Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22269A414 + (Attachment 7 - LaSalle County Station-Development of Evacuation Time Estimates)
- ML12030A267 + (Attachment 7 - NRC General Counsel Memorandum to the NRC Commissioners Dated January 10, 2012)
- ML22153A183 + (Attachment 7 - Non-Proprietary Version of SBLOCA Summary Report)
- ML22181B137 + (Attachment 7 - Proposed Operating License Changes (Mark-up))
- RS-14-042, Attachment 7 - UHS Calculation LSCS Design Analysis L-002457, Revision 8, Part 2 of 2 + (Attachment 7 - UHS Calculation LSCS Design Analysis L-002457, Revision 8, Part 2 of 2)
- ML14066A176 + (Attachment 7 - UHS Calculation LSCS Design Analysis L-002457, Revision 8, Part 1 of 2)
- RS-14-042, Attachment 7 - UHS Calculation LSCS Design Analysis L-002457, Revision 8, Part 1 of 2 + (Attachment 7 - UHS Calculation LSCS Design Analysis L-002457, Revision 8, Part 1 of 2)
- ML13254A121 + (Attachment 7 - Updated Evacuation Time Estimates for Oyster Creek Nuclear Generating Station Plume Exposure Pathway and ETE Review Criteria Checklist)
- ML021300491 + (Attachment 7 E-mailed on April 30, 2002 (Docket No. 50-298). E-mail from Mohan Thadani Re Draft RAI GL 96-06)
- ML061450154 + (Attachment 7 Request 4 - Level 1 and 2 Vibration Acceptance Criteria Support Documents)
- ML11326A069 + (Attachment 7 to DCL-11-072, PG&E Calculation No. 9000019634, Design Basis Dose Consequences and Recirculation Loop Margin Leakage Rates)
- ML22285A124 + (Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022)
- ML093160585 + (Attachment 7 to Enclosure, Calculation GEN-PI-077, Rev. 0, FHA Analysis Titled, Fuel Handling Accident Dose Analysis - Ast)
- ML12157A180 + (Attachment 7 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment J Labeled GGNS Stormwater Permits)
- ML13275A014 + (Attachment 7 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
- ML023040151 + (Attachment 7 to Safety Evaluation of Amendment No. 149 - Table U - Unused Numbers)
- ML063460121 + (Attachment 7, Amergen Response to the Request for Additional Information Regarding the Oyster Creek Generating Station EAL Revision, EP-OC-1010)
- ML093080159 + (Attachment 7, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2833NP, Revision 0, Mechanical Design Report, Reload BFE1-9 ATRIUM-10 Fuel Assemblies)
- ML102710228 + (Attachment 7, CR-3 Work Request Form Nu 0368426 (Note: Some Information in This Record Was Received by the NRC with Information Already Removed))
- ML023050119 + (Attachment 7, Cooper Nuclear Station, Updated Version of Draft Response to RAIs (MSIV Leakage Path))
- ML021140040 + (Attachment 7, Faxed on March 26, 2002, (Docket Nos. 50-313 and 50-368). Moderate Susceptibility Plants)
- ML052570067 + (Attachment 7, Meeting Summary, Ventilation Systems Amendment)
- L-2010-078, Attachment 7, St. Lucie License Amendment Request Extended Power Uprate, Summary of Regulatory Commitments + (Attachment 7, St. Lucie License Amendment Request Extended Power Uprate, Summary of Regulatory Commitments)
- ML101160207 + (Attachment 7, St. Lucie License Amendment Request Extended Power Uprate, Summary of Regulatory Commitments)
- ML051230038 + (Attachment 7, Steam Dryer Vibration Measurement, Test Specification, GE Report 26A6388, Revision 3, April 20, 2005)
- ML030660369 + (Attachment 7, Transcript)
- ML11257A050 + (Attachment 7, WCAP-17427-NP, Rev. 1, Watts Bar Nuclear Plant Unit 2 Common Q Post Accident Monitoring System Computer Security Assessment, Attachment 8, Application for Withholding Proprietary Information from Public Disclosure and Attachme)
- ML11207A444 + (Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report)
- ML092940552 + (Attachment 7-1 - Resrad Case Run Reports for Revised Country Club Worker Scenario, with Index)
- ML092940553 + (Attachment 7-2 - Excel File Print-Out Showing Dose Calculation Details)
- ML102940557 + (Attachment 7-Declaration of Paul Blanch)
- ML100700509 + (Attachment 7.1 Unconditional Release Survey Form)
- ML18152A934 + (Attachment 7: 0098-0189-CALC-OO1, Revision 1, Palisades Slur Time Delay Calculation)
- ML11307A333 + (Attachment 7: 08-0015-SP-001, Rev 4, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Functional Requirements Specification (Frs), Revision 4 (LAR Reference 28))
- ML19127A272 + (Attachment 7: Affidavit for Withholding Attachments 3 Through 6)
- ML22210A153 + (Attachment 7: Affidavit in Accordance with 10CFR2.390)
- ML13323B201 + (Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report)
- ML14164A069 + (Attachment 7: Discussion of Revision to the Radiological Emergency Plan Annex for Limerick Generating Station. LGS 3-70 Page LGS 3-155)
- RA-14-032, Attachment 7: Discussion of Revision to the Radiological Emergency Plan Annex for Limerick Generating Station. LGS 3-70 Page LGS 3-155 + (Attachment 7: Discussion of Revision to the Radiological Emergency Plan Annex for Limerick Generating Station. LGS 3-70 Page LGS 3-155)
- ML14164A068 + (Attachment 7: Discussion of Revision to the Radiological Emergency Plan Annex for Limerick Generating Station. Cover Through Page LGS 3-69)
- RA-14-032, Attachment 7: Discussion of Revision to the Radiological Emergency Plan Annex for Limerick Generating Station. Cover Through Page LGS 3-69 + (Attachment 7: Discussion of Revision to the Radiological Emergency Plan Annex for Limerick Generating Station. Cover Through Page LGS 3-69)
- ML18213A537 + (Attachment 7: Edward Swakon Expert Report)
- ML18345A143 + (Attachment 7: HI-2177593 HI-STORE Financial Assurance and Project Life Cycle Cost Estimates Rev 1 - Non-Proprietary)
- ML18191B008 + (Attachment 7: HI-2177600, Revision 0, HI-STORE Cis Facility Occupational Dose Calculation)
- ML22249A355 + (Attachment 7: HI-STORM 100 Amendment 16 Certificate of Compliance Appendix B-100U, Changed Pages)
- ML23069A236 + (Attachment 7: HI-STORM 100 Amendment 19 CoC, Appendix B-100U)
- ML20128J300 + (Attachment 7: HI-STORM 100 FSAR Proposed Changed Pages)
- ML19108A067 + (Attachment 7: HI-STORM FW FSAR (Proposed Rev. 5.F), Changed Pages)
- ML22028A379 + (Attachment 7: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance Reorganization Evaluation Form)
- ML13358A366 + (Attachment 7: LaSalle County Station, Unit 1, Responses to Grand Gulf RAI)
- ML22028A192 + (Attachment 7: Proprietary Affidavit for Timothy J. Tate)