MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report 2024-09-09
[Table view] Category:Safety Evaluation
MONTHYEARML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24078A2622024-03-26026 March 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML24017A2092024-03-12012 March 2024 – Issuance of Amendment Nos. 254 and 209 to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24005A2772024-02-20020 February 2024 Issuance of Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications ML23219A0032023-09-0101 September 2023 SLRA SER Rev 1 ML23200A1462023-07-21021 July 2023 Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 ML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML20023B3782020-02-19019 February 2020 Safety Evaluation for Relief Request RR-16, Alternate Repair of 2B Boric Acid Makeup Pump Revision for the Fourth 10-Year Inservice Inspection Interval ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19254B5332019-09-30030 September 2019 Safety Evaluation for Relief Request RR#15, Revision 0, Regarding Limited Piping Examinations ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19115A2812019-05-31031 May 2019 Safety Evaluation for Relief Request No. 6 for the Fifth 10 Year Inservice Inspection Interval ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18256A0982018-10-30030 October 2018 Safety Evaluation for Relief Request No.5 for the Fifth 10-Year Inservice Inspection Interval ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle 2024-09-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 17, 2009 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
ST. LUCIE PLANT, UNITS 1 AND 2 - EVALUATION OF PROPOSED EMERGENCY ACTION LEVEL REVISION (TAC NOS. MD9926 AND MD9927)
Dear Mr. Nazar:
By letter dated May 14, 2008, and supplemented by letters dated May 15, and June 12, 2009, Florida Power and Light (the licensee) requested prior U.S. Nuclear Regulatory Commission (NRC) approval for proposed changes to the emergency action levels (EALs) for the St. Lucie Nuclear Power Station.
The requested changes to the licensee's EALs support a conversion from the current EAL scheme to a scheme based on Nuclear Energy Institute (NEI) 99-01, "Methodology for Development of Emergency Action Levels" (Revision 5, February 2008). St. Lucie currently uses an EAL scheme based on NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
The NRC staff performed a review of the proposed changes to St. Lucie's EALs as directed by Appendix E to Title 10 of the Code of Federal Regulations (10 CFR) Part 50. The NRC staff determined that incorporation of the proposed changes meets the standards in 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50, and provides reasonable assurance that adequate protective measure can and will be taken in the event of a radiological emergency.
Therefore, the NRC staff concludes that the licensee's proposed changes to the emergency action levels for St. Lucie, as outlined in its letter dated May 14, 2008, and supplemented by letters dated May 15 and June 12, 2009, are acceptable.
M. Nazar -2 We expect the licensee to implement the EALs as approved by the NRC (Le., as provided in of the licensee's letter dated June 12, 2009, which includes the implementation of the Emergency Action Level Design Basis Document). The licensee indicated its intent to implement the new EAL schemes within 6 months of NRC approval. If the licensee changes the EALs as approved by this safety evaluation via 10 CFR 50.54(q) prior to implementation, the licensee should ensure that the changes are provided to the NRC during the next Emergency Preparedness baseline inspection.
Sincerely,
~~
Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION REGARDING THE PROPOSED REVISION TO EMERGENCY ACTION LEVELS FLORIDA POWER AND LIGHT COMPANY, ET AL.
ST. LUCIE PLANT, UNITS 1 AND 2 DOCKET NOS. 50-335 AND 50-389
1.0 INTRODUCTION
By application dated May 14, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081920701), and supplemented by letters dated May 15, 2009, and June 12,2009 (ADAMS Accession No.'s. ML091390816, and ML091670256 respectively), Florida Power and Light (the licensee), requested prior U.S. Nuclear Regulatory Commission (NRC) approval for proposed changes to the emergency action levels (EALs) for the St. Lucie Plant.
The requested changes to the licensee's EALs support a conversion from the current EAL scheme to a scheme based on Nuclear Energy Institute (I'JEI) 99-01, "Methodology for Development of Emergency Action Levels," Revision 5, February 2008, (ADAMS Accession No. ML080450149). Henceforth, NEI 99-01, Revision 5, dated February 2008, will be referred to as NEI 99-01. St. Lucie currently uses an EAL scheme based on NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
2.0 REGULATORY EVALUATION
The I'JRC staff reviewed the proposed revision against regulations and guidance described below.
