Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2018-158, FL0002208 VI.5.5 - Chlorine Optimization Study Timeline Extension + (FL0002208 VI.5.5 - Chlorine Optimization Study Timeline Extension)
- ML15342A349 + (FLB-Ack-Seabrook - Concrete Core Bores - ASR - 12/03/2015 - Follow-up Questions to D. Grinnell)
- ML20032A960 + (FLECHT-SEASET Natural Circulation Evaluation Rept, Informal Technical Rept)
- ML19246B086 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Aug 1978)
- ML20031A673 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Aug 1981)
- ML19224D432 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Dec 1978)
- ML20003D982 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Dec 1980)
- ML19224D423 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Feb 1979)
- ML19224D431 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Jan 1979)
- ML20003D978 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Jan 1981)
- ML19224D426 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Mar 1979)
- ML19224D435 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Nov 1978)
- ML20003D989 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Nov 1980)
- ML19224D422 + (FLECHT-SEASET Program, Informal Monthly Progress Rept for Sept 1978)
- ML19224D408 + (FLECHT-SEASET Program, Informal Monthly Progress Rept, Apr 1979)
- ML19347B694 + (FLECHT-SEASET Program, Monthly Progress Rept for Jul 1980)
- ML19254E039 + (FLECHT-SEASET Program, Monthly Status Rept for Aug 1979)
- ML19327A164 + (FLECHT-SEASET Program, Monthly Status Rept for June 1980)
- ML19327A161 + (FLECHT-SEASET Program, Monthly Status Rept for May 1980)
- ML19290D526 + (FLECHT-SEASET Program, Monthly Status Rept for Nov 1979)
- ML19257A589 + (FLECHT-SEASET Program, Monthly Status Rept for Oct 1979)
- ML19208C852 + (FLECHT-SEASET Program, Progress Rept for Jul 1979)
- ML19224D434 + (FLECHT-SEASET Program. Informal Monthly Progress Rept for Oct 1978)
- ML19208B323 + (FLECHT-SEASET Program. Monthly Status Rept for June 1979)
- ML19347B483 + (FLECHT-SEASET, Monthly Progress Rept for Aug 1980)
- ML20206L366 + (FLEX Forward)
- ML24312A053 + (FLEX HP Pump SDP for Nextera RUG Meeting - 11.7.2024 - Rev. 0)
- FLEX NOV Followup- Wat Inspection (Waterford 2019) + (FLEX NOV Followup- Wat)
- ML20155K835 + (FLEX Ope Data)
- ML20155K827 + (FLEX Ope Data Audit Summary_rev4)
- NG-16-0120, FLEX Strategies Phase 2 Staffing Assessment + (FLEX Strategies Phase 2 Staffing Assessment)
- ML20238B980 + (FLEX Summit Session 4 - IMC 0609 App a Tabletop)
- ML20338A250 + (FLEX in Risk Informed Licensing Presentation)
- ML20209A411 + (FLEX in Risk-Informed Licensing Action by Stephen Dinsmore, Senior Reliability and Risk Analyst, Nrr/Dra/Apla - July 29, 2020 FLEX Presentation)
- IA-15-033, FLS Ind FFD Notice of Violation -III IA-15-033 + (FLS Ind FFD Notice of Violation -III IA-15-033)
- ML23335A012 + (FNP - IP95001 Inspection Notification and Request for Information (Email to Farley))
- ML20247E885 + (FNP Unit 2 Cycle 13 Colr)
- IR 05000348/2025005 + (FNP Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2025005 and 05000364/2025005)
- ML13198A453 + (FNP-0-ESB-0.2, Version 2.0 - Farley Nuclear Plant, Specific Background Document for FNP-1/2 - ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257)
- NL-13-1257, FNP-0-ESB-0.2, Version 2.0 - Farley Nuclear Plant, Specific Background Document for FNP-1/2 - ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (FNP-0-ESB-0.2, Version 2.0 - Farley Nuclear Plant, Specific Background Document for FNP-1/2 - ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257)
- ML13198A454 + (FNP-0-ESB-0.3, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.3 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257)
- NL-13-1257, FNP-0-ESB-0.3, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.3 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257 + (FNP-0-ESB-0.3, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.3 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257)
- ML13198A455 + (FNP-0-ESB-0.4, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.4- Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257)
- NL-13-1257, FNP-0-ESB-0.4, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.4- Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (FNP-0-ESB-0.4, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.4- Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257)
- ML13198A456 + (FNP-1-ESP-.02, Revision 19 - Farley Nuclear Plant - Event Specific Procedure FNP-1- ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257)
- NL-13-1257, FNP-1-ESP-.02, Revision 19 - Farley Nuclear Plant - Event Specific Procedure FNP-1- ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (FNP-1-ESP-.02, Revision 19 - Farley Nuclear Plant - Event Specific Procedure FNP-1- ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257)
- ML13198A457 + (FNP-1-ESP-0.3, Revision 13 - Farley Nuclear Plant - Event Specific Procedure FNP-1 - ESP-0.3 - Natural Circulation Cooldown with Allowance Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257)
- NL-13-1257, FNP-1-ESP-0.3, Revision 13 - Farley Nuclear Plant - Event Specific Procedure FNP-1 - ESP-0.3 - Natural Circulation Cooldown with Allowance Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257 + (FNP-1-ESP-0.3, Revision 13 - Farley Nuclear Plant - Event Specific Procedure FNP-1 - ESP-0.3 - Natural Circulation Cooldown with Allowance Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257)
- ML13198A458 + (FNP-1-ESP-0.4, Revision 21 - Farley Nuclear Plant Event Specific Procedure FNP-1-ESP-0-4 Natural Circulation Cooldwn with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257)
- NL-13-1257, FNP-1-ESP-0.4, Revision 21 - Farley Nuclear Plant Event Specific Procedure FNP-1-ESP-0-4 Natural Circulation Cooldwn with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (FNP-1-ESP-0.4, Revision 21 - Farley Nuclear Plant Event Specific Procedure FNP-1-ESP-0-4 Natural Circulation Cooldwn with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257)
- ML13198A459 + (FNP-2-ESP-0.2, Revision 16 - Farley Nuclear Plant Event Specific Procedure FNP-2 - ESP-0.2 Natural Circulation Cooldown to Prevent Reaction Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257)