Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148N117 + (Dynamic Photoelastic Study of Crack Arrest. Monthly Progress Rept Describes Status of Experiments & Analysis Efforts)
- ML19225C890 + (Dynamic Photoelastic Study of Crack Arrest, Interim Rept, May 1979)
- ML20150B583 + (Dynamic Photoelastic Study of Crack Arrest, Monthly Progress Rept)
- ML19259B818 + (Dynamic Photoelastic Study of Crack Arrest, Monthly Progress Rept)
- ML19242A201 + (Dynamic Photoelastic Study of Crack Arrest, Progress Rept for Apr 1979)
- ML19225C558 + (Dynamic Photoelastic Study of Crack Arrest, Progress Rept, June 1979)
- ML17276B709 + (Dynamic Qualification Rept for Safety-Related Equipment, Vols I & II)
- ML20050C781 + (Dynamic Qualification Rept on Two Valves)
- ML17139B272 + (Dynamic Qualification for Msiv)
- Information Notice 1997-25, Dynamic Range Uncertainties in the Reactor Vessel Level Instrumentation + (Dynamic Range Uncertainties in the Reactor Vessel Level Instrumentation)
- ML20058J445 + (Dynamic Reactor Testing of Fuel-Releasing Elements as Substantiation of Safety of Atomic Power Under Emergency Conditions)
- ML20147H582 + (Dynamic Reserve Margins in a Multi-Degree-of-Freedom Sys. Describes Analysis Method,Assumptions & Reults of Task 2 of EWA:EAG01-49 in Connection W/Justifying Use of Srss for Combining Responses from Two or More Dynamic Loads)
- ML13311A404 + (Dynamic Response of Pressurized Z-Bend Piping Sys Tested Beyond Elastic Limits & W/Support Failures)
- ML19178A191 + (Dynamic Response of Soil Under Multidirectional Loading: Experimental Investigation and Modeling, Vol_1_Illinois_Report_Final)
- ML20211B128 + (Dynamic Rod Worth Measurement Using Casmo/Simulate)
- ML19242C834 + (Dynamic Simulation of LMFBR Sys)
- ML20101A882 + (Dynamic Simulation of the AIR-COOLED Decay Heat Removal Sys of the German KNK-II Experimental Breeder Reactor)
- ML20031F457 + (Dynamic Simulation of the Fast Flux Test Facility Primary System)
- ML20086T972 + (Dynamic Testing of AS-BUILT Civil Engineering Structures - a Review and Evaluation)
- ML20058C757 + (Dynamic Testing of a Circular Foundation and Analyses of Soil/Structure Interaction)
- ML050540464 + (Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants)
- ML050540469 + (Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004)
- ML19344F046 + (Dynamic,Inelastic Buckling Analysis of Mark I Torus Support Columns)
- ML17329A049 + (Dynarack Simulations to Demonstrate Ability to Predict Classical Nonlinear Phenomena)
- ML070470483 + (Dynegy Power Generation Facilities Northeast Segment)
- ML19282B630 + (Dynest,A Dynamic Estimator Calculation Program)
- ML20262G153 + (E C Detector)
- ML20262G130 + (E C Detector)
- 05000263/FIN-2011005-01 + (E Condensate Demineralizer Alarm Response Procedure Limits Exceeded)
- ML14155A157 + (E Draft 2014)
- ML14155A191 + (E Draft Including NRC Resource Comments SR-E)
- ML17062A552 + (E EMRV Failure Slides for Regulatory Conference Meeting Notice for 03/09/17)
- 05000219/FIN-2016004-01 + (E EMRV Failureto Stroke Due to Incorrect Reassembly)
- ML19178A205 + (E Hps MOU Figure 3 as of 100710)
- ML20033F246 + (E Lit & J Raskin Response to Motion to Strike Portions of Intervenors Written Presentations & Brief in Support.* Applicant Motion Should Not Prevail on Basis of Insufficient Argument.W/Supporting Info & Certificate of Svc)
- ML21172A269 + (E Mail Acceptance of Application to Adopt 10 CFR 50.69, _Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (Epid_ L-2021-LLA-0092))
- ML24318C252 + (E Mail Issuance of Plan for EPRI Regulatory Audit of Technical Report 3002028675 Np 3002028674 P LOCA Analysis of FFRD for Westinghouse 2, 3, and 4 Loop Plant EPID L 2024 NTR0003)
- ML14155A160 + (E Rational 2014 Draft)
- 05000263/LER-2013-001, E SRV Low-Low Set Tailpipe Dp Root Valve Found Closed + (E SRV Low-Low Set Tailpipe Dp Root Valve Found Closed)
- ML052060167 + (E- Mail Hobbs, Entergy Nuclear Northeast, to Ennis, NRR, Re VY EPU Steam Dryer Audit)
- ML101720454 + (E- Mail from Amy Powell to Mcdonough, Alexander (Reid); Cristinzio, Dayle (Reid), and Sharon Raborn (Reid) Board Issues Order for Filings in Response to Naruc and Prairie Island (Attachment: ML100750543))
- ML101720456 + (E- Mail from Amy Powell to Mcdonough, Alexander (Reid); Cristinzio, Dayle (Reid), and Sharon Raborn (Reid) NRC Staff Responses to 3 Petitions in Ym Proceeding (Attachments: ML100880539, ML100880570 and ML100880557))
- ML102500099 + (E- Mail from B. Mozafari to E. Katzman and K. Frehafer Acceptance Review for License Amendment Requests)
- ML20216E252 + (E-0038 to Receiving & Testing Procedure for GE Nuclear Returned Disc Assemblies. W/Six Oversize Drawings)
- ML20043F634 + (E-111 Training Material for E-111 Emergency Diesel Generator Course)
- ML17151B033 + (E-1F9900, Rev. 9, Post-Fire Safe Shutdown Operator Manual Actions, Redacted)
- ML17151B036 + (E-1F9905, Rev 8, Fire Hazard Analysis)
- ML22152A193 + (E-1F9905, Revision 11, Fire Hazard Analysis)
- ML17151B039 + (E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation)
- ML23135A204 + (E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation)
- ML22152A200 + (E-1F9915, Revision 15, Design Basis Document for Ofn RP-017, Control Room Evacuation)
- ML16130A355 + (E-2225-4, Sheet Na, Rev 000, 8 Kv Penetration)