Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS A Unit 1 Feedwater suction line break has caused a loss of all Main Feedwater.

Unit 1 has tripped from 100% power.

All Auxiliary Feedwater Pumps are unavailable.

1-FR-H.1, Response to Loss of Secondary Heat Sink, was initiated and has been completed through Step 13.

INITIATING CUE You are requested to continue performance of 1-FR-H.1, beginning at Step 14.

NAPS 2012 NRC EXAM Page: 1 of 14 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Initiate RCS bleed and feed in response to a loss of secondary heat sink (1-FR-H.1).

TASK STANDARDS Given 1-FR-H.1, RCS bleed and feed is initiated by placing PRZR heaters in PTL, manually actuating SI, opening a PRZR PORV and Reactor and PRZR Vent valves.

K/A

REFERENCE:

E05-EA1.1 (4.1/4.0)

ALTERNATE PATH:

Reactor and PRZR Vent valves are opened due to inabiLITy to open BOTH PRZR PORVs (1-FR-H.1, Step 23 RNO).

TASK COMPLETION TIMES Validation Time = 12 minutes Start Time = __________

Actual Time = _______ minutes Stop Time = __________

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 14 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any requiRED communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any requiRED communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 Feedwater suction line break caused a loss of all Main Feedwater.

Unit 1 has tripped from 100% power.

All Auxiliary Feedwater Pumps are unavailable.

1-FR-H.1, Response to Loss of Secondary Heat Sink, was initiated and has been completed up to and including Step 13.

INITIATING CUE You are requested to continue performance of 1-FR-H.1, beginning at Step 14.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

NAPS 2012 NRC EXAM Page: 3 of 14 CONTROL ROOM JPM - (M)

TOOLS AND EQUIPMENT Copy of 1-FR-H.1 signed off up to and including the step checking if a wide-range level in any two steam generators is less than 14%.

PERFORMANCE STEPS START TIME __________

Note: Candidate will read the following procedure caution:

CAUTION: Step 14 through Step 23 must be performed quickly in order to establish RCS heat removal by RCS bleed and feed.

1 VERIFY ALL RCPs - STOPPED YES. Procedure Step 14 SAT [ ] UNSAT [ ]

Standards Operator confirms all RCPs stopped by checking control board breaker LIGHT indication (GREEN LIGHTS - LIT, RED LIGHTS - NOT LIT).

Notes/Comments RCPs were stopped in Procedure Step 2d RNO based on inabiLITy to establish at least 340 gpm AFW flow.

2 PLACE ALL PRZR HEATERS IN PTL. Procedure Step 15 Critical Step SAT [ ] UNSAT [ ]

Standards Operator places all Pressurizer Heater Control Switches (5 total) in PULL-TO-LOCK (PTL).

Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 14 CONTROL ROOM JPM - (M)

3 CHECK SI - ACTUATED _ Two Charging Pumps RUNNING Procedure Step 16 and SI Flow INDICATED NO.

(Alternate path step)

SAT [ ] UNSAT [ ]

Standards

  • Operator observes ONLY one Charging Pump is running and SI flow is NOT indicated, (may also refer to Initial Conditions provided).
  • Operator applies Procedure Step 16 RNO.

Notes/Comments STEP 16 RNO Perform ONE of the following:

4 IF SI was previously actuated AND has been terminated, Procedure Step 16 THEN do the following: RNO a

1) Manually initiate Phase A Isolation.
2) GO TO Step 17.

SAT [ ] UNSAT [ ]

Standards Operator N/As this Procedure RNO Sub-step based on current plant conditions and the JPM Initial Conditions that were provided.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 14 CONTROL ROOM JPM - (M)

5 IF SI was NOT previously actuated, THEN manually actuate Procedure Step 16 SI. RNO b Critical Step SAT [ ] UNSAT [ ]

Standards Operator momentarily places at least one SAFETY INJECTION INITIATE Control Switch to INITIATE.

Notes/Comments Operation of either switch will actuate both trains of Safety injection.

Step 17 VERIFY RCS FEED PATH.

6 Check at least one Charging Pump - RUNNING YES. Procedure Step 17a SAT [ ] UNSAT [ ]

Standards Operator checks Charging pump breaker (RED LIGHT - LIT) and/or current indication and confirms that both 1-CH-P-1A and 1-CH-P-1B are running.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 14 CONTROL ROOM JPM - (M)

7 Check SI emergency alignment: Procedure Step 17b SAT [ ] UNSAT [ ]

Standards Candidate confirms the following valve positions using control board LIGHT indication:

1) 1-CH-MOV-1115B AND 1-CH-MOV-1115D - OPEN (RED LIGHT - LIT)
2) 1-CH-MOV-1115C AND 1-CH-MOV-1115E - CLOSED (GREEN LIGHT - LIT)
3) 1-SI-TV-1884A, 1-SI-TV-1884B, 1-SI-TV-1884C - CLOSED (GREEN LIGHT - LIT)
4) 1-SI-MOV-1867C AND 1-SI-MOV-1867D - OPEN (RED LIGHT - LIT)
5) 1-SI-MOV-1867A AND 1-SI-MOV-1867B - OPEN (RED LIGHT

- LIT)

6) 1-CH-MOV-1289A AND 1-CH-MOV-1289B - CLOSED (GREEN LIGHT - LIT)

Notes/Comments 8 Verify High-Head flow indicated. Procedure Step 17c SAT [ ] UNSAT [ ]

Standards Operator confirms flow indicated on the following:

  • 1-SI-FI-1943
  • 1-SI-FI-1943-1 Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 14 CONTROL ROOM JPM - (M)

9 RESET BOTH TRAINS OF SI. Procedure Step18 SAT [ ] UNSAT [ ]

Standards

  • Operator momentarily placed Safety Injection (Train A) Reset Switch in RESET.
  • Operator momentarily placed Safety Injection (Train B) Reset Switch in RESET.

Notes/Comments Annunciator P-H1, Safety Injection Initiated, will clear as a result of this action.

10 RESET BOTH TRAINS OF PHASE A ISOLATION. Procedure Step 19 SAT [ ] UNSAT [ ]

Standards

  • Operator momentarily placed Phase A isolation (Train A) Reset Switch in RESET.
  • Operator momentarily placed Phase A isolation (Train B) Reset Switch in RESET.

Notes/Comments Annunciator K-H7, Containment Isolation Phase A, will clear as a result of this action.

NAPS 2012 NRC EXAM Page: 8 of 14 CONTROL ROOM JPM - (M)

11 RESET BOTH TRAINS OF PHASE B ISOLATION IF Procedure Step 20 NECESSARY.

SAT [ ] UNSAT [ ]

Standards Operator momentarily depresses both Phase B Isolation Reset Pushbuttons.

OR Verifies Annunciator K-H8, Containment Isolation Phase B - NOT LIT.

Notes/Comments:

CDA has not initiateded and Phase B Isolation has not occurred. The Operator may not Reset Phase B since it is not necessary.

12 VERIFY OUTSIDE INSTRUMENT AIR SUPPLYING Procedure Step 21 CONTAINMENT.

SAT [ ] UNSAT [ ]

Standards Operator confirms Outside Instrument Air supplying CNTMT by verifying the following:

  • 1-IA-TV-102A & 1-IA-TV-102B OPEN (RED LIGHT - LIT)
  • 2-SA-C-1 and 2-IA-C-1 RUNNING (RED LIGHT - LIT)
  • 1-IA-PI-100 and 1-IA-PI-100A indicate >100 psig Notes/Comments NAPS 2012 NRC EXAM Page: 9 of 14 CONTROL ROOM JPM - (M)

Step 22 ESTABLISH RCS BLEED PATH.

13 Check power to PRZR PORV Block Valves - AVAILABLE. Procedure Step 22a SAT [ ] UNSAT [ ]

Standards Operator confirms power is available to the following valves by checking control board LIGHT indication:

  • 1-RC-MOV-1536 (RED LIGHT - LIT)
  • 1-RC-MOV-1535 (RED LIGHT - LIT)

Notes/Comments 14 Check PRZR PORV Block Valves - BOTH OPEN. Procedure Step 22b SAT [ ] UNSAT [ ]

Standards Operator confirms the following valves are open by checking control board LIGHT indication:

  • 1-RC-MOV-1536 (RED LIGHT LIT, GREEN LIGHT NOT LIT)
  • 1-RC-MOV-1535 (RED LIGHT LIT, GREEN LIGHT NOT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 10 of 14 CONTROL ROOM JPM - (M)

15 Open both PRZR PORVs. Procedure Step 22c (Alternate path step)

Critical Step SAT [ ] UNSAT [ ]

Standards 1) Operator places Control Switches for the following valves in OPEN:

  • 1-RC-PCV-1456
  • 1-RC-PCV-1455C AND
2) Operator observes that 1-RC-PCV-1455C failed to open and applies Procedure Step 22c RNO.

Evaluators Valve 1-RC-PCV-1455C will NOT open when NDT protection key Note switch is placed in OPEN per the RNO in the following step.

Notes/Comments 16 Try to open PORVs (1-RC-PCV-1455C) by placing NDT Procedure Step 22c PROTECTION key switch to OPEN. RNO SAT [ ] UNSAT [ ]

Standards Operator obtains key and places NDT PROTECTION Key Switch for 1-RC-PCV-1455C in OPEN.

