384P4 APPENDIX R OPEN ITEMS
'7R NRR CB RCP TRIP CIRCUITS MOD (REROUTE 2 CRTS):
LAI 87-9176.
i 4
412484 FIDW MEASURING INSTRUMENTATION-sST PRGRM 7R-NRR CB ISPH INSTALL TAPS AND ANNUBARS WITH LOCAL e
INDIC. TO PROVIDE FLOW FOR CHILL PUMP
]
6 SW PUMP. LAI 83-0121.
4 5
412491P3 REG GUIDE 1.97 MODS 7R NRR RB CB AB FH 4
j RB WORK OF 1DTAb JOB.LAITERMINATIONS$93&
ABOUT 304 86-9 LAI 87-9155.
6 412531P1 PUMP RECIRC FLONMETERS FOR IST 7'R NRR DGB INSTALL FIDWMETER ON DISCHARGE LINES OF PUMPS DF-PIA /B AND DF-PIC/D.
1 LAI 87-9079.
j 7
412531P2 PUMP RECIRC FLOWMETERS FOR IST 8R NRR AB INSTALL FLOWMETER Ob RECIRC LINE FOR 4
~
WDL-P 3A/Br INSTALL RECIRC LOOP FOR CAPIA B. LAI 87-9045.
TMI-1
- R O J E C T LISTING O
CATEGORY "A" PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION 8
412462 ANTICIPATE TRANSIENT W/O SCRAM (ATWS) RULE 9R NRR CR RELR CB TB ADD ELECTRONICS LOGIC TO TRIP REG GRP.
LAI 85-9227 b
e 4
i
T_M I - 1 P Et O J E C T LISTICG CATEGORY "B" PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STARIS AS OP 30 MAR 88 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION 9
123227 IN SERVICE RX BLDG TENDON SURV4ILLANCE 7
NRR 10 123224 OTSC TUBE PLUGGING 7R NRR RB PLUG OTSG TUBES AS NECESSARY.
71 123226 7R REACTOR REFUELING 7R NRR RD REPLACE 76 FUEL ASSEMBLIES.
12 123235 RC PUMP SNUBBER VALVE BLOCE REPLACE 7R NRR RB REPLACE THE CONTROL VALVE BI/XKS ON THE 4 RCP SNUBDERS; TEST SNUBBERS (NRR).
I?
125007 TMI INSERVICE INSPECTION (OUTAGE 7R) 7R NRR ALL ASME SECT XI INSPECTIONS.
14 125008 EDDY CURRENT INSPECTION 7R NRR RB ECT OF ISI TURES g 3% INSPECTION.
15 123A08 8R REACTOR REFUELING BR NRR j
RB 76 NEW FUEL ASSEMBLIES.
i 7
1
TMI-I PROJECT LISTING CATEGOQY *P" PROJECTS SORT BY CATEGORY / CYCLE /DA NUMBER STATUS AS OF 30 MAR 88 ORS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION 16 123C08 OTSG TUBE PLUGGING 8R NRR RB PLUG OTSG TUBES AS NECESSARY.
17 123230 ILRT 8R NRR R8 INTEGRATED LEAK RATE TEST OF CONTAINMENT - 1990.
18 126A08 OTSC EDDY CURREITT TESTING 8R NRR Rtt ECT OF ISI TLBES; 34 INSPECTION.
19 126C08 TMI INSERVICE INSPECTI'JN (OUTAGE 8R) 8R NRR ALL ASME SECT XI INSPECTIONS AUGMENTED ISI.
20 412538 HEAT SINK PROTECTICN SYSTEM UPGRADE 8R NRR CR CB INSTALL DIFFERENT CR INDICATOR FOR MSRD_ OTHER MOD IDENTIFIED BY OPS, I
MAINT AND PLANT ENG.LAI 87-9283.
21 128097 SEISMIC OUAL NUCLEAR POWER PLANTS
~
87-90 NRR RESOb6YEOO*EE 6Si~A 46 THROUGH SEISMIC OUALIFICATION UTILITY GROUP PARTICIPATION.
