Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Attachment 16: Edward Wexler Declaration". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML100850411  + (Attachment 14: Mechanical Drawings for Leading Edge Flowmeter Installation)
  • ML12157A260  + (Attachment 15 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Ford - Attachment a Labeled Groundwater Well Figure)
  • ML13275A013  + (Attachment 15 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
  • ML023050184  + (Attachment 15, ANO-1, 1R17 Findings on CRDM Nozzle 56)
  • ML093140266  + (Attachment 15, Browns Ferry Unit 1 - Technical Specification Change 467, EMF-2950(NP), Revision 0, Extended Power Uptate, LOCA Break Spectrum Analysis Report)
  • ML021140079  + (Attachment 15, E-Mailed on April 22, 2002 (Docket Nos. 50-445 and 50-446). Slides for ZIRLO Meeting)
  • RS-18-146, Attachment 15: FLEX and Cross-tie Training Material  + (Attachment 15: FLEX and Cross-tie Training Material)
  • ML21288A538  + (Attachment 15: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization Evaluation Form)
  • ML18213A550  + (Attachment 15: J.W. Fourqurean Declaration)
  • ML13095A480  + (Attachment 15: Revised Draft SPDES Permit, Indian Point Unit Nos. 2 and 3 (March 1, 2004))
  • ML12212A394  + (Attachment 16 - Declaration of Fred R. Dacimo on Behalf of Entergy Nuclear Operations, Inc., in the Matter of Indian Point, Nuclear Generating Units 2 and 3. Part 3 of 3)
  • ML12212A393  + (Attachment 16 - Declaration of Fred R. Dacimo on Behalf of Entergy Nuclear Operations, Inc., in the Matter of Indian Point, Nuclear Generating Units 2 and 3. Part 2 of 3)
  • ML12212A392  + (Attachment 16 - Declaration of Fred R. Dacimo on Behalf of Entergy Nuclear Operations, Inc., in the Matter of Indian Point, Nuclear Generating Units 2 and 3. Part 1 of 3)
  • ML13095A494  + (Attachment 16 Entergy, 401 Wqc Application (April 2, 2009))
  • ML12170A840  + (Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar)
  • ML12157A261  + (Attachment 16 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Ford - Grand Gulf Nuclear Site Needs List for Hydrology)
  • ML13275A003  + (Attachment 16 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
  • ML023050189  + (Attachment 16, ANO-1, 1R17 Steam Generator Status Report)
  • ML093100119  + (Attachment 16, Browns Ferry Unit 1 -Technical Specification Change 467, 51-9121503-001, Revision 001, Engineering Information Record, Responses to NRC Comments Regarding Proposed Fuel Transition Amendment)
  • ML092940542  + (Attachment 16-1A - Photograph File PW-2V- 137, 1958 Aerial Photo Showing the Plum Brook Stream Mouth and East Sandusky Bay to the North)
  • ML092940543  + (Attachment 16-1B - Photograph File PW-2V-126, 1958 Aerial Photo Showing Eastern End of Sandusky Bay)
  • ML092940544  + (Attachment 16-2A - Photograph File 317, 1971 Aerial Photo Showing Plum Brook from Hull to Cleveland Rd. (Us Route 6) and the Lower Half of the Estuary)
  • ML092940545  + (Attachment 16-2B - Photograph File 353, 1971 Aerial Photo Showing the Plum Brook Estuary Opening Into East Sandusky Bay)
  • ML092940546  + (Attachment 16-3 - Photograph File Sheet 150, 1986 Aerial Photo Showing the Plum Brook Estuary and East Sandusky Bay to the North)
  • ML092940547  + (Attachment 16-4 - Photograph File 2009 Aerial, 2009 Aerial Photo of East Sandusky Bay Showing the Plum Brook Estuary)
  • ML18213A551  + (Attachment 16: Edward Wexler Declaration)
  • ML18360A484  + (Attachment 16: Graph of RPV Water Level)
  • ML21288A539  + (Attachment 16: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix a Reorganization Evaluation Form)
  • ML22331A020  + (Attachment 17 - Affidavit of Kimberly Manzione)
  • ML12069A327  + (Attachment 17 - Ametek Report No. TR-1136, Qualification Documentation Review Package for Ametek Aerospace Gulton-Statham Products Nuclear Qualified Pressure Transmitter Series Enveloping --- Gage Pressure Transmitter Series Pg 3200, Differ)
  • ML21228A219  + (Attachment 17 - CIS-RP-001-01, Revision 1, Geotechnical Data Report HI-STORE CISF Phase 1 Site Characterization)
  • ML13095A485  + (Attachment 17 Letter, New York State Department of Environmental Conservation to Entergy, Denial of Clean Water Act Section 401 Water Quality Certification (April 2, 2010))
  • ML12157A262  + (Attachment 17 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Ford - Attachment E Cs&I Annual Drinking Water Quality Report)
  • ML13275A017  + (Attachment 17 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
  • ML062680455  + (Attachment 17, 0000-0031-9433-IMLTR-SUP1, Rev 0, Interim Methods LTR Supplement for Hope Creek Extended Power Uprate)
  • ML023050192  + (Attachment 17, ANO-1, Request for Additional Information, NRC Bulletin 2002-02)
  • ML11257A053  + (Attachment 17, Document 420A90-NP, Rev. 2, Wincise Functional Specification for Watts Bar Unit 2, and Attachment 18, Application for Withholding Proprietary Information from Public Disclosure)
  • ML053200212  + (Attachment 17, GE-HCGS-EPU, Rev. 2, Margin in GE Analytical Methods Supporting Hope Creek EPU Submittal)
  • ML092940548  + (Attachment 17-1 - Resrad Case Run Reports with Index)
  • ML092940525  + (Attachment 17-2 -Sensitivity Analysis for Plum Brook Drinking Water Pathway Dose Assessment, Figures)
  • ML24260A298  + (Attachment 17: Affidavit in Accordance with 10 CFR 2.390)
  • ML21288A540  + (Attachment 17: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B Reorganization Evaluation Form)
  • ML18360A485  + (Attachment 17: Inconsistencies Between FLEX SE and Choice Letter Assumptions)
  • ML18213A552  + (Attachment 17: James Porter Declaration)
  • ML13221A365  + (Attachment 18 - Figure 19.2.2-1, Revision 1, Isotope Production System High-Level Flow Diagram)
  • ML21228A220  + (Attachment 18 - References for RAI 2-8 - Non-Proprietary)
  • ML12157A263  + (Attachment 18 to GNRO-2012100039, Er Reference - Bechtel. 1986. Bechtel, Radial Wells 1, 3, 5 - Reduction of Multiple Well Test Data (Geotech Calc G-035). Approved July 31, 1986)
  • ML13275A005  + (Attachment 18 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
  • ML053200222  + (Attachment 18, C.D.I. Report No. 05-17, Hydrodynamic Loads on Hope Creek Unit 1 Steam Dryer to 200 Hz, Revision 1)
  • ML062680460  + (Attachment 18, C.D.I. Report No. 06-17, Rev 2, Hydrodynamic Loads on Hope Creek Unit 1 Steam Dryer to 200 Hz)
  • ML023050200  + (Attachment 18, Cooper Nuclear Station, Draft RAI on Supplemental Information Submitted by Nebraska Public Power District, Collapsed Load Method Used for Stress Analysis of Main Steam Line Piping)