Notes/Comments Simulator Booth operator will relay the key to the Simulator floor when the Operator calls the Annex (WCC) to request it.

NAPS 2012 NRC EXAM Page: 11 of 14 CONTROL ROOM JPM - (M)

17 VERIFY ADEQUATE RCS BLEED PATH BY VERIFYING Procedure Step 23 THE FOLLOWING VALVES - OPEN.

(Alternate path step)

SAT [ ] UNSAT [ ]

Standards Operator determines position of the following valves by checking control board LIGHT indication:

  • 1-RC-MOV-1536 - OPEN YES
  • 1-RC-MOV-1535 - OPEN YES
  • 1-RC-PCV-1456 - OPEN YES
  • 1-RC-PCV-1455C - OPEN NO AND Applies RNO since 1-RC-PCV-1455C is NOT open.

Notes/Comments 18 Open the following Reactor Vent Valves: Procedure Step 23 RNO a Critical Step SAT [ ] UNSAT [ ]

Standards Candidate places Control Switches for the following valves in OPEN:

1-RC-SOV-101A-2 1-RC-SOV-101B-2 1-RC-SOV-101A-1 1-RC-SOV-101B-1 Notes/Comments: Valve Open = RED LIGHT LIT NAPS 2012 NRC EXAM Page: 12 of 14 CONTROL ROOM JPM - (M)

19 Open the following PRZR Vent Valves: Procedure Step 23 RNO b Critical Step SAT [ ] UNSAT [ ]

Standards Candidate places Control Switches for the following valves in OPEN:

1-RC-SOV-102A-2 1-RC-SOV-102B-2 1-RC-SOV-102A-1 1-RC-SOV-102B-1 Notes/Comments: Valve Open = RED LIGHT LIT 20 Do the following while continuing with Step 24: Procedure Step 23 RNOc SAT [ ] UNSAT [ ]

Performance Assume that another operator will perform the remainder of this Cue(s) procedure.

This completes the JPM.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 13 of 14 CONTROL ROOM JPM - (M)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If RequiRED)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R223 (modified and alternate path)

TASK Initiate RCS bleed and feed in response to a loss of secondary heat sink (1-FR-H.1).

CHECKLIST NOTE: An instructor should be assigned as an extra operator on the floor to silence any unrelated nuisance alarms. Nuisance alarms can also be overridden as part of the IC shoot if desired.

_____ Recall IC # 152.

_____ Verify 1-FW-P-3A is in P-T-L with a tagging sticker on it.

_____ Ensure the following to disable PZR PORV PCV-1455C as follows:

Set PCV455C_OPEN= OFF Set PCV455C_AUTO=OFF Set PCV455C_N2_AUTO=OFF Set PCV455C_N2_OPEN=OFF

_____ Verify malfunction MFW06 inserted.

_____ Verify E-O immediate actions completed..

_____ Place all MFPs, Condensate PPs, LP HDPs, and HP HDPs in P-T-L.

_____ Verify ALL RCPs stopped .

_____ Verify at least 2 steam generators decreased to 14% wide-range level.

When called by candidate, relay the NDT protection key switch to the extra operator on the floor (or if desired, extra operator on the floor can have key in pocket and produce it after candidate calls the Annex).

NAPS 2012 NRC EXAM Page: 14 of 14 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Both Units have been tripped from 100% power due to a loss of all service water pumps.

All service water supply and return headers are intact.

All RCPs have been stopped.

The operating crew is stabilizing the Units using EOP ES-0.1, Reactor Trip Response.

The operating crew is responding to elevated charging pump temperatures.

The Auxiliary Building is in-accessible.

INITIATING CUE You are requested to perform 0-AP-12, Attachment 3, Cooling Charging Pumps with Gravity Flow from Service Water Headers.

NAPS 2012 NRC EXAM Page: 1 of 16 CONTROL ROOM JPM - (N)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Align Service Water to cool Charging Pumps with gravity flow (0-AP-12).

TASK STANDARDS Given a loss of all Service Water Pumps, gravity flow to Charging pumps is established in accordance with 0-AP-12, Attachment 3.

K/A

REFERENCE:

076 - A2.01, (3.5/3.7)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 16 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 16 CONTROL ROOM JPM - (N)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Both Units have been tripped from 100% power due to a loss of all Service Water Pumps.

All Service Water supply and return headers are intact.

All RCPs have been stopped.

The operating crew is stabilizing the Units using EOP ES-0.1, Reactor Trip Response.

The operating crew is responding to elevated charging pump temperatures.

The Auxiliary Building is in-accessible.

INITIATING CUE You are requested to perform 0-AP-12, Attachment 3, Cooling Charging Pumps with Gravity Flow from Service Water Headers.

EVALUATION METHOD NAPS 2012 NRC EXAM Page: 3 of 16 CONTROL ROOM JPM - (N)

Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Copy of 0-AP-12, Attachment 3, to be provided to applicant.

PERFORMANCE STEPS START TIME __________

Note: Candidate will read the following procedure notes:

NOTE: Gravity flow of the Service Water Headers will provide approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of cooling for the running Charging Pumps.

NOTE: Access to the Emergency Switchgear Room and Chiller Rooms is through the back staircase.

1 Secure Service Water flow through the Component Cooling Heat Procedure Step Exchangers. Att. 3 Step 1 Critical Step SAT [ ] UNSAT [ ]

Standards Operator closes the following valves by momentarily depressing the CLOSE pushbutton (see notes):

  • 1-SW-MOV-108A, SW Supply to Component Cooling Hx (GREEN LIGHT LIT)
  • 1-SW-MOV-108B, SW Supply to Component Cooling Hx (GREEN LIGHT LIT)
  • 2-SW-MOV-208A, SW Supply to Component Cooling Hx (GREEN LIGHT LIT)
  • 2-SW-MOV-208B, SW Supply to Component Cooling Hx (GREEN LIGHT LIT).

Notes/Comments A&B valves are in series so it is only critical that at least ONE valve on each Unit is closed (108A or 108B AND 208A or 208B).

NAPS 2012 NRC EXAM Page: 4 of 16 CONTROL ROOM JPM - (N)

2 Ensure Unit 1 Service Water Valves to Recirc Spray Heat Procedure Step Exchangers are closed. Step 2a SAT [ ] UNSAT [ ]

Standards Operator verifies the following valves are closed:

  • 1-SW-MOV-101A, A SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)
  • 1-SW-MOV-101B, A SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)
  • 1-SW-MOV-101C, B SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)
  • 1-SW-MOV-101D, B SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)

Notes/Comments 3 Ensure Unit 1 Service Water Valves to Containment Air Recirc Fans Procedure Step are closed. Att. 3 Step 2b SAT [ ] UNSAT [ ]

Standards Operator verifies the following valves are closed:

  • 1-SW-MOV-110A, Air Recirc Cooling Coils SW Supply Isol (GREEN LIGHT LIT)
  • 1-SW-MOV-110B, Air Recirc Cooling Coils SW Supply Isol (GREEN LIGHT LIT)
  • 1-SW-MOV-114A, Air Recirc Cooling Coils SW Return Isol (GREEN LIGHT LIT)
  • 1-SW-MOV-114B, Air Recirc Cooling Coils SW Return Isol (GREEN LIGHT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 16 CONTROL ROOM JPM - (N)

4 Ensure Unit 1 Service Water Valves to Fuel Pit Coolers are closed. Procedure Step Att. 3 Step 2c SAT [ ] UNSAT [ ]

Standards Operator verifies the following valves are closed:

  • 1-SW-MOV-113A, Fuel Pit Cooler SW Return Isol (GREEN LIGHT LIT)
  • 1-SW-MOV-113B, Fuel Pit Cooler SW Supply Isol (GREEN LIGHT LIT)

Notes/Comments These MOVs are de-energized. Operator may call an operator to close the breakers so he can check its board position.

Booth Operator will close the breakers and call back to report that the breakers are closed.

5 Ensure Auxiliary Service Water Pump MOVs are closed. Procedure Step Att. 3 Step 2d SAT [ ] UNSAT [ ]

Standards Operator verifies the following valves are closed:

  • 1-SW-MOV-115A, Aux SW Pump Disch A Header Isol Valve (GREEN LIGHT LIT)
  • 1-SW-MOV-118, Aux SW Pump Disch Cross Connect Valve (GREEN LIGHT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 16 CONTROL ROOM JPM - (N)

6 Ensure Unit 1 Service Water Spray Bypass valves are closed. Procedure Step Att. 3 Step 2e Critical Step SAT [ ] UNSAT [ ]

Standards Operator closes the following valves by depressing and holding the CLOSE pushbutton:

  • 1-SW-MOV-123A, Header 4 Bypass SW Reservoir Isol (GREEN LIGHT LIT)
  • 1-SW-MOV-123B, Header 3 Bypass SW Reservoir Isol (GREEN LIGHT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 16 CONTROL ROOM JPM - (N)

Evaluators Operator may elect to direct the Unit 2 OATC to perform all of Step 3 of 0-AP-12, Note Attachment 3, rather than directing each individual sub-step, this option is acceptable, and IF used, THEN MARK steps 3a through 3e SAT, AND proceed to step 4.