22 412523 REPLICATE SIMULATOR CERTIFICATION UPGRD 87-90 1 RR UPGPkbb'Si$ $AiUR C6 SiSTENT WITH CONTROL ROOM MODIFICATIONS.
23 128108 SEISMIC QUAL OF EQUIP IN OPER NUC PLANTS 87-91 NRR
T_M I-1 PROJECT L I S T_I_N G CATEGORY "3" PROJECTS STATUS AS OF 30 MAR 88 SORT BY CATEGORY / CYCLE /BA NUMBER OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION SCOPE'YbE'5$iSkid" Eb"OF EOUIP POR TMI-I AS WILL BE R UIRED BV NRC GL 87-02 & LAI 7-9084.
24 128056 VENDOR MANUAL REVIEW 87/88 NRR ESTAEbi$H'E0b ikhEEkE i VENDOR DOCUMENT CONTROL PROGRAM; '
LAI 85-9258.
25 126881 OUTAGE GENERAL EMPLOYEE TRAINING - TMI-1 88 NRR INSTkhdi biVibhEL$~0bRKING IN NUCLEAR POWER PLANTS.
26 4I8057 CONSOLIDATION PLAN 88/89 NRR TASK $ ib 5E"ECdbkfLi5 ED TO CONSOLIDATE TMI-I AND 2 SECURITY:
LAI 88-9019.
27 12689A OUTAGE GENERAL EMPLOYEE TRAINING - TMI-1 89 NRR INSTkbCi I0biVEbbEL$ $ RXING IN NUCLEAR POWER PLANTS.
28 12689E RX VESSEL INSERVICE INSP SUPP & PREP-8P 89 NRR PLAN ~ b EkEhAh5'50R kX VESSEL
~
INSPEL7 ION IN BR.
29 123A09 9h REACTOR REFUELING 9R NRR RB 80 NEW FUEL ASSEMBLIES.
30 123C09 OTSG TUBE PLUGGING 9R NRR RB PLUG OTSG TUBES AS NECESSARY.
l TMI-1 PROJECT L I_S T I N G I
CATEGORY *L" PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 ODS PA DESCRIPTION CYC'E/
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION 31 126A09 OTSG EDDY CURRENT TESTING 9R NRR RB ECT OF ISI TUBES; 3% INSPECTION.
32 126C09 TMI INSERVICE IN*PECTION (OUTAGE 9R) 9R NRR ALL ASME SECT XI INSPECTIONS AUGMENTED ISI.
TMI-1 PROJECT L I S T I 13 G CATEGO Y *C* PROJECTS
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION 33 123222 TURBINE / GENERATOR INSPECT & OVERHAUL 7R MRC TB OVERHAUL GENERATOR EXCITER, B LP TURBINE, AFP TURBINE, VALVES.
34 123223 RCP SEAL INSPECT / REPLACE 7R MRC PB INSPECT /PEPLACE SEALS ON RCP'S.
35 123231P1 OTSG AND RCS INSULATION REPLACEMENT 7R MRC RB INSULATION SCHEDULED TO BE REMOVED DURING 7R TO BE REPLACED WITH UPGRADED REFLECTIVE INSULATION.
36 12500:.
STEAM EROSION (AUGMENTED) 7R NRR ALL AUGMENTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TMI SYSTEMS.
37 128081P2 OTSG MECHANICAL CLEANING - SLUDGE SMPL 7R MRC RD "tEMOVE SLUDGE SAMPLE FROM OTSG 1V SUPPORT CHEM CLEANING PROGRAM.
38 128124P1 REDt. SIGN / REPLACE CONTAINMENT ISO VALVES 7R IOE R t*
AB REPLACE DHV-69 WALKDOWN AND MEASURE INTERNALS FOR OTHER VALVES (4).
39 412014 UPGRADE RIVER WATER PUMP SYSTEM-LM 7R MRC ISPH REMOVE 14 SEAL WATER PUMPS, REPLACE WITH 2.
