Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000275/1989024 + (Emergency Operating Procedures Insp Repts 50-275/89-24 & 50-323/89-24 on 891127-1208.No Violations or Deviations Noted.Major Areas Inspected:Emergency Operating Procedures. Findings of Areas of Concern Encl)
- IR 05000317/1989080 + (Emergency Operating Procedures Insp Rept 50-317/89-80 & 50-318/89-80 on 890515-26.Potential Restart Issue Concerns Noted.Major Areas Inspected:Adequacy & Completeness of Plant Emergency Operating Procedures)
- ML14176A799 + (Emergency Operating Procedures Insp Rept 50-261/89-16 on 890918-29.No Violations or Deviations Noted.Major Areas Inspected:Verification That Two Emergency Operating Procedures for Plant Technically Correct)
- IR 05000254/1988200 + (Emergency Operating Procedures Insp Rept 50-254/88-200 on 880613-30.Inadequacies & Deficiencies Noted.Major Areas Inspected:Determination If Procedures Technically Correct & Whether Procedures Could Be Carried Out & Performed)
- ML051110064 + (Emergency Operating Procedures R.E. Ginna Nuclear Power Plant)
- ML19290E936 + (Emergency Operating Procedures Relevant to SEP Topic III-12, Environ Qualification of Safety-Related Equipment)
- ML19290E944 + (Emergency Operating Procedures Relevant to SEP Topic III-12, Environ Qualification of Safety-Related Equipment)
- ML20151C815 + (Emergency Operating Procedures Training Program Summary Description)
- ML20138R460 + (Emergency Operating Procedures Verification)
- ML20114D508 + (Emergency Operating Procedures Writers Guide)
- ML20046B527 + (Emergency Operating Procedures for Oyster Creek,Including Rev 1 to 2000-EMG-3200.01A,.01B,.04A,.04B,.08A,.08B,Rev 2 to 2000-EMG-3200.12,Rev 4 to 2000-EMG-3200.05,Rev 5 to 2000-EMG-3200.10,.11 & Rev 9 to 2000-EMG-3200.02)
- ML023360081 + (Emergency Operating Procedures for R. E. Ginna)
- ML023390115 + (Emergency Operating Procedures for R. E. Ginna Nuclear Power Plant)
- ML022410335 + (Emergency Operating Procedures for R.E. Ginna Nuclear Power Plant, ECA-0.2, Revision 14 - FR-Z.1, Revision 6)
- ML022410313 + (Emergency Operating Procedures for R.E. Ginna Nuclear Power Plant, Contents - EOP ES-1.3, Revision 34)
- ML031750329 + (Emergency Operating Procedures, Rev 2 of Att-2.4 Through Rev 26 of ECA-2.1)
- ML031620451 + (Emergency Operating Procedures, Rev 26 of ECA-3.1 Through Rev 18 of FR-I.3)
- ML031400319 + (Emergency Operating Procedures, for R.E. Ginna Nuclear Power Plant)
- ML18092A984 + (Emergency Operating Procedures,Including Rev 0 to EOP-TRIP-1, Reactor Trip or Safety Injection & Proposed Changes,Rev 0 to EOP-LOCA-1,Loss of Reactor Coolant & Rev 0 to EOP-LOCA-3, Transfer to Cold Leg Recirculation)
- ML20215M874 + (Emergency Operating Procedures,Reactor Operator Simulator Training)
- ML20024C731 + (Emergency Operating Spec 69-1001168-00, Loss of Reactor Coolant/Rcs Pressure)
- ML20024C771 + (Emergency Operating Spec 69-1001168-01, Loss of Reactor Coolant/Rcs Pressure)
- ML20003C329 + (Emergency Operating Spec:Operating Guidelines for Small Breaks for Oconee 1,2 & 3,TMI 1 & 2,Rancho Seco 1, & Arkansas 1)
- ML19256F652 + (Emergency Operating Specs,Operating Guidelines for Small Breaks)
- IR 05000260/1992027 + (Emergency Operating Team Insp Rept 50-260/92-27 on 920720-31.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures,Including Technical Accuracy)
- ENS 47372 + (Emergency Operation Facility Out of Service Due to Planned Maintenance Activity)
- ML20032B917 + (Emergency Operations Facility)
- ML18139B838 + (Emergency Operations Facility)
- DCL-10-083, Emergency Operations Facility (DCPP EOF) Facility Emissions and Throughput Data for Inventory Year 2008 (Annual Air Emissions Report) and Associated Facility Reporting Requirements + (Emergency Operations Facility (DCPP EOF) Facility Emissions and Throughput Data for Inventory Year 2008 (Annual Air Emissions Report) and Associated Facility Reporting Requirements)
- ENS 46642 + (Emergency Operations Facility (Eof) Without Power)
- ML031700640 + (Emergency Operations Facility Activation)
- ML023520528 + (Emergency Operations Facility Activation)
- ENS 50350 + (Emergency Operations Facility Air Conditioning Operating at Reduced Capacity)
- ENS 48171 + (Emergency Operations Facility Data Network Maintenance)
- ENS 45634 + (Emergency Operations Facility Inaccessible Due to Road Flooding)
- ENS 45427 + (Emergency Operations Facility Inoperable Due to Loss of Ventilation)
- ENS 44355 + (Emergency Operations Facility Inoperable for Maintenance Work)
- ENS 42940 + (Emergency Operations Facility Non Operational Due to Planned Maintenance)
- ENS 47930 + (Emergency Operations Facility Non-Functional Due to Failed Return Fan)
- ENS 48953 + (Emergency Operations Facility Not Available)
- ENS 48955 + (Emergency Operations Facility Not Available)
- ENS 54380 + (Emergency Operations Facility Out of Service)
- ENS 54382 + (Emergency Operations Facility Out of Service)
- ENS 54379 + (Emergency Operations Facility Out of Service)
- ENS 43384 + (Emergency Operations Facility Out of Service for Planned Maintenance)
- ENS 47736 + (Emergency Operations Facility Planned Maintenance)
- ENS 45248 + (Emergency Operations Facility Planned Maintenance)
- ENS 45036 + (Emergency Operations Facility Power Interruption)
- ENS 44280 + (Emergency Operations Facility Power Outage)
- ENS 50773 + (Emergency Operations Facility Unavailable Due to Planned Ventilation Maintenance)
- ENS 43561 + (Emergency Operations Facility Ventilation Inoperable)
- ENS 48255 + (Emergency Operations Facility and Emergency Notification System Phone Out of Service)