7 Ensure Unit 2 Service Water Valves to Recirc Spray Heat Procedure Step Exchangers are closed. Att. 3 Step 3a SAT [ ] UNSAT [ ]

Standards Operator directs the Unit 2 OATC to ensure the following valves are closed:

  • 2-SW-MOV-201A, A SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)
  • 2-SW-MOV-201B, A SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)
  • 2-SW-MOV-201C, B SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)
  • 2-SW-MOV-201D, B SW Supply Header To RSHX Isol Valve (GREEN LIGHT LIT)

Notes/Comments Booth operator will respond as the Unit 2 OATC and will report back that action is complete.

NAPS 2012 NRC EXAM Page: 8 of 16 CONTROL ROOM JPM - (N)

8 Ensure Unit 2 Service Water Valves to Containment Air Recirc Fans Procedure Step are closed. Att. 3 Step 3b SAT [ ] UNSAT [ ]

Standards Operator verifies the following valves are closed:

  • 2-SW-MOV-210A, Air Recirc Cooling Coils SW Supply Isol (GREEN LIGHT LIT)
  • 2-SW-MOV-210B, Air Recirc Cooling Coils SW Supply Isol (GREEN LIGHT LIT)
  • 2-SW-MOV-214A, Air Recirc Cooling Coils SW Return Isol (GREEN LIGHT LIT)
  • 2-SW-MOV-214B, Air Recirc Cooling Coils SW Return Isol (GREEN LIGHT LIT)

Notes/Comments Booth operator will respond as the Unit 2 OATC and will report back that action is complete.

9 Ensure Unit 2 Service Water Valves to Fuel Pit Coolers are closed. Procedure Step Att. 3 Step 3c SAT [ ] UNSAT [ ]

Standards Operator verifies the following valves are closed:

  • 2-SW-MOV-213A, Fuel Pit Cooler SW Return Isol (GREEN LIGHT LIT)
  • 2-SW-MOV-213B, Fuel Pit Cooler SW Supply Isol (GREEN LIGHT LIT)

Notes/Comments Booth operator will respond as the Unit 2 OATC and will report back that action is complete.

NAPS 2012 NRC EXAM Page: 9 of 16 CONTROL ROOM JPM - (N)

10 Ensure Service Water Supply from Screen Wash pumps is closed. Procedure Step Att. 3 Step 3d SAT [ ] UNSAT [ ]

Standards Operator verifies 2-SW-MOV-219, Service Water Supply From Screen Wash Pumps is closed. (GREEN LIGHT LIT)

Notes/Comments Booth operator will respond as the Unit 2 OATC and will report back that action is complete.

NAPS 2012 NRC EXAM Page: 10 of 16 CONTROL ROOM JPM - (N)

11 Ensure Unit 2 Service Water Spray Bypass valves are closed. Procedure Step Att. 3 Step 3e Critical Step SAT [ ] UNSAT [ ]

Standards Operator closes the following valves by momentarily depressing the CLOSE pushbutton:

  • 2-SW-MOV-223A, Header 3 Bypass SW Reservoir Isol (GREEN LIGHT LIT)
  • 2-SW-MOV-223B, Header 4 Bypass SW Reservoir Isol (GREEN LIGHT LIT)

Notes/Comments Booth operator will respond as the Unit 2 OATC and will report back that action is complete.

Operator may perform the action since the components are on the U2 SW panel.

12 Establish gravity flow conditions to open Service Water Overboard Procedure Step valves. Att. 3 Step 4a/b/c Critical Step SAT [ ] UNSAT [ ]

Candidate may elect to direct the Safeguards Operator to perform Step 4a, 4b, and 4c of 0-AP-12, Attachment 3, rather than directing each individual sub-step, this option is acceptable.

Standards Another operator is contacted and requested to perform the following local actions:

a) Obtain the Service Water Key Lock Switch key from the Appendix R key locker.

b) In 1-EP-CB-28H, Unit 1 Service Water Logic Cabinet, place the following switches in DEFEAT INTLKS:

  • 1-SW-MOV-120B, Service Water Return Hdr No. 3 to Lake Isol Valve c) In 2-EP-CB-28H Unit 2, Service Water Logic Cabinet, place the following switches in DEFEAT INTLKS:
  • 2-SW-MOV-220B, Service Water Return Hdr No. 3 to Lake Isol Valve Notes/Comments Booth Operator will respond to the request as the Safeguards Operator.

NAPS 2012 NRC EXAM Page: 11 of 16 CONTROL ROOM JPM - (N)

Booth Operator will bring in annunciator K-E/3, SER WTR SYS LOGIC CABS UNITS 1 AND 2 DOOR OPEN.

Booth Operator will DELETE the annunciator and report back that the action is complete.

13 Open Service Water Overboard valves. Procedure Step Att. 3 Step 4d Critical Step SAT [ ] UNSAT [ ]

Standards Operator opens the following valves by momentarily depressing the OPEN pushbutton:

  • 1-SW-MOV-120A, Disch To Circ Water Tunnel (RED LIGHT LIT)
  • 1-SW-MOV-120B, Disch To Circ Water Tunnel (RED LIGHT LIT)
  • 2-SW-MOV-220A, Disch To Circ Water Tunnel (RED LIGHT LIT)
  • 2-SW-MOV-220B, Disch To Circ Water Tunnel (RED LIGHT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 12 of 16 CONTROL ROOM JPM - (N)

14 Open at least ONE Spray Valve on each return header. Procedure Step Att. 3 Step 4e Critical Step SAT [ ] UNSAT [ ]

Standards Operator opens At least ONE following valves by momentarily depressing the OPEN pushbutton:

  • 1-SW-MOV-121B, 1B1 Spray SW Reservoir (RED LIGHT LIT)
  • 1-SW-MOV-122B, 1B2 Spray SW Reservoir (RED LIGHT LIT)

AND Operator opens At least ONE following valves by momentarily depressing the OPEN pushbutton:

  • 1-SW-MOV-121A, 1A1 Spray SW Reservoir (RED LIGHT LIT)
  • 1-SW-MOV-122A, 1A2 Spray SW Reservoir (RED LIGHT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 13 of 16 CONTROL ROOM JPM - (N)

15 Secure ALL Control Room Chillers. Procedure Step Att. 3 Step 5 SAT [ ] UNSAT [ ]

Standards Operator places Control Switches for each one of the following in OFF (GREEN LIGHT LIT).

  • 1-HV-E-4A, Heating and Ventilation Chiller Unit
  • 1-HV-E-4B, Heating and Ventilation Chiller Unit
  • 1-HV-E-4C, Heating and Ventilation Chiller Unit
  • 2-HV-E-4A, Heating and Ventilation Chiller Unit
  • 2-HV-E-4B, Heating and Ventilation Chiller Unit
  • 2-HV-E-4C, Heating and Ventilation Chiller Unit Performance Cues Notes/Comments: Operator will contact an extra operator to start fans outside control room.

Booth Operator will call back to report that all fans are running.

16 Monitor Charging Pump Bearing Temperatures. Procedure Step Att. 3 Step 6 SAT [ ] UNSAT [ ]

Standards Operator acknowledges that respective Units OATCs will monitor Charging Pump temperatures.

Performance Cues The OATC on each unit will monitor Charging Pump Bearing Temperatures.

Notes/Comments NAPS 2012 NRC EXAM Page: 14 of 16 CONTROL ROOM JPM - (N)

17 Return key to locker. Procedure Step Att. 3 Step 7 SAT [ ] UNSAT [ ]

Standards An Operator is contacted and requested to return the Service Water Key Lock Switch key to the Appendix R key locker Notes/Comments Booth operator will respond as the Safeguards Operator and will report back that action is complete.

18 Return to procedure Step 20. Procedure Step Att. 3 Step 8 SAT [ ] UNSAT [ ]

Standards Operator reports to SRO that 0-AP-12, Attachment 3, directs returning to procedure Step 20.

Performance Cues Acknowledge requirement to return to procedure step 20 and inform candidate that this completes the JPM.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 15 of 16 CONTROL ROOM JPM - (N)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

TASK Align Service Water to cool Charging Pumps with gravity flow (0-AP-12).

CHECKLIST

_____ Recall IC 156

_____ Ensure all SW pumps are tripped on overcurrent.

_____ Ensure all RCPs are stopped.

_____ Ensure AFW throttled.

_____ Ensure SWMOV113A_RACKIN and SWMOV113B_RACKIN are on a Trigger(s).

_____ Ensure Annunciator K/E-3 Override ON is on a Trigger.

_____ Ensure SWMOV120A/B and 220A/B INTERLOCK DEFEAT is on a Trigger(s).

NAPS 2012 NRC EXAM Page: 16 of 16 CONTROL ROOM JPM - (N)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 was manually tripped from 100% power due to excessive RCS leakage.

The crew has manually initiated Safety Injection.

1-E-0, Reactor Trip or Safety Injection, is in progress.

INITIATING CUE You are requested to perform Attachments 4 and 5 of 1-E-0, Reactor Trip or Safety Injection.

NAPS 2012 NRC EXAM Page: 1 of 13 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Perform Attachments 4 and 5 of 1-E-0, Reactor Trip or Safety Injection.

