Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-511 + (Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26)
- TSTF-108 + (Eliminate the 12 Hour Cot on Power Range and Intermediate Range Channels for Physics Test Exceptions)
- TSTF-266 + (Eliminate the Remote Shutdown System Table of Instrumentation and Controls)
- TSTF-452 + (Elimination of 10-YEAR Nozzle Inspection Surveillances)
- ML18018B898 + (Elimination of Arbitrary Intermediate Break Points in Main Feedwater Sys)
- TSTF-447 + (Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors)
- Information Notice 1997-28, Elimination of Instrument Response Time Testing Under the Requirements of 10 CFR 50.59 + (Elimination of Instrument Response Time Testing Under the Requirements of 10 CFR 50.59)
- ML19337E048 + (Elimination of Marginal Safety Requirements - Task 2 Application of Methodology & Development of Recommendations, Ltr Rept)
- ML19337E049 + (Elimination of Marginal Safety Requirements - Task 1, Methodology Development, Ltr Rept)
- ML20072F366 + (Elimination of Pressure Sensor Response Time Testing Requirements)
- ML20087E831 + (Elimination of Pressure Sensor Response Time Testing Requirements,Wog Program MUHP-3040 Rev 1)
- ML19261A199 + (Elimination of Primary Loop Pipe Breaks)
- ML19261A295 + (Elimination of Primary Loop Pipe Breaks)
- ML091970629 + (Elimination of Recirculation Spray Pump Response Time SR (ME1501 and ME1502))
- ML16245A817 + (Elimination of Requirements Marginal to Safety)
- TSTF-413 + (Elimination of Requirements for a Post Accident Sampling System - NEDO-3299)
- TSTF-366 + (Elimination of Requirements for a Post Accident Sampling System)
- TSTF-442 + (Elimination of Requirements for a Post Accident Sampling System)
- RC-05-0181, Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process + (Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process)
- ML20049H241 + (Elimination of Review of Financial Qualifications of Electric Utils in Licensing Hearings, 10CFR2 & 10CFR50 Final Rule.Eliminates Review of Financial Qualification & Requires Licensees to Maintain Property Damage Insurance)
- ML20050A391 + (Elimination of Review of Financial Qualifications of Electric Utils in Licensing Hearings for Nuclear Power Plants, Final Rule 10CFR Parts 2 & 50)
- ML18127A075 + (Elimination of Technical Specification 6.6)
- ML25142A374 + (Elizabeth Sky Vereen, Chief Pee Dee Indian Nation of Beaver Creek)
- ML073460326 + (Elizabeth Southerland Ltr Response to Recommendations Regarding the Decommissioning of the Rancho Seco Nuclear Generating Station in Herald, California)
- ML22140A319 + (Ellensonm-hv-th27)
- ML22145A346 + (Ellensonm-th27-bio)
- ML060940383 + (Elliot Et Al 1986, Website Reference Used in Chapter 8 NMP FSEIS)
- ML023360309 + (Elliot Jones Withdrawal of Request for Special Notice & for Inclusion on Mailing Matrix)
- ML113220478 + (Elmo Collins Letter to Jeanette Mott Oxford in Response to Her Letter Dated 8/25/2011 Regarding Shutdown at Callaway Plant)
- ML14002A455 + (Elpc Reply in Support of Its Appeal of the ASLB Denial of Elpcs Petition for Intervention and Hearing Request)
- ML14023A885 + (Elpcs Answer Opposing Exelons Motion to Strike Elpcs Reply)
- ML14023A884 + (Elpcs Motion for Leave to File Its Reply)
- ENS 56627 + (Eluate Exceeded Mo-99 Limit)
- ENS 57591 + (Eluate Exceeded Permissible Concentration)
- ENS 57060 + (Eluate Exceeding Permissible Concentration)
- ML20214F604 + (Elucidated Ro:On 861022,HPCI Valve Failed to Open During Manual Operation.Undersized Motor Overloads Would Not Have Prevented Sys Operation.Ler Will Not Be Submitted Since Event Not Reportable Per 10CFR50.73)
- ML070730104 + (Elymus Trachycaulus)
- ML18319A090 + (Emai from H Weger Adoption/Effective Date of TCEQ Final Regulations to Rats Id 2011-1)
- ML20153A790 + (Emai: RFI for Callaway EP Program Inspection)
- ML18226A335 + (Email & Documents Fda Weac)
- ML18159A143 + (Email & Response from Westinghouse Responses to NRC Groundwater Questions from Public Teleconference on 5-17-2018 Final)
- ML18311A186 + (Email (11-5-18) RR RFI Responses for Review)
- ML060940622 + (Email (3/29/06) from Peter Mazzaferro to Ngoc (Tommy) B. Le NMP2 Bioshield Fluence Calc Info)
- ML13182A263 + (Email (6-26-13); Prairie Island - Acceptance Review of LAR to Revise TS 5.6.5 Core Operating Limits Report (COLR))
- ML24071A176 + (Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2)
- ML23300A126 + (Email - (External_Sender) Radiological Source Term Topical Report - Follow Up Information)
- ML23320A229 + (Email - (External_Sender) Re_Hfe Project Plan and Methodologies_ Topical Report (L-2023-TOP-0026))
- ML24071A174 + (Email - (External_Sender) Shutdown Petition to NRC Commissioners)
- ML13050A099 + (Email - 02-15-2013 - Confirmation from Seabrook on Outlet Nozzle Ni Content)
- ML13098A204 + (Email - 04-05-2013 - PRB Initial Recommendation Regarding Oyster Creek 2.206 Petition)
- ML13105A431 + (Email - 04-12-2013 - Re PRB Initial Recommendation Regarding Oyster Creek 2.206 Petition)