Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25251A149 + (Final Transmittal Letter for Dresden SE for SLRA Review)
- ML20275A374 + (Final Transmittal Letter to GEH)
- ML20275A375 + (Final Transmittal Memo to ACRS)
- ML21188A227 + (Final Traveler SE of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling)
- ML24249A145 + (Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements)
- ML24362A056 + (Final Traveler SE of TSTF 596, Rev 2, Expand the Applicability of the Surveillance Frequency Control Program (SFCP))
- ML17236A366 + (Final Traveler SE of TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements)
- ML18299A069 + (Final Traveler SE of TSTF-564, Revision 2, Safety Limit MCPR)
- ML23206A076 + (Final Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation)
- ML23241B040 + (Final Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown)
- ML24029A148 + (Final Traveler SE of TSTF-592)
- ML24358A228 + (Final Traveler SE of TSTF-597, Revision 0, Eliminate LCO 3.0.3 Mode 2 Requirement)
- ML25247A240 + (Final Traveler SE of TSTF-600, Rev 2 (ML25247A240))
- ML25247A259 + (Final Traveler SE of TSTF-601 (ML25247A259))
- ML20006D633 + (Final Trip Rept of 890708-0827 Visit to Ussr Re Inspector Exchange to Develop Understanding of Methods Used by Soviets to Ensure Adherence to Design & Operational Requirements & Specs for Civilian PWR Reactors.Related Info Encl)
- ML20210B898 + (Final Typed Pages for LARs 109 & 115,previously Submitted by 990615 & 28 Ltrs.Revised Pages Replace Those Previously Provided for LARs 109 & 115)
- ML20044A939 + (Final UMTRA-DOE/AL-050510.GRNO, Remedial Action Plan & Final Design for Stabilization of Inactive U Mill Tailings at Green River,Ut:Vol Iia - App D:Suppl,Site Characterization,App E:Groundwater Protection Strategy)
- ML20044A935 + (Final UMTRA-DOE/AL-050510.GRNO, Remedial Action Plan & Final Design for Stabilization of Inactive U Mill Tailings at Green River,Ut:Vol I - Text,Apps A,B & C)
- ML20044A944 + (Final UMTRA-DOE/AL-050510.GRNO, Remedial Action Plan & Final Design for Stabilization of Inactive U Mill Tailings at Green River,Ut:Vol III - App F:Final Design)
- ML20210L332 + (Final USNRC Contingency Plan for Y2K Issue in Nuclear Industry)
- ML22326A207 + (Final USNRC Dvaap Documents Submission)
- ML20090A936 + (Final Unit 2 Part 21 & Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations.Initially Reported on 830315.Drawings Revised to Reflect Use of Stainless Steel)
- NRC 2005-0074, Final Update Information Regarding the Point Beach Nuclear Plant License Renewal Application + (Final Update Information Regarding the Point Beach Nuclear Plant License Renewal Application)
- ML15302A340 + (Final Update Regarding Fluence Assessment for Reactor Vessel Inlet and Outlet Nozzles)
- DCL-04-122, Final Update of the Diablo Canyon Power Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan + (Final Update of the Diablo Canyon Power Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
- CNL-19-015, Final Update on Progress of Facility Modifications for MSIV Leak Rate + (Final Update on Progress of Facility Modifications for MSIV Leak Rate)
- ML20059L410 + (Final Update to Interim Part 21 Rept 92-016 Re Rv Upper Plenum Anomaly in Four Loop Plant Utilizing Inverted Top Hat Style of Upper Internals Package.Suspects Anomaly Associated W/Flow Switching Between Adjacent Hot Leg Nozzles)
- ML20058F426 + (Final Update to Interim Part 21 Rept 93-016 Re Concern That Charging Pumps May Experience Runout Condition & May Deliver Less Flow to Injection Lines During Si.Customer Notification Ltr & Final Closeout Ltr in Preparation)
- ML20059L172 + (Final Update to PGE-1043,Amend 3, Accident Monitoring Instrumentation Review, Identifying Rept as Historical by Placing Explanation in Preface to Be Inserted at Front of Document)
- ML14311A140 + (Final VC Summer Iepra Ror 10-10-2014.docx)
- ML19220A443 + (Final Value for Max Flood Protection May Increase.Proposed Design Features Will Be Submitted for Review)
- ML20040H234 + (Final Value/Impact Statement of Proposed Reg Guide 1.23, Onsite Programs. In-house Revision Recommended)
- ML20199C854 + (Final Verification & Validation Rept for Nebraska Public Power District Plant Mgt Info Sys)
- ML20236W514 + (Final Version Staffing Plan,Ohio Dept of Health,Bureau of Radiation Protection, in Support of Agreement State Application,State of Ohio & NRC Ltr)
- ML18106A386 + (Final Version of COLR for Salem Unit Cycle 13)
- ML13316B825 + (Final Version of Emergency Operating Procedures)
- ML19259A866 + (Final Version of Fifth Transmittal to Application of Defense in Depth Principle to Reactor Instrumentation Sys.This Version Contains Changes to Hardware & Software & Clarification of Derived Variable Calculator)
- ML20151Q062 + (Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS)
- ML20052H197 + (Final Version of Limited Appearance Statement at ASLB 820414 Hearings,Supporting Facility Licensing.Nrc Current Requirements for Emergency Planning & Public Perception of Nuclear Accident Consequences Are Excessive)
- ML19257D097 + (Final Version of NRC & FEMA Memo of Understanding for Prompt Improvement in Radiological Emergency Planning & Preparedness.Delineates Reponsibilities of Each Agency)
- ML20003A924 + (Final Version of Reactor Vessel Brittle Fracture Analyses During Small Break LOCA Events W/Extended Loss of Feedwater. Info Re power-operated Relief Valve Opening Probability Encl)
- ML19317H404 + (Final Version of Resin Solidification Test Program for Epicor II Resins)
- ML19221A236 + (Final Version of Testimony Before Senate Subcommittee on Nuclear Regulation Re Six Main Factors Causing Accident. Proposed Redraft of Testimony Encl)
- ML17301A094 + (Final Version of, Integrity & Stability of Internals- Conclusions & Findings)
- ML23202A216 + (Final Vogtle Unit 4 ITAAC Review Status Report)
- ML20148A391 + (Final Vol I of UMTRAP-DOE/AL050510.GRN0, Remedial Action Plan Final Design for Stabilization of Inactive U Mill Tailing at Green River,Ut:Text,Apps A,B & C)
- ML20148A348 + (Final Vol Iii,App E of UMTRA-DOE/AL 050510.GRN0, Remedial Action Plan Final Design for Stabilization of Inactive U Mill Tailings at Green River,Ut)
- ML100220022 + (Final Watts Bar Site Audit Trip Report for Jcn J-4261, Technical Assistance for Operating License Environmental Review - Watts Bar Unit 2 Reactivation)
- ML14316A369 + (Final Well AA-V Installation Report 031214)
- ML22215A129 + (Final Westinghouse Environmental Impact Statement Letters to Tribes Closing Section 106 - Revised)
- ML25171A125 + (Final Withholding Letter - Kairos 6-25-25 Meeting)