TASK STANDARDS All components which have failed to automatically align to their required position are manually aligned per the applicable attachments.

K/A

REFERENCE:

013 A4.01 (4.5 / 4.8)

ALTERNATE PATH:

Nine (9) components have failed to actuate and must be manually aligned by the operator to place them in their required accident position for safety function.

TASK COMPLETION TIMES Validation Time = 17 minutes Start Time = __________

Actual Time = _______ minutes Stop Time = __________

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Operator (Print)

Evaluator (Print)

Evaluator's Signature /

Date NAPS 2012 NRC EXAM Page: 2 of 13 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE OPERATOR Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 was manually tripped from 100% power due to excessive RCS leakage.

The crew has manually initiated Safety Injection.

1-E-0, Reactor Trip or Safety Injection, is in progress.

INITIATING CUE You are requested to perform Attachments 4 and 5 of 1-E-0, Reactor Trip or Safety Injection.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

NAPS 2012 NRC EXAM Page: 3 of 13 CONTROL ROOM JPM - (M)

TOOLS AND EQUIPMENT Copy of 1-E-0, Attachments 4 & 5 PERFORMANCE STEPS START TIME __________

1 VERIFY Feedwater Isolation NO. Procedure Step Att. 4 Step 1 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator verifies/establishes required alignment.

Main Feed Reg Valves - CLOSED (GREEN LIGHT LIT) [YES]

Main Feed Reg Bypass Valves - CLOSED (GREEN LIGHT LIT)

[YES]

Main Feed MOVs - CLOSED (GREEN LIGHT LIT)

[NO - Operator observes that 1-FW-MOV-154C is OPEN (RED LIGHT LIT) and momentarily depresses the CLOSE pushbutton]

Place Standby Main Feed Pumps in PTL [Operator places control switches 1-FW-P-1B1 & 1B2 in PTL]

Main Feed Pumps - TRIPPED [YES]

Main Feed Pump Discharge MOVs - CLOSED (GREEN LIGHT LIT) [YES]

Steam Generator Blowdown Trip Valves - CLOSED (GREEN LIGHT LIT) [YES]

Performance When the Fire Panel goes into alarm, as the SRO inform the Cue(s) Operator that another Operator will address the Fire Alarm Panel annunciators.

Notes/Comments: ONLY those items shown in BOLD type are critical to this element.

NAPS 2012 NRC EXAM Page: 4 of 13 CONTROL ROOM JPM - (M)

2 Verify phase A Isolation. Procedure Step Att. 4 Step 2 SAT [ ] UNSAT [ ]

Standards

  • Operator momentarily places either, (or both), Phase A Isolation switch in INITIATE.
  • Operator initiates Attachment 5.

Notes/Comments: Since Operator is performing this task reader-doer, they may place-keep and finish Attachment 4, prior to initiating Attachment 5.

(Attachment 5 begins on Page 9 of JPM).

3 Verify AFW Pumps - RUNNING NO. Procedure Step Att. 4 Step 3 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator verifies/establishes required alignment.

Motor-Driven AFW Pumps - RUNNING (RED LIGHT LIT)

[NO - Operator momentarily places control switch for 1-FW-P-3B in START]

Turbine-Driven AFW Pump - RUNNING (RED LIGHT LIT) [YES]

Notes/Comments: ONLY those items shown in BOLD type are critical to this element.

NAPS 2012 NRC EXAM Page: 5 of 13 CONTROL ROOM JPM - (M)

4 Verify SI Pumps - RUNNING NO. Procedure Step Att. 4 Step 4 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator verifies/establishes required alignment.

Two Charging Pumps - RUNNING(RED LIGHT LIT) [YES]

Both Low-Head SI Pumps - RUNNING(RED LIGHT LIT)

[NO - Operator momentarily places control switch for 1-SI-P-1B in START]

Notes/Comments: ONLY those items shown in BOLD type are critical to this element.

5 Verify Four Service Water Pumps - RUNNING NO. Procedure Step Att. 4 Step 5 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator momentarily places control switch for 1-SW-P-1A in START.

(RED LIGHT LIT)

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 13 CONTROL ROOM JPM - (M)

6 Check if Main Steam Lines Should be Isolated: NO. Procedure Step Att. 4 Step 6a (Alternate Path Step)

SAT [ ] UNSAT [ ]

Standards Operator goes to Step 8 per the RNO based on the following conditions:

Annunciator Panel D E LIT [NO]

Containment Pressure - HAS EXCEEDED 18 PSIA [NO]

Notes/Comments 7 VERIFY DILUTION PATH ISOLATED. Procedure Step Att. 4 Step 8 SAT [ ] UNSAT [ ]

Standards Operator dispatches Auxiliary Building Operator to close and lock 1-CH-217, PG to Blender Isolation Valve.

Operator initiates 1-LOG-2A, RCS Makeup Log for Modes 3, 4, 5 and 6 (see Performance Cue).

Performance As the SRO inform the Operator that you will have the OATC Cue(s) initiate 1-LOG-2A.

Notes/Comments: Booth operator will acknowledge order to close and lock 1-CH-217 and report back when action complete.

NAPS 2012 NRC EXAM Page: 7 of 13 CONTROL ROOM JPM - (M)

8 Return this Attachment to SRO for Continued Monitoring. Procedure Step Att. 4 Step 9 SAT [ ] UNSAT [ ]

Standards Operator returns attachment 4 to SRO (see performance cue).

Performance As the SRO acknowledge Operator WHEN Attachment 4 is Cue(s) returned.

Notes/Comments 9 Verify Charging Pump Valve Alignment: NO. Procedure Step Att. 5 Step 1 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator verifies/establishes required alignment.

1-CH-MOV-1115B - OPEN (RED LIGHT LIT)

[NO - Operator momentarily places control switch for 1-CH-MOV-1115B in OPEN (RED LIGHT LIT)]

1-CH-MOV-1115D - OPEN (RED LIGHT LIT) [YES]

1-CH-MOV-1115C - CLOSED (GREEN LIGHT LIT) [YES]

1-CH-MOV-1115E - CLOSED (GREEN LIGHT LIT) [YES] **

1-CH-MOV-1289A - CLOSED (GREEN LIGHT LIT) [YES]

1-CH-MOV-1289B - CLOSED (GREEN LIGHT LIT) [YES]

Notes/Comments: ONLY those items shown in BOLD type are critical to this element.

    • This valve is interlocked with 1115B and initially it will not be in the correct position. Once 1115B is OPEN (RED LIGHT LIT) in the proceeding step, the interlock is satisfied and 1115E will re-position automatically.

NAPS 2012 NRC EXAM Page: 8 of 13 CONTROL ROOM JPM - (M)

10 Verify Letdown Isolation. Procedure Step Att. 5 Step 2 SAT [ ] UNSAT [ ]

Standards Operator verifies the following alignment:

1-CH-HCV-1200A - CLOSED (GREEN LIGHT LIT) [YES]

1-CH-HCV-1200B - CLOSED (GREEN LIGHT LIT) [YES]

1-CH-HCV-1200C - CLOSED (GREEN LIGHT LIT) [YES]

1-CH-LCV-1460A - CLOSED (GREEN LIGHT LIT) [YES]**

1-CH-LCV-1460B - CLOSED (GREEN LIGHT LIT) [YES]**

Notes/Comments

    • These valves do not receive a Phase A Isolation signal, however they would be manually CLOSED (GREEN LIGHT LIT) by 1-AP-16 in response to excessive RCS leakage, and are therefore CLOSED (GREEN LIGHT LIT) as part of the Initial Conditions of this JPM.

11 Verify Low-Head SI Alignment: Procedure Step Att. 5 Step 3 SAT [ ] UNSAT [ ]

Standards Operator verifies the following alignment:

1-SI-MOV-1864A - OPEN (RED LIGHT LIT) [YES]

1-SI-MOV-1864B - OPEN (RED LIGHT LIT) [YES]

1-SI-MOV-1890C - OPEN (RED LIGHT LIT) [YES]

1-SI-MOV-1890D - OPEN (RED LIGHT LIT) [YES]

Notes/Comments NAPS 2012 NRC EXAM Page: 9 of 13 CONTROL ROOM JPM - (M)

12 Align MSR Vents to Main Condenser: Procedure Step Att. 5 Step 4 SAT [ ] UNSAT [ ]

Standards Operator OPEN (RED LIGHT LIT) Operator closes the following MSR st the following MSR Vent to Vent to 1 Pt Htr valves by Condenser valves by momentarily momentarily depressing the OPEN depressing the OPEN (RED (RED LIGHT LIT) pushbutton for LIGHT LIT) pushbutton for each each valve.

valve.

1-SV-TV-100A 1-SV-TV-101A 1-SV-TV-100B 1-SV-TV-101B 1-SV-TV-100C 1-SV-TV-101C 1-SV-TV-100D 1-SV-TV-101D Notes/Comments 13 Verify Adequate HP Turbine Gland Steam Pressure on Procedure Step 1-MS-PI-131. Att. 5 Step 5 SAT [ ] UNSAT [ ]

Standards Operator confirms 1-MS-PI-131 reading between 1.5 and 5 psig.

