Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22061A105 + (4A-3_of_4-Hunter-Duane_Arnold_ASP_Analysis-SLIDES)
- ML22061A104 + (4A-4_of_4-Leech-DAEC_LIC504_for_PFHA_Workshop-SLIDES)
- ML21015A321 + (4B - Life Beyond 80_Cables - Mantey - Final)
- ML22061A103 + (4B-1_of_1-Levitan-Tornado_Loads-SLIDES)
- ML21019A064 + (4C - BeyondNuclear_Presentation-4_electrical-cable)
- ML22061A102 + (4C-1_of_2-Ragon-NID_NRC_Workshop_2022-02-18-SLIDES)
- ML22061A101 + (4C-2_of_2-VanBockern-National_Levee_Database-SLIDES)
- ML21019A352 + (4D - Fifield.SLR2100.Topic4.Electrical and I&C.20210121.F)
- ML22060A006 + (4Q 2021 Performance Summary U3)
- ML22060A007 + (4Q 2021 Performance Summary U4)
- ML23165A249 + (4Q 2022 Performance Summary U4)
- ML21137A287 + (4_AN2-2021-03 Draft Written Exam Comments)
- ML22214A605 + (4_CNS-2022-06 Form 2.3-5 Draft Written Examination Comments (Final))
- ML20042C431 + (4_Pipe Trench and Pit Drawings for WMA-C)
- ML22354A252 + (4_RBS-2022-12 Form 2.3-5 Draft Written Examination Comments (Final))
- ML070390426 + (4th 10 Year ISI, Relief Request RR4-10)
- ML19016A365 + (4th Annual NRC Probabilistic Flood Hazard Assessment (PFHA) Research Workshop)
- ML19086A183 + (4th Annual NRC Probabilistic Flood Hazard Assessment (PFHA) Research Workshop)
- ML19105A633 + (4th Annual NRC Probabilistic Flood Hazard Assessment (PFHA) Research Workshop)
- PMNS20181364, 4th Annual NRC Probabilistic Flood Hazard Assessment (PFHA) Research Workshop + (4th Annual NRC Probabilistic Flood Hazard Assessment (PFHA) Research Workshop)
- ML19156A446 + (4th PFHA Workshop April,2019)
- DCL-2025-500, 4th Quarter 2025 Report on Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) + (4th Quarter 2025 Report on Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP))
- ML25030A373 + (4th Quarter FY2024 Email Update Consultation Between the Osage Nation and the NRC Pertaining to Indianas Request for Agreement)
- NL-07-029, 4th Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan + (4th Ten-Year Interval Inservice Inspection and Containment Inservice Inspection Program Plan)
- ML21217A076 + (4th and Final Set of DOE Responses to NRC Rsi Comments on 2020 DOE Sdf PA)
- ML18193A738 + (5)
- SBK-L-15204, 5 - Clarification of Response to Previous Submittal Related to Applicant/Licensee Action Items for the Inspection and Evaluation Guidelines Pressurized Water Reactor Vessel Internals (MRP-227-A) + (5 - Clarification of Response to Previous Submittal Related to Applicant/Licensee Action Items for the Inspection and Evaluation Guidelines Pressurized Water Reactor Vessel Internals (MRP-227-A))
- ML24067A011 + (5 - EPRI - RG 1.183 MAAP Supporting Analysis Workshop 3)
- ML25016A262 + (5 - Fundamental Applications of Nde_Jml)
- ML21167A161 + (5 - PRA and Risk Insights in 10 CFR 50.59)
- ML24205A020 + (5 - RG 1.59 - Appendix K - Consideration for Applying Guidance to Advanced Reactor and Small Modular Reactors - Stakeholders Meeting 07/24/2024)
- ML25293A455 + (5 - Radionuclide Retention - NRC Review of RES, Scg, & Rwg)
- SBK-L-17103, 5 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program + (5 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program)
- ML25280A089 + (5 - Safety Analysis Methods)
- ML15054A167 + (5 - Soarca Surry Unmitigated Stsbo Source Term)
- ML23150A034 + (5 - Testing)
- ML13197A257 + (5 28 2013 DB Hs Bolts Telecon Summary)
- ML22214A607 + (5 CNS-2022-06 Draft Operating Test)
- ML24240A124 + (5 Certificate of Compliance 1014 A18 Final Appendix D)
- ML101390609 + (5 Draft Assessment of Exponent Report Referenced in DPO Report and Submittal)
- ML22004A196 + (5 Final SER - Renewed CoC 1027)
- ML20364A034 + (5 Form Comments from Riverkeeper Constituents to Commissioner Hanson Regarding the Indian Point License Transfer Application (NRC-2020-0021)- Subject: Fully Adjudicate All Pending Petitions)
- ML20266H724 + (5 Inch Clad Vessel UT Calibration Block. Sheet 1 of 1)
- SBK-L-12123, 5 License Renewal Application + (5 License Renewal Application)
- ML21201A370 + (5 Mackenzie Stevens - Ai Workshop 06292021_MNS1)
- 05000317/LER-1980-041-01, 5 Minutes After Svc,Water Head Tanks Went from Normal Operating Level to Full,Isophase Bus Duct Cooling Low Flow Alarm Received.Caused by Air Compressor Failure Due to Cracked After Cooler Tubes + (5 Minutes After Svc,Water Head Tanks Went from Normal Operating Level to Full,Isophase Bus Duct Cooling Low Flow Alarm Received.Caused by Air Compressor Failure Due to Cracked After Cooler Tubes)
- ML12297A099 + (5 North Anna 2012-301 Draft Sim-IN-Plant JPMs)
- ML23123A108 + (5 Proposed CoC 1014 Amendment 16 Appendix D)
- ML24095A045 + (5 Proposed TS, Appendix D, Certificate of Compliance No. 1014, Renewed Amendment 18)
- ML14111A316 + (5 Response for Additional Information Extended Power Uprate License Amendment Request)
- ML13345A687 + (5 Response to Request for Additional Information Extended Power Uprate License Amendment Request)