2.1 Regulations Section 47 of Part 50, "Domestic Licensing of Production and Utilization Facilities," in Title 10 of the Code of Federal Regulations (10 CFR) sets forth emergency plan requirements for nuclear power plant facilities. Paragraph 50.47(a)(1 )(i) states, in part, "... no initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency." Paragraph 50.47(b) establishes the standards that the on-site and off-site emergency response plans must meet for NRC staff to make a positive finding that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. One of these standards,1 0 CFR 50.47(b)(4), stipulates that emergency plans include a standard emergency classification and action level scheme.
Enclosure
-2 Section IV.B of Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," to 10 CFR Part 50, states, in part, The means to be used for determining the magnitude of, and for continually assessing the impact of, the release of radioactive materials shall be described, including emergency action levels that are to be used as criteria for determining the need for notification and participation of local and State agencies, the Commission, and other Federal agencies, and the emergency action levels that are to be used for determining when and what type of protective measures should be considered within and outside the site boundary to protect health and safety. The emergency action levels shall be based on in-plant conditions and instrumentation in addition to onsite and offsite monitoring. These initial emergency action levels shall be discussed and agreed on by the applicant or licensee and state and local governmental authorities, and approved by the NRC.
Thereafter, emergency action levels shall be reviewed with the State and local governmental authorities on an annual basis. A revision to an emergency action level must be approved by the NRC before implementation if:
- 1) the licensee is changing from one emergency action level scheme to another emergency action level scheme (e.g., a change from an emergency action level scheme based on NUREG-0654 to a scheme based upon NUMARC/NESP-007 or NEI-99-01);
(2) the licensee is proposing an alternate method for complying with the regulations; or, (3) the emergency action level revision decreases the effectiveness of the emergency plan.
2.2 Guidance Regulatory Guide 1.101, Revisions 3 and 4, "Emergency Planning and Preparedness for Nuclear Power Reactor," endorsed NUMARC/NESP-007 and NEI 99-01 Revision 4, EAL guidance respectively, as acceptable alternatives to the guidance provided in NUREG-0654 for development of EALs to comply with 10 CFR 50.47 and Appendix E to 10 CFR Part 50. A change in an EAL scheme to incorporate the improvements provided in NUMARC/NESP-007 or NEI 99-01 would not decrease the overall effectiveness of the emergency plan, but due to the potential safety significance of the change, needs prior NRC review and approval.
The NRC staff, in a letter dated February 22, 2008, from Christopner Miller to Alan Nelson, NEI, concluded the guidance contained in NEI 99-01, is an acceptable method to develop an EAL scheme that meets the requirements of Section IV of Appendix E to 10 CFR Part 50 and 10 CFR 50.47(b)(4).
-3 The following are also acceptable methods to the NRC staff for developing EALs that meet the requirements of in Section IV of Appendix E to 10 CFR Part 50 and 10 CFR 50.47(b)(4):
- Appendix 1 to NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," dated November 1980;
- NUMARC/NESP-007, Revision 2, "Methodology for Development of Emergency Action Levels," dated January 1992; and
- NEI 99-01, Revision 4, "Methodology for Development of Emergency Action Levels," dated January 2003.
Guidance is also provided in Regulatory Issue Summary (RIS) 2003-18, with Supplements 1 and 2, "Use of NEI 99-01, Methodology for Development of Emergency Action Levels." This provides guidance for developing or changing a standard emergency classification and action level scheme. In addition, this RIS provides recommendations to assist licensees, consistent with Section IV.S to Appendix E of Part 50, in determining whether to seek prior NRC approval of deviations from the guidance.
3.0 TECHNICAL EVALUATION
The proposed changes were submitted to the NRC for a technical and regulatory review prior to implementation by the licensee, as required under Section IV.S of Appendix E to 10 CFR Part 50.