Notes/Comments NAPS 2012 NRC EXAM Page: 10 of 13 CONTROL ROOM JPM - (M)

14 Check condensate Pump Status: Procedure Step Att. 5 Step 6 SAT [ ] UNSAT [ ]

Standards Operator determines Condensate System is in-service:

Any Condensate - RUNNING (RED LIGHT LIT) [YES]

Operator OPENS (RED LIGHT LIT) ONE of the following Feed Pump Recirc Valves by placing control switch in OPEN (RED LIGHT LIT):

1-FW-FCV-150A OR 1-FW-FCV-150B OR 1-FW-FCV-150C.

Notes/Comments 15 Verify the Following Automatic Operations on the H Procedure Step Safeguards Panel: Att. 5 Step 7 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator performs the following operations:

Momentarily depress OPEN (RED LIGHT LIT) pushbutton for 1-SI-MOV-1867A.

Momentarily depress OPEN (RED LIGHT LIT) pushbutton for 1-SW-MOV-122A.

Momentarily depress CLOSE (GREEN LIGHT LIT) pushbutton for 1-RM-TV-100A.

Notes/Comments NAPS 2012 NRC EXAM Page: 11 of 13 CONTROL ROOM JPM - (M)

16 Verify the Following Automatic Operations on the J Procedure Step Safeguards Panel: Att. 5 Step 8 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator performs the following operations:

Momentarily depress CLOSE pushbutton for 1-CH-TV-1204B (GREEN LIGHT LIT).

Notes/Comments 17 Verify the Following Valves on the Post-Accident Monitoring Procedure Step Panel - CLOSED (GREEN LIGHT LIT): Att. 5 Step 9 SAT [ ] UNSAT [ ]

Standards Operator verifies the following:

1-DA-TV-103B - CLOSED (GREEN LIGHT LIT) 1-DA-TV-103A - CLOSED (GREEN LIGHT LIT)

Performance Assume that another operator will perform the remainder of this Cue(s) attachment.

This completes the JPM.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 12 of 13 CONTROL ROOM JPM - (M)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R727(modified) - alternate path TASK Perform Attachments 4 and 5 of 1-E-0, Reactor Trip or Safety Injection.

CHECKLIST NOTE: An instructor should be assigned as an extra operator on the floor to silence any unrelated nuisance alarms. Nuisance alarms can also be overridden as part of the IC shoot if desired.

_____ Recall IC #154

_____ Verify the following:

bat valveora batch file used to initiate valve malfunctions.

_____ Override AUTO=OFF on the following pump control switches:

1-SI-P-1B 1-SW-P-1A 1-FW-P-3A

_____ Malfunction RC04 (RCS pressure boundary leakage 0-600 gpm) set at 70% severity.

_____ Ensure 1200B and 1460A & B are CLOSED (GREEN LIGHT LIT).

_____ Reactor is tripped & Turbine is tripped AND Reheaters are RESET.

_____ SI manually initiated.

_____ Unrelated alarms overridden off.

_____ AFW throttled.

_____ Simulator in FREEZE As Aux Bldg Operator, acknowledge order to close and lock 1-CH-217 and report back action complete after approximately 3 minutes.

NAPS 2012 NRC EXAM Page: 13 of 13 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS "C" loop T\Tave Channel (T-1432) failed on the previous shift.

All applicable steps of 1-AP-3, Loss of Vital Instrumentation, have been completed.

Section 5.1 of 1-MOP-55.74, T/TAVE Protection Instrumentation, has been completed.

INITIATING CUE You are requested to perform 1-MOP-55.74, Sub-section 5.4, Placing "C" Loop T\TAVE (T-1432) in Test, up to, and including sub-step 5.4.6.

NAPS 2012 NRC EXAM Page: 1 of 11 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Defeat a failed loop T/Tave channel in accordance with 1-MOP-55.74.

TASK STANDARDS "C" loop delta T/TAVE channel is defeated and all affected systems (rod control, PRZR level control, and Steam Dumps) are restored to automatic operation.

K/A

REFERENCE:

012-A2.03 (3.4/3.7)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Operator (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 11 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE OPERATOR Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS "C" loop T\Tave Channel (T-1432) failed on the previous shift.

All applicable steps of 1-AP-3, Loss of Vital Instrumentation, have been completed.

Section 5.1 of 1-MOP-55.74, T/TAVE Protection Instrumentation, has been completed.

INITIATING CUE You are requested to perform 1-MOP-55.74, Sub-section 5.4, Placing "C" Loop T\TAVE (T-1432) in Test, up to, and including sub-step 6.

EVALUATION METHOD NAPS 2012 NRC EXAM Page: 3 of 11 CONTROL ROOM JPM - (M)

Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

1 Verify Initial Conditions are satisfied. Procedure Step 5.4.1 SAT [ ] UNSAT [ ]

Standards Operator signs of this step based on the Initial Conditions provided.

Notes/Comments 2 Review precautions and limitations. Procedure Step 5.4.2 SAT [ ] UNSAT [ ]

Standards Precautions and Limitations have been reviewed.

Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 11 CONTROL ROOM JPM - (M)

Note Operator will read the following procedure cautions:

CAUTION IF one of the coincident channel annunciators is LIT, THEN the following apply:

  • Placing this channel in TEST could trip the unit.
  • IF placing this channel in TEST would cause a unit trip, THEN comply with the following:
    • The channel must NOT be placed in TEST.

3 IF Tave is greater than 554°F, THEN verify coincident channels Procedure Step 5.4.3 are not tripped by verifying the following annunciators are NOT LIT:

SAT [ ] UNSAT [ ]

Standards The following annunciators are checked and confirmed - NOT LIT.

Panel L E-5, RC LOOP 1A LO TAVG CHNL I Panel L E-6, RC LOOP 1B LO TAVG CHNL II Notes/Comments 4 IF Tave is greater than 543° F or the trip function for P-12 is not Procedure Step 5.4.4 blocked, THEN verify coincident channels are not tripped by verifying the following annunciators are NOT LIT:

SAT [ ] UNSAT [ ]

Standards The following annunciators are checked and confirmed - NOT LIT.

Panel L F-5, RC LOOP 1A LO-LO TAVG CHNL I Panel L F-6, RC LOOP 1B LO-LO TAVG CHNL II Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 11 CONTROL ROOM JPM - (M)

5 Verify coincident channels are not tripped by verifying the Procedure Step 5.4.5 following annunciators are NOT LIT:

SAT [ ] UNSAT [ ]

Standards The following annunciators are checked and confirmed - NOT LIT.

Panel M E-1, RC LOOP 1A OVRTEMP T CHNL I Panel M E-2, RC LOOP 1B OVRTEMP T CHNL II Panel M D-1, RC LOOP 1A OVRTEMP T C-3 INTLK Panel M D-2, RC LOOP 1B OVRTEMP T C-3 INTLK Panel M F-1, RC LOOP 1A OVRPWR T C-4 INTLK Panel M F-2, RC LOOP 1B OVRPWR T C-4 INTLK Panel M G-1, RC LOOP 1A OVRPWR T CHNL I Panel M G-2, RC LOOP 1B OVRPWR T CHNL II Notes/Comments 6 Ensure LOOP T/T SET POINT RECORDER SELECTOR 1/1 Procedure Step 5.4.6a TR-412 is NOT monitoring LOOP 3.

SAT [ ] UNSAT [ ]

Standards Operator places selector switch for recorder TR-412 to Loop 2 or Loop 1 position.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 11 CONTROL ROOM JPM - (M)

7 Ensure Control Rod Mode Selector switch is in MANUAL. Procedure Step 5.4.6b Critical Step SAT [ ] UNSAT [ ]

Standards Control Rod Mode Selector Switch is placed in MANUAL.

Notes/Comments This action is required to prevent an undesired transient when the failed channel is selected out in subsequent step.

Note Operator will read the following procedure note:

NOTE: If Charging will be in manual control for a substantial amount of time, then the 1-RC-LCV-1459G controller should be placed in manual, as directed by SRO.

8 Ensure PRZR level control is in manual control by doing the Procedure Step 5.4.6c following, as directed by SRO. Mark any step not performed N/A:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator momentarily depresses the MANUAL pushbutton on 1-CH-FCV-1122.

Performance When asked, as the SRO, tell the Operator that you desire Cue(s) 1-CH-FCV-1122 controller in MANUAL.

Notes/Comments This action is required to prevent an undesired transient when the failed channel is selected out in subsequent step.

NAPS 2012 NRC EXAM Page: 7 of 11 CONTROL ROOM JPM - (M)

9 IF Steam Dumps are in Tave Mode, THEN do one of the Procedure Step 5.4.6d following to place Steam Dumps in OFF or Steam Pressure Mode, as directed by SRO. Mark any step not performed N/A:

SAT [ ] UNSAT [ ]

Standards Operator places both STEAM DUMP INTLK switches to OFF/RESET.

Performance When asked, as the SRO, tell the Operator that you desire Steam Cue(s) Dumps in OFF.

Notes/Comments 10 Ensure 1/1TM-1409A DELTA T DEFEAT SWITCH is in DEFEAT Procedure Step 5.4.6e LOOP C.

Critical Step SAT [ ] UNSAT [ ]

Standards Operator places DELTA T DEFEAT SWITCH in DEFEAT LOOP C (position 4).

