Browse wiki

Jump to navigation Jump to search
{{#Regex_clear:At 11:25 on 10/18/08 it was{{#Regex_clear:At 11:25 on 10/18/08 it was identified that 2-SI-MOV-2867A and 2-SI�MOV-2867B, Boron Injection Tank (BIT) Inlet valves were both inoperable. This resulted In less than 100% of the equivalent to a single operable ECCS train being available (TS 3.5.2.C).</br>2-SI-MOV-2867A was made inoperable on 10/17/08 at 23:26 for troubleshooting. Subsequently 2-SI-MOV-2867B became inoperable on 10/18/08 at 03:26 because its emergency power supply was inoperable for maintenance. At that time TS 3.0.3 was applicable with 13 hours to reach MODE 4 and 37 hours to reach MODE 5.</br>On 10/18/08 at 12:05 2-SI-MOV-2867A was made available and TS 3.0.3 action was cleared. The emergency power supply for 2-SI-MOV-2867B was made operable on 10/18/08 at 13:35.</br>NRC Resident Inspector will be notified. }}RC Resident Inspector will be notified. }}  +
15:25:00, 18 October 2008  +
44,581  +
16:43:00, 18 October 2008  +
15:25:00, 18 October 2008  +
{{#Regex_clear:At 11:25 on 10/18/08 it was{{#Regex_clear:At 11:25 on 10/18/08 it was identified that 2-SI-MOV-2867A and 2-SI�MOV-2867B, Boron Injection Tank (BIT) Inlet valves were both inoperable. This resulted In less than 100% of the equivalent to a single operable ECCS train being available (TS 3.5.2.C).</br>2-SI-MOV-2867A was made inoperable on 10/17/08 at 23:26 for troubleshooting. Subsequently 2-SI-MOV-2867B became inoperable on 10/18/08 at 03:26 because its emergency power supply was inoperable for maintenance. At that time TS 3.0.3 was applicable with 13 hours to reach MODE 4 and 37 hours to reach MODE 5.</br>On 10/18/08 at 12:05 2-SI-MOV-2867A was made available and TS 3.0.3 action was cleared. The emergency power supply for 2-SI-MOV-2867B was made operable on 10/18/08 at 13:35.</br>NRC Resident Inspector will be notified. }}RC Resident Inspector will be notified. }}  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 18 October 2008  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:33:43, 24 September 2017  +
16:43:00, 18 October 2008  +
false  +
false  +
0.0542 d (1.3 hours, 0.00774 weeks, 0.00178 months)  +
15:25:00, 18 October 2008  +
Both Boron Injection Tank Inlet Valves Inoperable.  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +