Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-92-040, Boston Edison Co 1991 Annual Rept, W/Securities & Exchange Commission Form 10-K & + (Boston Edison Co 1991 Annual Rept, W/Securities & Exchange Commission Form 10-K &)
- BECO-93-056, Boston Edison Co 1992 Annual Rept + (Boston Edison Co 1992 Annual Rept)
- ML20065K265 + (Boston Edison Co 1993 Annual Rept & Corresponding Securities & Exchange Commission Form 10-K for FY93)
- ML20112E225 + (Boston Edison Co Annual Rept,1984)
- ML20205D447 + (Boston Edison Co Master Decommissioning Trust Agreement for Pilgrim Nuclear Power Station)
- ML20235A785 + (Boston Edison Co Nuclear Organization Transition Phase)
- ML20213F263 + (Boston Edison Co Response to Generic Ltr 84-11: Insp of BWR Stainless Steel Piping, Summary Overview)
- ML19259C459 + (Boston Edison Co Supplemental Testimony Re Need for Facility.Testimony Provided by Bh Weiner,Pa Legrow,Dv Bourcier,Aw Barstow,Fc Turner,N Godley & D Hanna.Supporting Documentation Encl)
- ML19225A308 + (Boston Edison Memo in Support of Admission of Expert Opinion Evidence in Proceeding)
- ML19246C002 + (Boston Edison Motion for Extension Until 790709 to Answer Commonwealth of Ma Interrogatories Re Need for Power Issue)
- ML19256B482 + (Boston Edison Motion for Protective Orders & Objections to Commonwealth of Ma Interrogatories 33,34,35(d) & 39-41 Re Need for Power Issue)
- ML19246C021 + (Boston Edison Motion to Take Official Notice of Certain State Statutes Court Decisions of Nh,Ct,Vt & Ri.Certificate of Svc Encl)
- ML20086T224 + (Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment)
- ML20077Q125 + (Boston Edison Requirements for Seismic Analysis for General Electric RPV Shroud Repair Project)
- ML19246B687 + (Boston Edison Response to Ma Ofc of Energy Resources 790523 Petition to Participate as Interested State Agency. Petitioners Participation Is Encouraged & Appropriate as Matter of Policy.Certificate of Svc Encl)
- ML21314A423 + (Boston Scientific Request for Extension of Implementation of Authorized User Training and Proctoring for Yttrium-90 Microsphere Brachytherapy)
- ML21314A422 + (Boston Scientific Request for Extension of AU Training and Proctoring)
- ML100271834 + (Bostrad 7 Insulated Wires Electrical Performance & Flame Resistance Before & After Irradiation)
- ML17255A746 + (Bostrand (7E) Cables,Flame & Radiation Resistant Cables for Nuclear Power Plants)
- ML20210E917 + (Bostrom-Bergen/Meddco Metals Allegations Investigation, Matls Reinsp Program Plan)
- ML20210E774 + (Bostron-Bergen/Meddco Metals Allegations Investigation Interim Rept)
- ML20266D523 + (Bot Electrode Smoke.Sheet 1)
- 05000416/LER-2018-002, Both 208 Containment Air Lock Doors Simultaneously Inoperable + (Both 208 Containment Air Lock Doors Simultaneously Inoperable)
- 05000373/FIN-2015002-01 + (Both Ammonia Detectors Non-Functional on Unit 0 Train A of Control Room Ventilation)
- ENS 51185 + (Both Aux Feedwater Trains Declared Inoperable)
- 05000280/LER-1981-055-03, Both Charging Pump Svc Water Pumps Failed.Caused by Failure of Carbon Steel Cap Screw on One Pump Allowing Impeller to Bind & Shorting Out of Motor Stator Windings of Second Pump + (Both Charging Pump Svc Water Pumps Failed.Caused by Failure of Carbon Steel Cap Screw on One Pump Allowing Impeller to Bind & Shorting Out of Motor Stator Windings of Second Pump)
- 05000336/LER-2009-005, Both Containment Air Lock Doors Open in Mode 1 + (Both Containment Air Lock Doors Open in Mode 1)
- ENS 46254 + (Both Containment Hydrogen Analyzers Out of Service Due to Failed Surveillances)
- ENS 49671 + (Both Control Room Air Conditioning Subsystems Inoperable)
- 05000369/LER-2022-001, Both Control Room Area Chilled Water System Trains Inoperable Due to Human Error + (Both Control Room Area Chilled Water System Trains Inoperable Due to Human Error)
- ENS 40886 + (Both Control Room Ventialtion (Crv) Systems Inoperable.)
- ENS 49276 + (Both Control Room Ventilation Filtration Trains Declared Inoperable)
- ENS 47816 + (Both Control Structure Chillers Declared Inoperable While Switching Power Supplies)
- ENS 46925 + (Both Control Structure Chillers Out of Service)
- ENS 48063 + (Both Diesel Generators Declared Inoperable)
- ENS 53353 + (Both Diesel Generators Inoperable)
- ENS 50411 + (Both Discharge Canal Radiation Monitors Removed from Service for Planned Maintenance)
- ENS 53038 + (Both Divisions of Drywell Vacuum Relief Declared Inoperable)
- ENS 57199 + (Both Divisions of Lpci Inoperable)
- ENS 49661 + (Both Divisions of Primary Containment Oxygen and Hydrogen Atmospheric Monitors Inoperable for Maintenance)
- ENS 46769 + (Both Divisions of Residual Heat Removal Inoperable)
- ENS 45279 + (Both Divisions of Vital Switchgear Inoperable Because Flood Door Found Closed)
- ENS 47368 + (Both Divisions of the Rwcu High Differential Flow Isolation Function Removed from Service)
- ENS 49657 + (Both Doors in Secondary Containment Airlock Opened Concurrently)
- 05000331/LER-2018-002, Both Doors in Secondary Containment Airlock Opened Concurrently + (Both Doors in Secondary Containment Airlock Opened Concurrently)
- 05000331/LER-2015-001, Both Doors in Secondary Containment Airlock Opened Concurrently + (Both Doors in Secondary Containment Airlock Opened Concurrently)
- ENS 51856 + (Both Doors of Secondary Containment Open Simultaneously)
- 05000388/LER-2014-001 + (Both Doors of a Secondary Containment Personnel Airlock Momentarily Open Due to a Personnel Error Resulting in Entry into Secondary Containment Technical Specification Limiting Condition for Operation)
- ENS 44859 + (Both Emergency Diesel Generators Declared Inoperable After Review of Work Boundary Isolation)
- ENS 46934 + (Both Emergency Diesel Generators Declared Inoperable Due to Excess Outside Ambient Air Temperature)