Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25261A104 + (Eden Radioisotopes, LLC - Eden Isotope Production Complex - Request for Confirmation of Eligibility for Reduced Hourly Rate Pursuant to Fy 2025 Fee Rule (90 Fr 26730))
- ML24053A016 + (Eden Radioisotopes, LLC - Electronic Reference Portal Information Access Agreement)
- ML19169A062 + (Eden Radioisotopes, LLC - Intent to Build Domestic Medical Isotope Production Facility)
- ML20283A375 + (Eden Radioisotopes, LLC - Isotope Production Facility License Application Submittal Schedule Reevaluation)
- ML24065A500 + (Eden Radioisotopes, LLC - Preapplication Readiness Assessment Activities and Audit Plan for Eden Draft Environmental Report for a Medical Isotope Production Facility)
- ML25115A140 + (Eden Radioisotopes, LLC - Preapplication Readiness Assessment Observations on Eden Draft Preliminary Safety Analysis Report for a Medical Isotope Production Facility)
- ML24115A130 + (Eden Radioisotopes, LLC - Preapplication Readiness Assessment Observation on the Eden Draft Environmental Report for a Medical Isotope Production Facility)
- ML19169A061 + (Eden Radioisotopes, LLC - Request for Exemption to Submit a Construction Permit Application in Two Parts as Described in 10 CFR 2.101)
- ML20300A541 + (Eden Radioisotopes, LLC - Review of Safeguards Information Protection Plan)
- ML20008D189 + (Eden Radioisotopes, LLC December 16, 2019 Pre-Application Meeting)
- EPID:L-2019-LLL-0027 + (Eden Radioisotopes, LLC December 16, 2019 Pre-Application Meeting)
- ML20028F428 + (Eden Radioisotopes, LLC January 21, 2020 Meeting Presentation)
- ML20318A026 + (Eden Radioisotopes, LLC Submittal of Safeguards Information Protection Plan)
- ML20248H497 + (Eden Radioisotopes, LLC, NRC Pre-Application Meeting Slides (7-16-2020))
- ML20283A477 + (Eden Radioisotopes, LLC, Response to the September 9th, 2020 Request for Additional Information Regarding Safeguards Information (SGI) Protection Plan)
- ML20248H496 + (Eden Radioisotopes, LLC, Submittal of Pre-application (July 16, 2020) Slides)
- ML20248H495 + (Eden Radioisotopes, LLC, Submittal of Pre-application (July 16, 2020) Slides)
- ML26015A111 + (Eden Radioisotopes, LLC, Submittal of Regulatory Engagement Plan Revision 1)
- ML25181A768 + (Eden Radioisotopes, LLC, Submittal of Regulatory Engagement Plan)
- ML19261E731 + (Ederers Nuclear Safety-Related Extra Safety & Monitoring (X-SAM) Cranes, Nonproprietary Version)
- ML21221A153 + (Edf Inc.S Notice of Withdrawal of Edf Inc.S Petition for Leave to Intervene and Hearing Request)
- ENS 43083 + (Edg Actuation Due to Accidental Switch Mispositioning)
- ENS 41798 + (Edg Inoperable Due to Loose Electrical Connection)
- ML20151M875 + (Edge Distance Testing of Hilti Kwik-Bolt)
- IR 015000037/2019001 + (Edge Management, LLC, D/B/A Edge NDT Services - NRC Inspection No. 15000037/2019001 and Notice of Violation)
- IR 015000037/2020001 + (Edge Management, NRC Form 591M Part 1, Inspection Report No. 15000037/2020001)
- ML20042B122 + (Edgemont Remedial Action Program Monthly Ltr Rept for Jan 1982)
- ML20009B489 + (Edgemont Remedial Action Program Survey Ltr Rept for Apr 1981)
- ML20049H373 + (Edgemont Remedial Action Program, Dec 1981 Monthly Rept)
- ML20054E563 + (Edgemont Remedial Action Program, Monthly Ltr Rept for Apr 1982)
- ML20052E108 + (Edgemont Remedial Action Program, Monthly Ltr Rept for Mar 1982)
- ML20027D558 + (Edgemont Remedial Action Program, Monthly Rept for Aug 1982)
- ML20040A743 + (Edgemont Remedial Action Program, Monthly Rept for Nov 1981)
- ML21305A057 + (Edgewell Personal Care - Requesting Termination of General License GL-727411-26)
- OI 4-2011-027, Edington, Closure of Investigation (OI 4-2011-027) + (Edington, Closure of Investigation (OI 4-2011-027))
- OI 4-2011-008, Edington, Closure of Investigation - OI 4-2011-008 + (Edington, Closure of Investigation - OI 4-2011-008)
- ML041330408 + (Edison International - 2002 Annual Report)
- ML13309A429 + (Edison Intl 1996 Annual Rept)
- ML20034E185 + (Edison Warehouse W-50)
- ML14034A024 + (Edit - Transcript of Discussion of the Crystal River, Unit 3 Post-Shutdown Decommissioning Activities Report, 01/16/214)
- ML16202A098 + (Edited Email from D. Grinnell to a Buford/F. Bower Regarding Seabrook ASR Unresolved Issue)
- ML16215A391 + (Edited Transcript of July 28, 2016 of Ucs Presentation Before PRB)
- ML19290C928 + (Edited Transcripts of Speech Presented at Atomic Energy Authority of United Kingdom)
- ML20126C336 + (Edition 2,Rev 3 to Pacific Nuclear Sys,Inc QA Manual)
- ML20127M598 + (Edition 2,proposed Rev 3 to QA Manual)
- ML22263A043 + (Editorial Change to SLC 16.10-5)
- ML20117D919 + (Editorial Changes to Reactor Operator Requalification Plan)
- ML18059A688 + (Editorial Changes to Rev 6 to Emergency Implementing Procedure EI-6.13, Protective Action Recommendations for Offsite Populations)
- ML13156A353 + (Editorial Comments Regarding the Safety Evaluation Report (SER) with Open Items Related to the License Renewal)