Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138P559 + (Draft BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area VII Exemptions)
- ML20138P537 + (Draft BNL Comanche Peak Steam Electric Station Technical Review Team Audit Plan for Area VI Nonconformance Reporting)
- ML19231A326 + (Draft BTP)
- ML19240A327 + (Draft BTP 7-19 Revision Presentation- August 29, 2019)
- ML20155K915 + (Draft BTP 7-19 Standard Review Plan)
- ML20106E873 + (Draft BTP 7-19, Revision 8 to Support ACRS Meeting on June 2, 2020)
- ML20237F570 + (Draft BTP 7-19, Revision 8, ACRS_Sept82020)
- ML20134J551 + (Draft BTP, Screening Methodology for Assessing Prior Land Burials of Radwaste Authorixed Under Former 10CFR20.304 & 20.302)
- ML20246Q266 + (Draft BWR Owners Group Containment Testing Committee Standardized Program for Primary Containment Integrity Testing)
- ML20023B133 + (Draft Backup for AEC-592. Info Partially Withheld (Ref FOIA Exemption 6))
- ML120380394 + (Draft Balance of Plant RAIs Related to MUR Dated June 23, 2011)
- ML120200108 + (Draft Balance of Plant RAIs Related to MUR Dated June 23, 2011)
- ML20012G336 + (Draft Basis for Seismic Provisions of UCRL-15910)
- ML14133A090 + (Draft Beaver Valley, Request for Additional Information Related to an Amendment to Adopt TSTF-425)
- ML20236K634 + (Draft Beyond DBAs in Spent Fuel Pools (Generic Issue 82))
- ML19267A050 + (Draft Branch Tech Position 7-19, Revision 8)
- PMNS20200090, Draft Branch Technical Position (BTP) 7-19, Guidance for Evaluation of Diversity and Defense-In-Depth in Digital Computer-Based Instrumentation and Control Systems, Revision 8 - Clarification of Public Comments + (Draft Branch Technical Position (BTP) 7-19, Guidance for Evaluation of Diversity and Defense-In-Depth in Digital Computer-Based Instrumentation and Control Systems, Revision 8 - Clarification of Public Comments)
- PMNS20201086, Draft Branch Technical Position (BTP) 7-19, Guidance for Evaluation of Diversity and Defense-In-Depth in Digital Computer-Based Instrumentation and Control Systems, Revision 8 - Clarification of Nuclear Energy Institute (NEI) Comments + (Draft Branch Technical Position (BTP) 7-19, Guidance for Evaluation of Diversity and Defense-In-Depth in Digital Computer-Based Instrumentation and Control Systems, Revision 8 - Clarification of Nuclear Energy Institute (NEI) Comments)
- ML20293A299 + (Draft Branch Technical Position 7-19, Revision 8 for ACRS October 2020)
- ML20155F355 + (Draft Branch Technical Position on Std Format & Content of License Applications for Near-Surface Disposal of Radwaste)
- ML19219A184 + (Draft Branch Technical Positition 8-8, Onsite and Offsite Power Sources Completion Time Extensions)
- ML20033B951 + (Draft Brief Urging ASLB to Deny Wi Environ Decade Access to Proprietary Version of Wiesemann Affidavit.Decade Failed to Comply w/10CFR9.12 & to Demonstrate Proper & Direct Concern W/Content of Affidavit.Certificate of Svc Encl)
- ML20206A322 + (Draft Bubble Migration in Sensing Lines Sloped at Small Angles)
- ML12331A175 + (Draft Bypass Fiber Quantity Test Plan)
- ML20207S174 + (Draft C to Post-Solidification Project Decommissioning Alternatives Study)
- ML20199E076 + (Draft C,Rev 0 to Guide for Sampling Plans Random Samples)
- ML20206N056 + (Draft C-E Owners Group Restructured STS Front Mater & Use & Applications - Div 1)
- LD-88-005, Draft C-E Sys 80+TM Std Design, Design Certification Licensing Review Bases.Response to NRC Comments on Licensing Document Encl + (Draft C-E Sys 80+TM Std Design, Design Certification Licensing Review Bases.Response to NRC Comments on Licensing Document Encl)
- ML20154K275 + (Draft CNWRA 88-002, Convo Evaluation & Enhancement Plan)
- ML20206F086 + (Draft COBRA-NC Analysis of Station Blackout Transient (Tmlb) for Surry Plant. Inel Viewgraphs Entitled Structural Failure Studies of RCS Also Encl)
- ML060380037 + (Draft COL Application Regulatory Guide, Part 1, Chapter 13, Conduct of Operations)
- ML060760088 + (Draft COL Application Regulatory Guide, Part I, Chapter 2, Site Characteristics)
- ML060230015 + (Draft COL Application Regulatory Guide, Part 1, Chapter 11, Radioactive Waste Management)
- ML060860080 + (Draft COL Application Regulatory Guide, Section C.IV.4, Operational Programs)
- ML060230011 + (Draft COL Application Regulatory Guide, Part 1, Chapter 12, Radiation Protection)
- ML060600355 + (Draft COL Application Regulatory Guide, Part IV.1, Combined License (COL) Application Acceptance Review Checklist)
- ML060410002 + (Draft COL Application Regulatory Guide, Part 1, Chapter 17, Quality Assurance)
- ML060370465 + (Draft COL Application Regulatory Guide, Part 1, Chapter 4, Reactor, Combined License Applications for Nuclear Power Plants (LWR Edition))
- ML091540416 + (Draft COP Position Paper Submitted by E-mail)
- ML20197B518 + (Draft Calculations for Remedial Action Plan & Site Conceptual Design for Inactive U Mill Tailings Site at Spook,Wy. W/One Oversize Drawing)
- ML20033C529 + (Draft Calculations of Reactor Accident Consequences, Version 2)
- ML20107L413 + (Draft Catawba Socket Weld Evaluation)
- ML20101Q321 + (Draft Chapter 3, Development of Overcooling Sequences for Hb Robinson Unit 2 Nuclear Power Plant. to Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant)
- ML20093A344 + (Draft Chapter 4, Thermal-Hydraulic Analysis of Potential Overcooling Transients Occuring at Calvert Cliffs Unit 1 to Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1)
- ML20112H795 + (Draft Chapter 5, Pressurized Thermal Shock Evaluation of Hb Robinson Unit 2 Nuclear Power Plant, Re Probabilistic Fracture Mechanics Analysis of Potential Overcooling Sequences)
- ML20097F991 + (Draft Chapter 6, Pressurized Thermal Shock Integrated Risk for Calvert Cliffs Unit 1 & Potential Mitigation Measures, of Pressurized Thermal Shock Evaluation of Calvert Cliffs Unit 1 Nuclear Power Plant)
- ML20097B192 + (Draft Chemistry Manual Procedure CMP-6)
- ML19220C994 + (Draft Chronology of 790328 Accident Until Core Cooling Restored)
- ML19220C972 + (Draft Chronology of Contacts Between Commissioners,Nrc Staff & Governor of PA Re TMI Accident 790330-31)
- ML18100A045 + (Draft Clarification of Regulatory Paths for Lead Test Assemblies)
- ML20248A316 + (Draft Clarification of Resources Conservation & Recovery Act Hazardous Waste Testing Requirements for Mixed Waste)