TMI-1 PROJECT LI_STIDG CATEGORY *C" PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 OBS DA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEAR PROJECT DESCRIPTION 40 412081P3 OTSG BLOWDOWN 7R MRC RB TB INSTALL PIPING & VALVES & CONTROLS FOR HOT OTSG B/D.
41 412232 FUEL HANDLING SYS UPGRADE 7R MRC RB FHB REPLACE HYDRAULIC MAST CONTROL CONSOLE D1 LION SYSTEM, UPGRADE FROM B4 "IU B5.
42 41 ~t255 STRIP CHART RECORDER UPGRADE 7R MRC CR TB REPLACE 21 STRIP CHART RECORDERS (19 IN CR).
43' 412444 MAIN GENERATOR PROTECTION IMPROVEMENTS 7R REL CR TB RELR ADD CORE H2 SAMPLE; NEW RELAY PANEL; ADD 2 REVERSE POWER RELAYS.
44 412495 RX EX-VESSEL FLUENCE MEASUREMENT 7R NRR RB PLACT DOSIMETRY IN EXISTING SOURCE CAL TUBE.
45 412534P2 ICS/NNI - ENHANCE RELIABILITY 7R REL CB RELR RESPONSE TO SPIP REC: REROUTE "HAND
- POWER CIRCUIT.
.46 418678 NATURAL DRAFT COOLING TOWER PIPE RETURB.
7R MRC NDCT REPLACE WOODEN PIPING PIPE SUPPORTS AND SPLASH BOXES. REFbRBISH VALVES, HOT BASIN, ETC.
47 126B08 STEAM EROSION (AUGMENTED)
SR NRR 1
l J
TM I-1 PROJECT LIETING CATEGORY "C" PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 OBS NA DESCRIPTION CYCLE /
CLASSIFICATION NUMBI11 YEAR PROJECT DESCRIPTION ALL AUGMENTED INSPECTIONS TO DETECT EROSION / DEGRADATION OF TMI SYSTEMS.
4Q 123125 TMI-1 MAIN ANNUNCIATOR REFORMATING 8R NRR CR RELR RELOCATE AND RETURN 200 MAIN CR ANNUNCI A'!UR ALARMS AND WINDOWS.
(PART OF SPIP) 40
- 128128 OTSG CHEMICAL CLEANING SYSTEM 8R MRC RB IMPLEMENT CLEANING OF BOTH OTSG'S BASED ON KWU PROCESS.
50 412522 REPLACE BAILEY TRANSMITTERS 8R NRC REPLkEk'B i.5Y'5i'TR b5 WITII 4
51 128098 BWOG PERFORM IMPROVE UPGRADES 87-89' NRR RELR Cd UPGRADES RESULTING FROM SECO/ DAVIS BESSE EVENTS. SCOPE NOT DEFINED.
52 128114 EPRI STEAM GENERATCR RELIABILITY FROJ 87-89 MRC CO-FU 6INd'E'UR*$PEI SdkP TASK 404.
53 412536 B&WOG ADVANCED CONTROL SYSTEM TASK FORCE 87-89 ISM SUPPUhi'Of'i1Sk'f6Rd5'iO DEVEIDP AN OPTIMAL CONFIGURATION FOR THE ADVANCED CONTROL SYSTEM.
54 419648 CONSTRUCT ADMIN NORTH BUILDING 87-89 FAC CONShhUdT 5'206EIS0 i M STORY
TM I-1 PROJECT LISTIQC CATEGGRY "C" PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 OPS BA DESCRIPTION CYCLE /
CIASSIFICATIOt*
NUMBER YEAR PROJECT DESCRIPTION OFFICE BUILDIEC.
55 128072 PLANT LIFE ASSURANCE / EXTENSION 87-90 REL SUPPbRi"Ok"$YUbiE5 5 'kPRI & BWOG FOR FEASIBILITY OF EXTENDING OPERATING LIFE.
56 412AAQ PLANT CHECK VALVE UPGRADE 87-90 ISM STUDi*bh EEbdK"VkLV$*
APPLICATIONS - BASED ON SAN ONOFRE.
