Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15246A128 + (Attachment 1-5 Response to 2009 RAIs Through 1-6 Responses to Round 2 RAIs)
- ML102940550 + (Attachment 1-Declaration of Diane M. Teed)
- ML19254C953 + (Attachment 1-Revised Ite for CoC No. 1004, Amendment 16)
- ML23286A152 + (Attachment 10 - 00172-17-11-052-006 - One-Line Diagram Rtnss and Asset Protection (AP) Diesel Generator 480V Switchgear, Rev. B)
- ML17172A199 + (Attachment 10 - 30441R00041, Revision a, Reactor-Based Molybdenum-99 Supply System Project, Critical Heat Flux Testing at the University of Wisconsin Final Report)
- ML15251A385 + (Attachment 10 - ANP-3324NP, Revision 1, Atrium 10XM Fuel Rod Thermal-Mechanical Design for Quad Cities Unit 2 Cycle 24 Representative Fuel Cycle Design - Licensing Report. (Non-Proprietary))
- ML100321336 + (Attachment 10 - Cameron International Corporation, Application for Withholding Proprietary Information from Public Disclosure)
- ML15072A411 + (Attachment 10 - EP-AA-1006, Revised Radiological Emergency Plan Annex Information for Quad Cities Nuclear Station)
- ML12030A268 + (Attachment 10 - Federal Respondents Brief Dated July 14, 2004 Filed in Citizens Action Network V. United States First Circuit, Docket No. 04-1145 (Excerpt))
- ML19092A173 + (Attachment 10 - HI-STORM 100 Amendment 13 Rsi Responses (non-proprietary))
- ML13199A040 + (Attachment 10 - Netco Report NET-332-01, Revision 1, Inspection and Testing of Boral and Fast Start Surveillance Coupons from the LaSalle County Units 1 & 2 Stations)
- ML15348A444 + (Attachment 10 - November 19, 2015, Indian Point Nuclear Generating Unit 3 License Renewal Inspection Report)
- ML22269A416 + (Attachment 10 - Quad Cities Nuclear Power Station-Development of Evacuation Time Estimates)
- ML13254A114 + (Attachment 10 - Updated Evacuation Time Estimates for Three Mile Island Nuclear Station Plume Exposure Pathway and ETE Review Criteria Checklist)
- ML021300474 + (Attachment 10 Faxed on May 2, 2002 (Docket Nos 50-313 and 50-368). Summary of Three April 2002 Conference Calls with Licensee on Reactor Pressure Vessel Head Inspection Plans & Results at Arkansas Unit One, Units 1 & 2)
- ML060900259 + (Attachment 10 Holtec Report HI-2043149 (Non-Proprietary) Boraflex Remedy at Turkey Point for Fpl)
- ML20154Q844 + (Attachment 10 to Calculation ED-Q0281-88139 Re Fuse Program for Stated motor-operated Valve Boards)
- ML093160588 + (Attachment 10 to Enclosure, Calculation GEN-PI-081, Rev. 0, SGTR Analysis Titled, Eab, LPZ, and CR Doses Due to Steam Generator Tube Rupture Accident - Ast)
- ML12157A183 + (Attachment 10 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment P Labeled Thermal Monitoring Procedural Protocols)
- ML13275A020 + (Attachment 10 to NRC Staffs Answer to Riverkeeper, Inc. Consolidated Motion for Leave to File Amended Contention RK-EC-8A, and Amended Contention RK-EC-8A)
- 2CAN090203, Attachment 10, Arkansas Nuclear One, Unit 2, Draft, Supplement to Amendment Request for TS Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process + (Attachment 10, Arkansas Nuclear One, Unit 2, Draft, Supplement to Amendment Request for TS Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process)
- ML051230068 + (Attachment 10, Charge Converter, Junction Box & Signal Conditioning, Test Procedure, GE Report 26A6485, Revision 2, April 22, 2005)
