Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210T896 + (BWR Fuel Assembly Evaluation of Combined Safe Shutdown (SSE) & LOCA Loadings (Amend 3))
- ML20093E173 + (BWR Full Integral Simulation Test (FIST)--Facility Description Report)
- ML20041E473 + (BWR Full Integral Simulation Test (First) Program, Monthly Progress Rept for Jan 1982)
- ML20093B472 + (BWR Full Integral Simulation Test (Fist) Phase I Test Results)
- ML20080J992 + (BWR Full Integral Simulation Test (Fist) Program Test Plan)
- ML20032D822 + (BWR Full Integral Simulation Test (Fist) Program, Monthly Progress Rept for Aug/Sept 1981)
- ML20137R274 + (BWR Full Integral Simulation Test (Fist) Program TRAC-BWR Model Development.Volume 3:Development Assessment for Plant Application)
- ML20052A885 + (BWR Full Integral Simulation Test (Fist) Program, Informal Monthly Progress Rept for Mar 1982)
- ML20137Q832 + (BWR Full Integral Simulation Test (Fist) Program TRAC-BWR Model Development.Volume 1:Numerical Methods)
- ML20054C993 + (BWR Full Integral Simulation Test (Fist) Program, Monthly Ltr for Feb 1982)
- ML20137R287 + (BWR Full Integral Simulation Test (Fist) Program TRAC-BWR Model Development.Volume 2:Models)
- ML20136F587 + (BWR Full Integral Simulation Test (Fist) Phase II Test Results and TRAC-BWR Model Qualification)
- ML20052A899 + (BWR Full Integral Simulation Test (Fist) Program, Monthly Ltr for Mar 1982)
- ML20040F187 + (BWR Full Integral Simulation Test (Fist) Program, Monthly Ltr Rept for Dec 1981)
- ML20040B372 + (BWR Full Integral Simulation Test Program, Monthly Progress Rept,Nov 1981)
- ML050730129 + (BWR Generic Fundamentals Examination Section Answer Sheets)
- ML19263E485 + (BWR LOCA Analysis Capability of WRAP-EM Sys)
- ML20206P294 + (BWR LOCA Licensing Analysis Method)
- ML093000604 + (BWR LOCA Presentation (Redacted))
- ML20052H382 + (BWR LOW Flow Bundle Uncovery Test and Analysis)
- ML20063H342 + (BWR Large Break Simulation TESTS-BWR Blowdown/Emergency Core Cooling Program.Volume 2-Appendices I-N)
- ML20052F125 + (BWR Large Break Simulation TESTS-BWR Blowdown/Emergency Core Cooling Program)
- ML19257C301 + (BWR Licensing Basis Transient, Conference Paper)
- ML19290B964 + (BWR Mark I & Mark II Pressure Suppression Containments)
- ML20086R229 + (BWR Mark II EX-VESSEL Corium Interaction Analyses)
- Information Notice 1996-16, BWR Operation with Indicated Flow Less than Natural Circulation + (BWR Operation with Indicated Flow Less than Natural Circulation)
- ML20245H960 + (BWR Overfill Events Resulting in Steam Line Flooding, AEOD Engineering Evaluation Rept)
- ML16197A272 + (BWR Owner Group - Submittal of Strategic Schedule to Support NEDC-33608-P Review by NRC Staff)
- ML16295A336 + (BWR Owner Group - Withdrawal of NEDC-33608P - Boiling Water Reactor Emergency Core Cooling Suction Strainer In-Vessel Downstream Effects)
- ML013030080 + (BWR Owners Group (Bwrog), Ltr, Implementation of Improved Water Chemistry and Technical Basis for Revised Piping Inspection Schedules)
- ML21089A112 + (BWR Owners Group - Notification of Revision, BWROG TP20-2-112, MPR-2093 Rev. 2 Predicting Capability and Stroke Time in DC Motor-Operated Valves and Supporting Documents (Original BWROG-TP-03-008r3))
- ML17047A645 + (BWR Owners Group - Potential Issues Related to Emergency Core Cooling Systems (ECCS) Strainer Performance at Boiling Water Reactors)
- ML13252A325 + (BWR Owners Group - Request for RCIC Feasibility Study and RCIC Durability Study (Ta 375))
- ML092600272 + (BWR Owners Group - Responses to Supplemental Request for Additional Information (Rais) Dated June 16, 2009 Regarding Licensing Topical Report (LTR) NEDO-33349, Revision 1)
- ML032200359 + (BWR Owners Group Actions in Response to Pipe Ruptures in Non-U.S. BWRs)
- ML023610269 + (BWR Owners Group Actions in Response to Pipe Ruptures in Non-U.S. BWRs)
- ML060940464 + (BWR Owners Group Alternate Source Term High Burn Up BWR Fuel Rod Gap Release Fractions)
- ML003776421 + (BWR Owners Group Appendix R Fire Protection Committee Use of Safety Relief Valves and Low Pressure Systems as Redundant Safe Shutdown Paths, GE Report No. GE-NE-T43-00002-00-03-R01, August 1999)
- ML003696675 + (BWR Owners Group Appendix R Fire Protection Committee Generic Guidance for BWR Post-Fire Safe Shutdown Analysis)
- ML003734575 + (BWR Owners Group Appendix R Fire Protection Committees Response to Actions Requested in Minutes from April 25, 2000 Meeting with Staff on Submittal Related to Use of Safety Relief Valves and Low Pressure Systems as Redundant Safe Shutdown P)
- ML20154C211 + (BWR Owners Group Assessment of ECCS Pressurization in Bwrs)
- ML13256A096 + (BWR Owners Group Communicated Delay of Approximately Six Months in Reviewing BWROG Submittal Associated with NEDC-33608P S2 RAI Responses)
- ML20054F162 + (BWR Owners Group Control Room Survey Workshop Suppl)
- ML003733225 + (BWR Owners Group DC Motor Performance Methodology - Predicting Capability and Stroke Time in DC Motor-Operated Valves)
- ML003758535 + (BWR Owners Group DC Motor Program BWROG Project Number 691)
- ML11335A262 + (BWR Owners Group ECCS Suction Bypass Test Plan)
- ML20002C164 + (BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.13B: Reactor Core Isolation Cooling Sys Automatic Reset)
- ML20217C458 + (BWR Owners Group Evaluation of NUREG-0737 Item II.K.3.24, HPCI & RCIC Sys Environ Capabilities)
- ML20140B095 + (BWR Owners Group Integrated Risk Based Regulations Committee Comments on NUREG-1560, IPE Program:Perspectives on Reactor Safety & Plant Performance)
- ML24271A052 + (BWR Owners Group Introduction & Overview)
- ML043510165 + (BWR Owners Group Licensing Topical Report NEDO-33160, Regulatory Relaxation for the Post Accident SRV Position Indication System, December 2004)