57 412271 PLANT PERFORMANCE MON INSTM 87-90 HRP TB RB EVALUATION TO DETERMINE WHAT INSTRUMENTATION IS NEEDED.
(POSSIBLE MOD) 58 412512P1 SAFETY /PERFORMNC IMPROVEMENT PROG (BMX;)
87-90 NRR TH MODS TO IMPLEMENT SPIP RECOMMENDATIONS.
59 128019 TMI-l DECOMMISSIONING COST EST. UPGRADE 88 ORR DEVEEUP Cb5k"E55 kAi$'EONSISTENT
~
WITH CifANGES TO 10CFR50.
60 418058 SECURITY ACCESS CONTROL COMPUTER ENHANCE 88 NRR ALL REPLACE CARD READERS; UPGRADE MAIN COMPUTER; NEW PRINTER.
61 419448 PURCilASE IN-PLACE (CANBERRA) WBC SYSTEMS 88 NRR WHOLb'b D 'dbU ii G $i5TEMS.
1
_ _ _ _ _ =. _ _..
. =..
.-m 1
TMI.1 PROJECT LISTIDC I
CATECORY "C" PROJECT 3
~
i
'i o
SORT DY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBEit YEAR j
PROJECT DESCRIPTION j
4 I
i 62 419453 EQUIPMENT FOR RCRA & WASTE MINIMIZATION 88 ERR
-)
i j
E(M.11PMENT FOR HANDLING OF HAZARDOUS MATERIALS AND WASTES.
)
I j
63 419477 EMERG COpptUNICATIONS SYSTEM UPGRADE 88 NRR 3I...
........ DEDICATED TELE?NONE CIRCUITS 1
REPLACE WITH MICROWAVE TRANSMISSION SYSTEM.
1 i
i 1
j 64 419883 REPLICA SIMULATOR REMOTE SMUTDONE PANELS 88 ISM-I REPL$ddiE I5b $N$iALI.*iMI-1 REMOTE SHITT.)OWN PANELS AT SIMULATOR MODIFY
]
SOrf MARE.
i 65 128122 B&W OWNER'S GROUP PROGRAM 88-90 NRR 1
1 GPON PARTICIPATION IN THE BWOG.
i j
l 66 128132 AS FOUND DOCUMENT & DRAWING UPDATE 83-90 NRR MAINTAIN AS-FOUND DOCUMENTATION i
i 4
(PER 10CFR50 APP B).
1 l
67 128099 TMI-1 INDIVIDUAL PLANT EVALUATION 88/89 NRR INDUSTRY DEGRADED CORE ACTIVITIES
& PLANT SPECIFIC NRC SUBMITTAL.
I
)
i i
I 68 412521 VOLUME REDUCTION EQUIPMENT FACILITY 88/89 RAD PROV UE SULi6 655iE 6 $POSAL FACILITY.
i
.l t
A 1
4 "4
f 1
e 4
d.
l i
i a
j
==
=
.s.
a.
me w
e
.e
== w a.
7 M I -_1 P 1lt O J E C 7 LISTINC CATEGORY "C* PROJECTS SORT BY CATEGORY / CYCLE /BA NUMBER STATUS AS OF 30 MAR 88 OBS BA DESCRIPTION CYCLE /'
CLASSIFICATION j
NUMBER YEAR 1
PROJECT DESCRIPTION 69 419454 AUTOMATIC PRECIPITAION SAMPLERS 88/89 ERR AUTOkific'5IAPEEk$ E k~ ENVIRONMENTAL WJNITORING PROGRAM.
70 419456 AUTOMATIC WATER COMPOSITORS 88/89 ERR CONTikhbU$[i'OPEkETi d* WATER SAMPLER FOR RIVER WATER SAMPLES.
71 129100 STATION BLACKOUT 89 NRR ANALiSj$ ib*kESPbAD'ib'NRC REQUIREMENTS ON STATION BLACKOUT.
72 128101 DECAY HEAT REMOVAL RELIABILITY 89 NRR ANALidi$ ib*kE5hb D"ib"NRC HEQUIREMENTS WHEN DEVELOPED.