Notes/Comments NAPS 2012 NRC EXAM Page: 8 of 11 CONTROL ROOM JPM - (M)

11 Ensure 1/1TM-1408A T-AVE DEFEAT SWITCH is in DEFEAT Procedure Step 5.4.6f LOOP C.

Critical Step SAT [ ] UNSAT [ ]

Standards Operator places T-AVE DEFEAT SWITCH in DEFEAT LOOP C (position 4).

Notes/Comments 12 Place Control Rod Mode Selector switch is in AUTO. Procedure Step 5.4.6g Critical Step SAT [ ] UNSAT [ ]

Standards Operator places Control Rod Mode Selector switch in AUTO.

Notes/Comments NAPS 2012 NRC EXAM Page: 9 of 11 CONTROL ROOM JPM - (M)

13 Place PRZR level control in auto by doing the following: Procedure Step 5.4.6h Critical Step SAT [ ] UNSAT [ ]

Standards 1. Operator verifies the PRZR level is on program.

2. Operator checks 1-RC-LCV-1459G AUTO light is LIT.
3. Operator momentarily depresses the AUTO pushbutton for 1-CH-FCV-1122.

ONLY item 3 of this element is critical; the other items require no operator action and will be satisfied by the current plant conditions.

Notes/Comments 14 Do one of the following with Unit SRO concurrence to restore Procedure Step 5.4.6i Steam Dumps. Mark step not performed N/A:

Critical Step SAT [ ] UNSAT [ ]

Standards (a) Operator verifies that both STEAM DUMP INTLK switches are in OFF/RESET.

(b) Operator verifies P-E4 is NOT LIT and N/As this sub-step.

(c) Operator verifies MODE SELECTOR switch is in TAVE.

(d) Operator verifies that steam demand is ZERO.

(e) Operator places both STEAM DUMP INTLK switches to ON.

ONLY item (e) of this element is critical; the other items require no operator action and will be satisfied by the current plant conditions.

Performance When asked, as the SRO, tell the Operator that you desire Steam Cue(s) Dumps in Tave Mode.

Notes/Comments If the Operator continues with Step 5.4.7, state that another Operator will continue with the task. The JPM is terminated at this point.

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 10 of 11 CONTROL ROOM JPM - (M)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R483 (modified)

TASK Defeat a failed loop T/Tave channel in accordance with 1-MOP-55.74.

CHECKLIST Recall IC155 (100% power)

Ensure recorder TR-412 is selected to Loop 3.

Verify C loop T-1432 channel failed in the high direction.

RC1703 RTD FAIL HI-LO HOT LEG C NAPS 2012 NRC EXAM Page: 11 of 11 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit 1 is in Mode 5 following refueling.

1-RC-P-1C is in operation.

The plant is solid.

RCS pressure is stable at approximately 323# (ordered band is 300 to 350 psig).

RCS Temperature is stable at approximately 138°F (ordered band is 130°F - 150°F) .

INITIATING CUE You are requested to maintain stable plant conditions.

NAPS 2012 NRC EXAM Page: 1 of 11 CONTROL ROOM JPM - (N)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Terminate spurious SI in accordance with 1-AP-0.1.

TASK STANDARDS Running RCP (1-RC-P-1C) is stopped AND SI flow is terminated within 10 minutes from time of actuation.

K/A

REFERENCE:

006 A2.13 (3.9 / 4.2)

ALTERNATE PATH:

The BIT inlet valve 1-SI-MOV-1867B will fail to close from the control room. The Operator will have to dispatch Operations personnel to locally close the valve in order to terminate SI flow.

TASK COMPLETION TIMES Validation Time = 10 minutes Start Time = __________

Actual Time = _______ minutes Stop Time = __________

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Operator (Print)

Evaluator (Print)

Evaluator's Signature /

Date NAPS 2012 NRC EXAM Page: 2 of 11 CONTROL ROOM JPM - (N)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE OPERATOR Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 is in Mode 5 following refueling.

1-RC-P-1C is in operation.

The plant is solid.

RCS pressure is stable at approximately 323# (ordered band is 300 to 350 psig).

RCS Temperature is stable at approximately 138°F (ordered band is 130°F - 150°F) .

INITIATING CUE You are requested to maintain stable plant conditions.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

NAPS 2012 NRC EXAM Page: 3 of 11 CONTROL ROOM JPM - (N)

TOOLS AND EQUIPMENT Copy of 1-AP-0.1 may be provided once the procedure entrance/applicability is stated, or operator will obtain a controlled copy from bookshelf or cabinet . (discretion of evaluator)

PERFORMANCE STEPS START TIME __________

1 STOP ALL RCPs. Procedure Step 1 Critical Step SAT [ ] UNSAT [ ]

Standards Operator momentarily places control switch for 1-RC-P-1C in STOP.

Notes/Comments Step 1 should be performed from memory since this is an Immediate Operator Action step.

NAPS 2012 NRC EXAM Page: 4 of 11 CONTROL ROOM JPM - (N)

2 RESET BOTH TRAINS OF SI AFTER 60 SECOND TIME Procedure Step 2 DELAY.

Critical Step SAT [ ] UNSAT [ ]

Standards Operator momentarily places BOTH SI Reset switches in RESET.

Notes/Comments Operator should note the change in status windows. (P- H1 will clear and P-H2 will illuminate upon successful reset of BOTH trains of SI.)

3 CHECK ONLY ONE CHARGING PUMP RUNNING YES Procedure Step 3 SAT [ ] UNSAT [ ]

Standards Operator verifies that 1-CH-P-1A is the only running charging pump.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 11 CONTROL ROOM JPM - (N)

4 CLOSE BIT INLET ISOLATION VALVES. Procedure Step 4 (Alternate Path Step)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator verifies/establishes required alignment.

Operator momentarily depresses CLOSE pushbutton for 1-SI-MOV-1867A and verifies valve indicates closed.

Operator momentarily depresses CLOSE pushbutton for 1-SI-MOV-1867B and observes that valve position (full open) DID NOT Change.

Operator dispatches operations personnel to open breaker 1-EE-BKR-1J1-2N C3, and close 1-SI-MOV-1867B per procedure step 4 RNO.

Notes/Comments Booth operator will acknowledge the request and call back in a few minutes to report that the requested action is complete.

5 STOP RUNNING LOW-HEAD SI PUMPS AND PUT IN Procedure Step 5 AUTO-STANDBY.

SAT [ ] UNSAT [ ]

Standards Operator momentarily places control switches for 1-SI-P-1A and 1-SI-P-1B in STOP.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 11 CONTROL ROOM JPM - (N)

6 STABILIZE RCS PRESSURE AS NECESSARY FOR PLANT Procedure Step 6 CONDITIONS.

SAT [ ] UNSAT [ ]

Standards Operator monitors RCS pressure and determines that the PORV is cycling properly and controlling plant pressure at LTOP setpoint.

Performance As the SRO, confirm that you desire to allow PORVs to cycle at the Cue(s) LTOP setpoint while recovery actions continue.

Notes/Comments Performance cue may not be necessary (operator may determine based on plant conditions that this option is the most appropriate.)

7 CHECK AFW - IN-SERVICE NO Procedure Step 7 SAT [ ] UNSAT [ ]

Standards Operator determines AFW is NOT in-service by Control Board indications and/or knowledge of plant conditions (AFW isolated in this Mode) and goes to Step 8 (per RNO).

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 11 CONTROL ROOM JPM - (N)

8 EVALUATE CONTAINMENT EVACUATION, AS Procedure Step 8 APPLICABLE .

SAT [ ] UNSAT [ ]

Performance As the SRO, inform the operator that the Shift Manager will Cue(s) evaluate the need for Containment evacuation.

Notes/Comments 9 CLOSE BIT OUTLET ISOLATION VALVES. Procedure Step 9 SAT [ ] UNSAT [ ]

Standards Operator verifies/establishes required alignment.

Operator momentarily depresses CLOSE pushbutton for 1-SI-MOV-1867C and verifies valve indicates closed.

Operator momentarily depresses CLOSE pushbutton for 1-SI-MOV-1867D and verifies valve indicates closed.

Notes/Comments NAPS 2012 NRC EXAM Page: 8 of 11 CONTROL ROOM JPM - (N)

10 RESET BOTH TRAINS OF PHASE A ISOLATION. Procedure Step 10 Critical Step SAT [ ] UNSAT [ ]

Standards Operator momentarily places BOTH Phase A Isolation Reset switches in RESET.

Notes/Comments Operator should note change in annunciator window status .(K-H7 clears upon successful reset of BOTH trains of Phase A.)

11 CHECK IF RCP SEAL WATER RETURN CAN BE Procedure Step 11 ESTABLISHED YES.

SAT [ ] UNSAT [ ]

Standards Operator confirms RCP Seal Water return parameters are satisfied and performs the following:

Operator momentarily depresses OPEN pushbutton for 1-CH-MOV-1380 and verifies valve indicates open.

Operator momentarily depresses OPEN pushbutton for 1-CH-MOV-1381 and verifies valve indicates open.

