Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "E C Detector". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20148N117  + (Dynamic Photoelastic Study of Crack Arrest. Monthly Progress Rept Describes Status of Experiments & Analysis Efforts)
  • ML19225C890  + (Dynamic Photoelastic Study of Crack Arrest, Interim Rept, May 1979)
  • ML20150B583  + (Dynamic Photoelastic Study of Crack Arrest, Monthly Progress Rept)
  • ML19259B818  + (Dynamic Photoelastic Study of Crack Arrest, Monthly Progress Rept)
  • ML19242A201  + (Dynamic Photoelastic Study of Crack Arrest, Progress Rept for Apr 1979)
  • ML19225C558  + (Dynamic Photoelastic Study of Crack Arrest, Progress Rept, June 1979)
  • ML17276B709  + (Dynamic Qualification Rept for Safety-Related Equipment, Vols I & II)
  • ML20050C781  + (Dynamic Qualification Rept on Two Valves)
  • ML17139B272  + (Dynamic Qualification for Msiv)
  • Information Notice 1997-25, Dynamic Range Uncertainties in the Reactor Vessel Level Instrumentation  + (Dynamic Range Uncertainties in the Reactor Vessel Level Instrumentation)
  • ML20058J445  + (Dynamic Reactor Testing of Fuel-Releasing Elements as Substantiation of Safety of Atomic Power Under Emergency Conditions)
  • ML20147H582  + (Dynamic Reserve Margins in a Multi-Degree-of-Freedom Sys. Describes Analysis Method,Assumptions & Reults of Task 2 of EWA:EAG01-49 in Connection W/Justifying Use of Srss for Combining Responses from Two or More Dynamic Loads)
  • ML13311A404  + (Dynamic Response of Pressurized Z-Bend Piping Sys Tested Beyond Elastic Limits & W/Support Failures)
  • ML19178A191  + (Dynamic Response of Soil Under Multidirectional Loading: Experimental Investigation and Modeling, Vol_1_Illinois_Report_Final)
  • ML20211B128  + (Dynamic Rod Worth Measurement Using Casmo/Simulate)
  • ML19242C834  + (Dynamic Simulation of LMFBR Sys)
  • ML20101A882  + (Dynamic Simulation of the AIR-COOLED Decay Heat Removal Sys of the German KNK-II Experimental Breeder Reactor)
  • ML20031F457  + (Dynamic Simulation of the Fast Flux Test Facility Primary System)
  • ML20086T972  + (Dynamic Testing of AS-BUILT Civil Engineering Structures - a Review and Evaluation)
  • ML20058C757  + (Dynamic Testing of a Circular Foundation and Analyses of Soil/Structure Interaction)
  • ML050540464  + (Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants)
  • ML050540469  + (Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004)
  • ML19344F046  + (Dynamic,Inelastic Buckling Analysis of Mark I Torus Support Columns)
  • ML17329A049  + (Dynarack Simulations to Demonstrate Ability to Predict Classical Nonlinear Phenomena)
  • ML070470483  + (Dynegy Power Generation Facilities Northeast Segment)
  • ML19282B630  + (Dynest,A Dynamic Estimator Calculation Program)
  • 05000263/FIN-2011005-01  + (E Condensate Demineralizer Alarm Response Procedure Limits Exceeded)
  • ML14155A157  + (E Draft 2014)
  • ML14155A191  + (E Draft Including NRC Resource Comments SR-E)
  • ML17062A552  + (E EMRV Failure Slides for Regulatory Conference Meeting Notice for 03/09/17)
  • 05000219/FIN-2016004-01  + (E EMRV Failureto Stroke Due to Incorrect Reassembly)
  • ML19178A205  + (E Hps MOU Figure 3 as of 100710)
  • ML20033F246  + (E Lit & J Raskin Response to Motion to Strike Portions of Intervenors Written Presentations & Brief in Support.* Applicant Motion Should Not Prevail on Basis of Insufficient Argument.W/Supporting Info & Certificate of Svc)
  • ML21172A269  + (E Mail Acceptance of Application to Adopt 10 CFR 50.69, _Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (Epid_ L-2021-LLA-0092))
  • ML24318C252  + (E Mail Issuance of Plan for EPRI Regulatory Audit of Technical Report 3002028675 Np 3002028674 P LOCA Analysis of FFRD for Westinghouse 2, 3, and 4 Loop Plant EPID L 2024 NTR0003)
  • ML14155A160  + (E Rational 2014 Draft)
  • 05000263/LER-2013-001, E SRV Low-Low Set Tailpipe Dp Root Valve Found Closed  + (E SRV Low-Low Set Tailpipe Dp Root Valve Found Closed)
  • ML052060167  + (E- Mail Hobbs, Entergy Nuclear Northeast, to Ennis, NRR, Re VY EPU Steam Dryer Audit)
  • ML101720454  + (E- Mail from Amy Powell to Mcdonough, Alexander (Reid); Cristinzio, Dayle (Reid), and Sharon Raborn (Reid) Board Issues Order for Filings in Response to Naruc and Prairie Island (Attachment: ML100750543))
  • ML101720456  + (E- Mail from Amy Powell to Mcdonough, Alexander (Reid); Cristinzio, Dayle (Reid), and Sharon Raborn (Reid) NRC Staff Responses to 3 Petitions in Ym Proceeding (Attachments: ML100880539, ML100880570 and ML100880557))
  • ML102500099  + (E- Mail from B. Mozafari to E. Katzman and K. Frehafer Acceptance Review for License Amendment Requests)
  • ML20216E252  + (E-0038 to Receiving & Testing Procedure for GE Nuclear Returned Disc Assemblies. W/Six Oversize Drawings)
  • ML20043F634  + (E-111 Training Material for E-111 Emergency Diesel Generator Course)
  • ML17151B033  + (E-1F9900, Rev. 9, Post-Fire Safe Shutdown Operator Manual Actions, Redacted)
  • ML17151B036  + (E-1F9905, Rev 8, Fire Hazard Analysis)
  • ML22152A193  + (E-1F9905, Revision 11, Fire Hazard Analysis)
  • ML17151B039  + (E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation)
  • ML23135A204  + (E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation)
  • ML22152A200  + (E-1F9915, Revision 15, Design Basis Document for Ofn RP-017, Control Room Evacuation)
  • ML16130A355  + (E-2225-4, Sheet Na, Rev 000, 8 Kv Penetration)