73 128113 LOW ACTIVITY WASTE STREAM PETITION (EPRI 89 NRR SUPP6ki'Oh*kELb5" Edbi.ETORY CONCERN TECIINICAL SUPPORT PROGRAPI.
l 74 412AAG PELOW REGULATORY CONCERN POWDEX DISPOSAL 89 NRR OBTAiO~hEEAI$Sibk'Fdk' NSITE DISPOSAL OF SPENT POWDEX.
75 419XX2 CONSTRUCT TURBINE BUILDING TOOL SHOP 89 ORR CONSik6dT AiiNi~dbNik ETOR TOOL SHOP ON 305' LEVEL OF TB TO REPLACE i
PLYWOOD SHED.
76 419XX9 CONSTRUCT VISITOR CENTER 89 FAC e
T M I _- 1 PDOJECT LISTIDG CfTEGORY "C* PROJECTS i
e SORT SY CATEGORY /CYC.LE/BA NUMBER STATUS AS OF 30 MAR 88 1
OBS BA DESCRIPTION CYCLE /
CIASSIFICATION NUMBEst YEAR PROJECT DESCRIPTION EXPAND AIID ItENOVATE VISITOR OBSERVATIOss CENTER - TO PIKN'IDE OFFICES FOR TME COBOGUNICATION DIVISION GROUP.
77 41989G MELITA 3000 EMERG TELEI80TIFICATION SYS 89 MRR THIS iiiT5E*h!Ed,*5DE65kTICALLY PERFOdet SURVEILLA80CES.
78 41989N RDeOTE SIREN 8tOIIITORING SYS (RSMS) 89 ISM
{
PuRCilii iiki i&Cf.U6iic SIREN l
SENSORS AIBD CENTRAL (REBOOTE) STATION.
i 1
79 419639 REIGOVATE GREEN ADMIN BUILDING 222 89/90 FAC REINSIYk Ebb *EEE UG5*dIEEEE ADOEIN BLDG.
l 80 419665 C000STRUCT TRAINING LABS 89/90 FAC PROVIOE* FUk'TRdi$lted*(EDS IN EXISTING STR.UCTURES.
1 O!
412076 POISO98 FUEL RACKS - POOL A 9
NRR rNB t
EXPA80D CAPACITY.
(CYCLE 9) 82 126809 STEAM EROSION (AUGDIESITED) 9R NRR ALL AUC8eEsf7ED INSPECTIOteS TO DETECT EROSIOII/DEGRADATIO88 OF Y9tX SYSTEMS, 83 412ABE SOUG 9000S
^
9R NRR ALL 880DIFY A88CIIORAGEg/SUProstTS REPLACE P90TSCTIVE StERAYs TO CO8ePLE WITIE SEISSEIC QUALIFICATIONS.
i 1
r~
ABC Classifications a)
Meet NRC Requirements -(NRR) - Activities that a) must be carried out to Tulf111 specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished could result in an NRC non-compliance even though the specific activity is not required by the NRC.
b)
Meet Environmental Requirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished could result in a regulatory non-cogliance even though i
the specific activity is not required by an environmental regulatory agency.
c)
Meet Other Requirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished could result in a violation of that ordinance, code or guidance, court order, etc.
I d)
Increase Safety Margins (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.
e)
Decrease Environmental Effects (E) - Activities that, if iglemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.
f)
Igrove Radiological Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or i
radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.
g)
Maintain Reliability / Capability (MRC) - Activities that, if implemented, will l
maintain power production at existing levels by preventing deterioration of plant systems or equipment.
Includes activities in response to national codes & standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently, h)
Improve Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.
i l
i)
Improve Operational Effectiveness (IOE) - Activities that, if implemented, i
will improve starr errictency or provide a direct economic payback in terms j
of reduced operating / maintenance costs.
i
{
i
,-----.__,----.-_,n-,___.-
j)
Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.
k)
Provide Contingency / Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.
1)
Improves Heat Rate Perfonnance - (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.
6377f/0171 f
-m,