Notes/Comments NAPS 2012 NRC EXAM Page: 9 of 11 CONTROL ROOM JPM - (N)

12 CHECK CHARGING AND LETDOWN REQUIRED FOR RCS Procedure Step 12 PRESSURE AND LEVEL CONTROL YES SAT [ ] UNSAT [ ]

Standards Operator determines that Charging and Letdown are required to control RCS pressure.

Notes/Comments Performance Assume that another operator will perform the remainder of this Cue(s) attachment.

This completes the JPM.

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 10 of 11 CONTROL ROOM JPM - (N)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE NEW - alternate path TASK Terminate spurious SI in accordance with 1-AP-0.1.

CHECKLIST NOTE: An instructor should be assigned as an extra operator on the floor to silence any unrelated nuisance alarms. Nuisance alarms can also be overridden as part of the IC shoot if desired.

_____ Recall IC (Mode 5, solid, RHR in-serivce)

_____ Override close pushbutton for 1-SI-MOV-1867B as follows:

_____ Ensure Charging & Letdown are setup with 1-CH-FCV-1122 in manual and adjusted such that 1-CH-PCV-1145 is controlling at ~50% demand in auto.

_____ Once operator has assumed Unit responsibility, perform the following to initiate the spurious SI:

_____ Delete the malfunction after triggering to allow SI to be reset As Aux Bldg Operator, acknowledge order to open breaker 1-EE-BKR-1J1-2N C3 for 1-SI-MOV-1867B and close the valve; report back action complete after approximately 3 minutes.

NAPS 2012 NRC EXAM Page: 11 of 11 CONTROL ROOM JPM - (N)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Unit is in mode 5 with RCS Temperature <200°F.

Containment atmosphere airborne radioactivity concentration is high.

Maintenance is to be performed inside containment.

INITIATING CUE You are requested to place containment purge in operation in accordance with 1-OP-21.2 at a flow rate no greater than 18,000CFM.

NAPS 2012 NRC EXAM Page: 1 of 13 CONTROL ROOM JPM - (D)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Place the Containment Purge System in operation (1-OP-21.2) at a flow rate no greater than 18,000CFM.

TASK STANDARDS Containment Purge System placed in operation as directed by the procedure.

K/A

REFERENCE:

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 15 minutes Start Time = ______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluators Signature /

Date EVALUATORS COMMENTS NAPS 2012 NRC EXAM Page: 2 of 13 CONTROL ROOM JPM - (D)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit is in mode 5 with RCS Temperature <200°F.

Containment atmosphere airborne radioactivity concentration is high.

Maintenance is to be performed inside containment.

INITIATING CUE You are requested to place containment purge in operation in accordance with 1-OP-21.2 at a flow rate no greater than 18,000CFM.

NAPS 2012 NRC EXAM Page: 3 of 13 CONTROL ROOM JPM - (D)

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Copy of 1-OP-21.1 PERFORMANCE STEPS START TIME __________

1 Operator reviews Precautions and Limitations. Procedure Step 5.1.2 SAT [ ] UNSAT [ ]

Simulation Cue(s) If additional RM system status information is requested, inform Operator that:

  • 1-RM-RMS-159, 160, 162 are operable with adequate sample flow.

Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 13 CONTROL ROOM JPM - (D)

2 Initiate a Reactor Containment Release Permit. Procedure Step 5.1.3 SAT [ ] UNSAT [ ]

Simulation Cue(s) As SRO, Inform Operator that a Reactor Containment Release Permit has been initiated and completed.

Notes/Comments 3 Notify Health Physics prior to placing Purge System into operation. Procedure Step 5.1.5 SAT [ ] UNSAT [ ]

Standards Operator notifies Health Physics.

Simulation Cue(s) Simulator Booth will Inform Operator that Health Physics is notified.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 13 CONTROL ROOM JPM - (D)

4 If required, 1-PT-61.3.2 must be completed before breaking Procedure Step 5.1.6 containment vacuum by movement of any of the Purge and Exhaust Valves.

SAT [ ] UNSAT [ ]

Simulation Cue(s) As SRO, Inform Operator that the Relief Office has been contacted and verifies that 1-PT-61.3.2 As Found Pressure Test is completed.

Notes/Comments 5 Unlock and close the breakers for the Containment Purge and Procedure Step 5.1.7 Exhaust valves.

Critical Step SAT [ ] UNSAT [ ]

Standards The following breakers are unlocked and closed:

  • 1-EP-BKR-1C1-1 B1
  • 1-EP-BKR-1C1-1 B2
  • 1-EP-BKR-1A1-1 C3
  • 1-EP-BKR-1A1-1 C4
  • 1-EP-BKR-1B1-2 C3
  • 1-EP-BKR-1B1-2 C4 Simulation Cue(s) Simulator Booth will perform the function as field Operator and will close the breakers, then report back that the action is completed.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 13 CONTROL ROOM JPM - (D)

6 Unlock the handwheels for the Containment Purge and Exhaust Procedure Step 5.1.8 valves.

Critical Step SAT [ ] UNSAT [ ]

Standards Locks have been removed from the following valve handwheels:

  • 1-HV-MOV-100D
  • 1-HV-MOV-101
  • 1-HV-MOV-100B
  • 1-HV-MOV-102
  • 1-HV-MOV-100A
  • 1-HV-MOV-100C Simulation Cue(s) Simulator Booth will perform the function as field Operator and will remove the locks, then report back that the action is completed.

Notes/Comments 7 Open the following valves to break containment vacuum. Procedure Steps 5.1.9 and 5.1.10a

  • Purge supply (inside containment) isolation valve.
  • Purge relief valve (vacuum breaker).

Critical Step SAT [ ] UNSAT [ ]

Standards Operator opens 1-HV-MOV-100A, Purge Supply Isol. Valve.

Operator opens 1-HV-MOV-102, Purge Relief Valve.

Simulation Cue(s) Containment is not atmospheric.

After 1-HV-MOV-102 is opened, inform the operator that containment has equalized with atmospheric pressure.

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 13 CONTROL ROOM JPM - (D)

8 When containment pressure has equalized with atmosphere, close Procedure Step the Purge Relief Valve. 5.1.10b SAT [ ] UNSAT [ ]

Standards Operator closes 1-HV-MOV-102, Purge Relief Valve.

Notes/Comments 9 Verify that the Containment Iodine Filter Fans are OFF. Procedure Step 5.1.11 SAT [ ] UNSAT [ ]

Simulation Cue(s) Operator verifies that Control switches for 1-HV-3A/3B are in OFF.

Notes/Comments NAPS 2012 NRC EXAM Page: 8 of 13 CONTROL ROOM JPM - (D)

10 Request the Instrument Department to calibrate the containment Procedure Step 5.1.12 radiation monitors, if required.

SAT [ ] UNSAT [ ]

Simulation Cue(s) As the SRO, inform the Operator that all applicable containment radiation monitors have been calibrated and sample flows have been verified.

Notes/Comments 11 Align purge through the iodine filters. Procedure Step 5.1.13 SAT [ ] UNSAT [ ]

Simulation Cue(s) As SRO, inform Operator that the Iodine Filter Banks have been aligned.

Notes/Comments NAPS 2012 NRC EXAM Page: 9 of 13 CONTROL ROOM JPM - (D)

12 Open the following valves to establish a purge flow path. Procedure Step 5.1.14,

  • 1-HV-MOV-100B, Purge supply (outside containment) isolation 5.1.15, valve 5.1.16
  • 1-HV-MOV-100C, Purge exhaust (inside containment) isolation valve
  • Purge exhaust bypass valve, if required (NO)
  • 1-HV-MOV-100D Purge exhaust (outside containment) isolation valve, if allowed (YES)

Critical Step SAT [ ] UNSAT [ ]

Standards Operator places Control switches for 1-HV-MOV-100B, 100C, and 100D in OPEN.

Notes/Comments: For the purposes of this JPM allowable release rate is >11,000 CFM.

13 Start a purge exhaust fan. Procedure Step 5.1.17 SAT [ ] UNSAT [ ]

Standards Operator starts Either 1-HV-F-5A or 5B.

Notes/Comments NAPS 2012 NRC EXAM Page: 10 of 13 CONTROL ROOM JPM - (D)

14 Verify ventilation stack B flow increases. Procedure Step 5.1.18 SAT [ ] UNSAT [ ]

Simulation Cue(s) Operator verifies a step increase is indicated on 1-HV-FR-1212B.

Notes/Comments 15 If required, throttle closed the purge exhaust bypass valve to Procedure Step reduce flow.

SAT [ ] UNSAT [ ]

Simulation Cue(s) Operator verifies that Indicated flow on 1-HV-FR-1212B is < the maximum allowed flow rate of 18000cfm.

Notes/Comments 15 Start a purge supply fan. Procedure Step _____

Critical Step SAT [ ] UNSAT [ ]

Standards Operator starts either 1-HV-F-4A or 4B.