- ML021140101 + (Attachment 10, E-Mailed on April 10, 2002 (Docket Nos. 50-445 and 50-446). Draft RAI Response for LAR 01-008)
- ML052700044 + (Attachment 10, FAQ Log 9/21/05)
- ML052570070 + (Attachment 10, Meeting Summary, Ventilation Systems Amendment)
- ML24100A038 + (Attachment 10: Affidavit)
- ML21223A056 + (Attachment 10: Affidavit in Accordance with 10 CFR 2.390)
- ML23128A313 + (Attachment 10: Affidavit in Accordance with 10CFR2.390)
- ML23006A274 + (Attachment 10: Affidavit of Kimberly Manzione Pursuant to 10 CFR 2.390)
- ML12300A220 + (Attachment 10: BWROG-TP-12-018, Revision 0, Task 3 - Pump Operation at Reduced Npsha Conditions (Cvds Pump))
- ML18213A545 + (Attachment 10: Bill Powers Expert Report)
- ML13323B207 + (Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions)
- RA-14-032, Attachment 10: Discussion of Revision to the Radiological Emergency Plan Annex for Quad Cities Nuclear Power Station, Page QC 3-69 Through End + (Attachment 10: Discussion of Revision to the Radiological Emergency Plan Annex for Quad Cities Nuclear Power Station, Page QC 3-69 Through End)
- ML14164A076 + (Attachment 10: Discussion of Revision to the Radiological Emergency Plan Annex for Quad Cities Nuclear Power Station, Cover Through Page QC 3-68)
- ML18360A478 + (Attachment 10: HEP Evaluation Related to Shutdown Cooling Isolation)
- ML23069A239 + (Attachment 10: HI-STORM 100 Amendment 19 CoC, Appendix B Reorganization Evaluation Form)
- ML22028A382 + (Attachment 10: Holtec International, HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix C Reorganization Evaluation Form)
- ML13308B830 + (Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines)
- DCL-11-104, Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines. + (Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines.)
- ML14105A387 + (Attachment 10: WCAP-17654-NP, Rev. 4, Replacement Steam Dryer Power Ascension Program Description for Extended Power Uprate)
- ML23286A153 + (Attachment 11 - 00172-17-11-052-007 - One-Line Diagram 480V Switchgear in Ecb, Rev. B)
- ML15251A386 + (Attachment 11 - ANP-3293NP, Revision 1, Applicability of Areva BWR Methods to the Dresden and Quad Cities Reactors Operating at Extended Power Uprate. (Non-Proprietary))
- ML19317D400 + (Attachment 11 - Affidavit)
- RA-15-019, Attachment 11 - EP-AA-1009, Revised Radiological Emergency Plan Annex Information for Three Mile Island Station + (Attachment 11 - EP-AA-1009, Revised Radiological Emergency Plan Annex Information for Three Mile Island Station)
- ML100321340 + (Attachment 11 - Exelon Generation Company, LLC Calculation L-003445 Core Thermal Power Uncertainty to Support MUR for LaSalle Unit 2)
- ML22331A014 + (Attachment 11 - HI-2002444Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System)
- ML21004A253 + (Attachment 11 - Holtec International - Affidavit Pursuant to 10 CFR2.390 for Kimberly Manzione)
- ML14357A354 + (Attachment 11 - NSA-TR-SHN-13-05, Revision 1, Shine Physics Validation)
- ML13199A041 + (Attachment 11 - Netco Report NET-300054-01, Revision 0, Inspection and Testing of Fast Start Surveillance Coupons F22-F1 1 from the LaSalle County Unit 2 Station)
- ML15348A445 + (Attachment 11 - November 19, 2015, Indian Point Nuclear Generating Unit 3 License Renewal Inspection Report)
- ML22269A410 + (Attachment 11 - R.E. Ginna Nuclear Power Plant-Development of Evacuation Time Estimates)