Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317A471 + (Evaluation of Proposed Change Regarding Revision to the Emergency Plan for Technical Support Center Relocation & Revised Pages to Emergency Plan)
- ML15091A661 + (Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme)
- ML19322C099 + (Evaluation of Proposed Changes to Tech Specs for Facility Reload Cycle 2 & Supporting BAW-1409 Rept.Densification Analysis Acceptable,Provided Addl Info Submitted)
- ML093360321 + (Evaluation of Proposed Emergency Action Level Revision)
- ML092720671 + (Evaluation of Proposed Emergency Action Level Revision)
- ML090130047 + (Evaluation of Proposed Emergency Action Level Revision)
- ML082200367 + (Evaluation of Proposed Emergency Action Levels)
- ML040220124 + (Evaluation of Proposed Interim Staff Guidance (ISG)-11: Recommendations for Fatigue Environmental Effects in a License Renewal Application)
- ML072610510 + (Evaluation of Proposed Risk-Informed Request for an Inservice Inspection Program)
- ML20083J994 + (Evaluation of Proposed Special Test Exception for Diesel Generator & Essential Cooling Water Maintenance)
- ML20078N358 + (Evaluation of Proposed Wildlife Mgt Lake, Final Rept)
- ML20234E306 + (Evaluation of Protective Action Risks)
- ML20070D089 + (Evaluation of Quad Cities Nuclear Power Station - Commonwealth Edison Co,1982)
- ML20031F166 + (Evaluation of Quarterly Progress Rept 3,Research Program on Hydrogen Combustion & Control,)
- ML17355A458 + (Evaluation of Question Bank Only Generic Fundamentals Exam Final 12-20-17)
- Information Notice 1986-41, Evaluation of Questionable Exposure Readings of Licensee Personnel Dosimeters + (Evaluation of Questionable Exposure Readings of Licensee Personnel Dosimeters)
- ML16092A034 + (Evaluation of RBS Remote Shutdown Panel Rooms)
- 05000461/FIN-2017012-03 + (Evaluation of RCE 04082490, Reactor Scram from Trip of 1AP07EJ))
- 05000461/FIN-2014008-02 + (Evaluation of RCE 1594407 Against Inspection Procedure 95001 Objectives)
- ML20137E719 + (Evaluation of RCS Components & Component Supports for Optimized Reactor Coolant Pump Support Configuration Loadings)
- ML20134P031 + (Evaluation of RCS Loads & Component Support Margins Resulting from Optimized Reactor Coolant Pump Support Configuration)
- ML20214V192 + (Evaluation of RCS for Elimination of Primary Component Support Snubbers)
- ML20235A514 + (Evaluation of RCS for Steam Generator Upper Support Redesign)
- ML20077E548 + (Evaluation of RTV Coatings for Post Insulators, Interim Rept)
- ML13317A021 + (Evaluation of RWST for Buckling)
- ML20008F321 + (Evaluation of Radiation Protection Plan)
- ML19259C725 + (Evaluation of Radiation Streaming, Informal Progress Rept as of 790715)
- ML19209C247 + (Evaluation of Radiation Streaming.Monthly Progress Rept as of 790815)
- ML20140G645 + (Evaluation of Radioactive Liquid Effluent Releases from Rancho Seco Nuclear Power Plant)
- ML20150B630 + (Evaluation of Radioiodine Measurements at Pilgrim Nuclear Power Plant)
- ML19289F920 + (Evaluation of Radiolysis Associated W/TMI-2 Incident)
- ML20132B021 + (Evaluation of Radionuclide Geochemical Information Developed by DOE HIGH-LEVEL Nuclear Waste Repository Site Projects.Annual Progress Report for October 1983-September 1984)
- ML20083K578 + (Evaluation of Radionuclide Geochemical Information Developed by DOE HIGH-LEVEL Nuclear Waste Repository Site Projects)
- ML20050B779 + (Evaluation of Rancho Seco Nuclear Generating Station- Unit 1, Feb 1982)
- ML20132C668 + (Evaluation of Rcic,Turbine Exhaust Pressure Trip for LOCA Application)
- ML20010E943 + (Evaluation of Reactivity Response for Steam Line Break Event W/Unterminated Emergency Feedwater Flow)
- ML13323A456 + (Evaluation of Reactor Coolant Pump Restart Criteria for San Onofre Unit 1)
- ML17256A404 + (Evaluation of Reactor Coolant Pump Restart Requirements Following Steam Generator Tube Failure at Re Ginna Nuclear Power Plant)
- ML18078A942 + (Evaluation of Reactor Coolant Sys Considering Subcompartment Pressurization Following a Loca)
- ML18092A176 + (Evaluation of Reactor Pressure Vessel Head & Internals Lift Rigs for Salem Units 1 & 2)
- ML022770461 + (Evaluation of Reactor Pressure Vessel Nozzle to Hot-leg Piping Bimetallic Weld Joint Integrity for the V.C. Summer Nuclear Power Plant, Figures 21 - 70)
- ML022760264 + (Evaluation of Reactor Pressure Vessel Nozzle to Hot-leg Piping Bimetallic Weld Joint Integrity for the V.C. Summer Nuclear Power Plant, Memorandum Dated 09/27/02 - Figure 20)
- ML19326C701 + (Evaluation of Reactor Protection Sys Grounding Concern)
- ML19273B907 + (Evaluation of Reactor Vessel Brittle Failure Due to Injection of Cold HPI Water During Small LOCA Events)
- ML072530532 + (Evaluation of Reactor Vessel Head Inspection Data for Control Element Drive Mechanism (CEDM) 56)
- ML20056F294 + (Evaluation of Reactor Vessel OD Flaw (PIP 2-M93-0717))
- ML20009C775 + (Evaluation of Reattachment Welds for Loft Cladding Thermocouples, Interim Rept)
- ML20207Q715 + (Evaluation of Recirculation Sys Flow Anomaly in Pilgrim Nuclear Power Station, Informal Technical Evaluation Rept)
- ML20043C956 + (Evaluation of Reinforced Concrete Gamma Pit,Canal & Holdup Tank Cintichem Plant,Tuxedo,Ny)
- ML20031E066 + (Evaluation of Relative Surface Properties of Alternative Nuclear Waste Encapsulates, Quarterly rept,Jan-Mar 1981)
- ML20031E064 + (Evaluation of Relative Surface Properties of Alternative Nuclear Waste Encapsulates, Interim Progress Rept & Renewal Proposal)