This evaluation is based on a revision to EALs provided in the licensee's application letter and supplemented by the licensee's responses to the NRC's requests for additional information.
The St. Lucie Nuclear Plant currently utilizes an EAL scheme based on NUREG-0654, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants." The licensee is converting to an EAL scheme based on NEI99-01.
In its application and supplemental letters, the licensee submitted the proposed EALs for the St. Lucie Plant, its technical basis, a comparison matrix, the EAL numbering scheme, and an explanation for any difference or deviation from NEI 99-01. The comparison matrix provided a cross-reference relating the proposed EAL scheme to the EALs in I'JEI 99-01. The NRC staff has reviewed the technical basis for the proposed EALs, the differences or deviations from NEI 99-01, and the licensee's justifications. The following NEI 99-01 guidelines were considered:
- consistency (Le., the EALs would lead to similar decisions under similar circumstances at different plants);
- human engineering and user-friendliness;
- potential for classification upgrade only when there is an increasing threat to public health and safety;
-4
- ease of upgrading and downgrading;
- thoroughness in addressing and disposing of the issues of completeness and accuracy raised regarding Appendix 1 to NUREG-0654;
- technical completeness of each classification level;
- logical progression in classification for multiple events; and
- objective, observable values.
The NRC staff reviewed the proposed EALs and has determined that the proposed EALs are consistent with EALs implemented at similarly designed plants. In addition, these EALs use objective and observable values, and are consistent with the guidance of NEI 99-01 in these areas.
The NRC staff reviewed the proposed EALs to determine if the wording addresses human engineering and user friendliness concerns. The proposed EALs use procedure language, including specific tag numbers for instrument readings and alarms; use flow charts, critical safety function status trees, check lists, and combinations of the above. Based on this review, the staff has determined that the proposed EALs meet the guidelines in NEI 99-01 in this area.
The NRC staff reviewed the proposed EAL sets (a group of EALs within a category related to a common concern, Le., the Unusual Event, Alert, Site Area Emergency, and General Emergency related to a failure of the plant to shutdown via an automatic scram would be considered an EAL set), and has determined that classification upgrades are based upon an increasing threat to public health and safety, can effectively support upgrading and downgrading, and follow a logical progression for multiple events. Based on this review, the NRC staff concludes that the EALs are consistent with the guidance of NEI 99-01 in these areas.
The NRC staff also reviewed the proposed EALs for technical completeness and accuracy for each classification level. The proposed EALs are based on risk assessment to set the boundaries of the emergency classification levels and assure that all EALs that trigger that emergency classification are in the same range of relative risk. Precursor conditions of more serious emergencies also represent a potential risk to the public and are appropriately classified. The staff has determined that the proposed EALs are consistent with the guidance of NEI 99-01 in these areas.
Based on its review of the proposed EALs, the NRC staff concludes that these EALs are consistent with the guidance in NEI 99-01 in these areas.
4.0 CONCLUSION
The NRC staff performed a technical and regulatory review of the proposed changes to the St Lucie EALs. The staff has determined that the proposed changes meet the guidelines in NEI 99-01, which is an acceptable alternative for development of an EAL scheme that meets the regulatory requirements. Based on this, the staff concludes that the proposed EALs meet the standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50 and provide
-5 reasonable assurance that the licensee will take adequate protective measures in a radiological emergency. Therefore, based on this conclusion, the NRC staff determines that the proposed EAL changes are acceptable.
Principal Contributor: Don A. Johnson, NSIR Dated: November 17, 2009
... ML092720671 *via email OFFICE NRRlLPL2-2 NRRlLPL2-2/LA NS IRlDPRlDDEP/BC*
NAME BMozafari BClayton MNorris DATE 10/30/09 10/30/09 10/23/09 OFFICE NRR/LPL2-2/BC NRRlDORUD NRRlD NAME TBoyce JGiitter w/ changes ELeeds DATE 10/30/09 11/02/09 11/17/09