Notes/Comments NAPS 2012 NRC EXAM Page: 11 of 13 CONTROL ROOM JPM - (D)

16 If required, remove purge from the iodine filter. Procedure Step _____

SAT [ ] UNSAT [ ]

Simulation Cue(s) Assume that another operator will perform this step.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 12 of 13 CONTROL ROOM JPM - (D)

SIMULATOR, LABORATORY, INPLANT SETUP (If Required)

TASK CHECKLIST

_____ Recall IC (Mode 5)

_____ Ensure that one Containment Air Recirc Fan is in operation

_____ When contacted to unlock and close breakers, Go to the HV System MOV Control Screen and RACKIN the following Breakers:

  • 1-EP-BKR-1C1-1 B1 for 1-HV-MOV-101
  • 1-EP-BKR-1C1-1 B2 for 1-HV-MOV-102
  • 1-EP-BKR-1A1-1 C3 for 1-HV-MOV-100A
  • 1-EP-BKR-1A1-1 C4 for 1-HV-MOV-100C
  • 1-EP-BKR-1B1-2 C3 for 1-HV-MOV-100B
  • 1-EP-BKR-1B1-2 C4 for 1-HV-MOV-100D NAPS 2012 NRC EXAM Page: 13 of 13 CONTROL ROOM JPM - (D)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Reactor Coolant System boron concentration is 425 ppm All rods are fully withdrawn The reactor is approximately 97%

Core life is 14500 MWD/MTU "A" BAST is 14350 ppm INITIATING CUE Using the Dilution Mode of Operation, you are requested to reduce Reactor Coolant System boron concentration to 395 ppm to increase power to 100%.

Establish a 50-gpm Primary Grade Water flow rate not to exceed 1000 gallons per distinct dilution step. Stabilize reactor power at 99%, and verify expected results before continuing dilution to 100%

and the desired Reactor Coolant System boron concentration.

(3,653 gallons of Primary Grade Water is calculated for achieving the desired dilution. This value has been peer-checked and has SRO concurrence.)

NAPS 2012 NRC EXAM Page: 1 of 9 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Dilute the Reactor Coolant System using the blender ( 1-GOP-8.3.1, 1-OP-8.3.1).

TASK STANDARDS The blender was operated IAW 1-OP-8.3.1 to achieve the required Primary Grade Water addition, and the dilution is stopped when the rate of Primary Grade Water flow cannot be controlled.

K/A

REFERENCE:

004-A2.25 (3.8/4.3)

ALTERNATE PATH:

Primary Grade Water flow cannot be controlled and the dilution must be stopped.

TASK COMPLETION TIMES Validation Time = 20 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 9 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Reactor Coolant System boron concentration is 425 ppm All rods are fully withdrawn The reactor is approximately 97%

Core life is 14500 MWD/MTU "A" BAST is 14350 ppm INITIATING CUE Using the Dilution Mode of Operation, you are requested to reduce Reactor Coolant System boron concentration to 395 ppm to increase power to 100%.

Establish a 50-gpm Primary Grade Water flow rate not to exceed 1000 gallons per distinct dilution steps. Stabilize reactor power at 99%, and verify expected results before continuing dilution to 100%

and the desired Reactor Coolant System boron concentration.

(3,653 gallons of Primary Grade Water is calculated for achieving the desired dilution. This value has been peer-checked and has SRO concurrence.)

NAPS 2012 NRC EXAM Page: 3 of 9 CONTROL ROOM JPM - (M)

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Copy of 1-OP-8.3.1 Copy of 1-GOP-8.3.1 PERFORMANCE STEPS START TIME __________

1 Review precautions and limitations. Procedure Step 5.1.2 SAT [ ] UNSAT [ ]

Standards Operator reviews Precautions and limitations.

Notes/Comments: Operator may request guidance on how many gallons of PG shall be injected at a time. Act as an SRO and state that a total of 1000 gallons of PG will be used as the first incremental dilution.

NAPS 2012 NRC EXAM Page: 4 of 9 CONTROL ROOM JPM - (M)

2 If VCT makeup will require diverting letdown to the gas stripper, Procedure Step 5.1.3 then notify health physics.

SAT [ ] UNSAT [ ]

Simulation Cue(s) For the purpose of this evaluation assume that diverting letdown is not required.

Notes/Comments 3 Determine the rate and magnitude of Primary Grade Water to Procedure Step 5.1.4 obtain the desired dilution.

Simulation Cue(s) 3,653 gallons of Primary Grade Water has been calculated for achieving the desired dilution.

(Value provided in Initiating Cue.)

Notes/Comments 4 Obtain concurrence from the Unit Supervisor that the rate and Procedure Step 5.1.5 magnitude is set properly for the current plant conditions.

SAT [ ] UNSAT [ ]

Simulation Cue(s) For the purpose of this evaluation assume that the Unit Supervisor has provided concurrence with the rate and magnitude.

Notes/Comments: Information provided in Initiating Cue.

NAPS 2012 NRC EXAM Page: 5 of 9 CONTROL ROOM JPM - (M)

5 Place the BLENDER CONTROL switch in STOP. Procedure Step 5.1.6 SAT [ ] UNSAT [ ]

Standards Operator places BLENDER CONTROL in STOP.

Simulation Cue(s) Blender control has green light LIT.

Notes/Comments 6 Place the BLENDER MODE switch in DILUTE. . Procedure Step 5.1.7 Critical Step SAT [ ] UNSAT [ ]

Standards Operator places BLENDER MODE selector switch is in DILUTE.

Notes/Comments 7 Ensure that 1-CH-FCV-1113A, Boric Acid to Blender is in AUTO Procedure Step 5.1.8 and CLOSED.

SAT [ ] UNSAT [ ]

Standards Operator verifies that 1-CH-FCV-1113A is in AUTO and CLOSED. .

Simulation Cue(s) 1-CH-FCV-1113A is in AUTO and CLOSED with green light lit.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 9 CONTROL ROOM JPM - (M)

8 Place the BLENDER CONTROL switch in START. Procedure Step 5.1.9 Critical Step SAT [ ] UNSAT [ ]

Standards Operator places BLENDER CONTROL selector switch in START.

Simulation Cue(s) Blender control has red light LIT.

Notes/Comments 9 Adjust VCT level controller 1-CH-LCV-1112C, if required. Procedure Step 5.1.10 SAT [ ] UNSAT [ ]

Notes/Comments 10 Adjust Primary Grade Water controller 1-CH-FCV-1114A to the Procedure Step 5.1.11 desired flow rate, if required.

SAT [ ] UNSAT [ ]

Standards Operator adjusts PRIMARY GRADE WATER Controller 1-CH-FCV-1114A to achieve a dilution flow rate of 50 gpm +/- 2 gpm .

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 9 CONTROL ROOM JPM - (M)

11 Stop the dilution when complete. Procedure Step 5.1.12 Alternate Path Critical Step SAT [ ] UNSAT [ ]

Note To The A malfunction causes the PRIMARY GRADE WATER flow to increase.

Evaluator The operator will not be able to adjust PRIMARY GRADE WATER flow down and needs to STOP the dilution.

Standards Dilution flow is stopped by taking Blender Control Switch to STOP.

Performance Assume that Primary Grade Water flow indication is slowly increasing.

Cue(s)

Simulation Cue(s) Assume that Primary Grade Water Flow Controller will not respond to Operator attempts to decrease flow.

Notes/Comments 12 Place blender in Automatic Makeup Mode. Procedure Step 5.1.13 SAT [ ] UNSAT [ ]

Performance Assume that another operator will perform this task.

Cue(s)

Simulation Cue(s) Assume that another operator will perform this task.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 8 of 9 CONTROL ROOM JPM - (M)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE R705 (Modified -Alternate Path)

TASK Dilute the Reactor Coolant System using the blender (1-GOP-8.3.1, 1-OP-8.3.1).

CHECKLIST

_____ Recall IC #151

_____ Ensure 1-CH-FC-114A Controller Pot setting is .33

_____ Enter malfunction Trigger 1 approximately 1 minute after the Operator has adjusted and stabilized Primay Water flow at 50 gpm.

FC114A_R2 OFF FC114A-RAISE ON FC114A AI 1

_____ Delete malfunction Trigger 1 after the Operator stops the dilution.

NAPS 2012 NRC EXAM Page: 9 of 9 CONTROL ROOM JPM - (M)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS The monthly surveillance of the 1H-EDG is being performed.

1-PT-82H is completed through step 6.2.14.

The operator at the EDG has notified you the EDG is at the high speed stop.

The 1H EDG EMERG DIESEL GENERATOR MODE SELECTOR SWITCH is in MAN REMOTE.

EDG frequency meter is installed and an operator and electrician are standing by to report frequency and remove meter when requested.

INITIATING CUE You have been directed to sync the 1H EDG to the H Emergency Bus and increase EDG load to 2500-2600 KW using 1-PT-82H.

NAPS 2012 NRC EXAM Page: 1 of 10 CONTROL ROOM JPM - (D)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Perform the monthly emergency diesel generator slow-start test on the backboards watchstation (1-PT-82H).

TASK STANDARDS 1H EDG is loaded to 1500KW and the EDG is shutdown when load cannot be controlled.

K/A

REFERENCE:

062-A4.07 [3.1/3.1]

ALTERNATE-PATH TOPIC Diesel load cannot be controlled and diesel must be tripped.

TASK COMPLETION TIMES Validation Time = 20 minutes Start Time =

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 10 CONTROL ROOM JPM - (D)

Dominion North Anna Power Station CONTROL ROOM JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The monthly surveillance of the 1H-EDG is being performed.

1-PT-82H is completed through step 6.2.14.

The operator at the EDG has notified you the EDG is at the high speed stop.

The 1H EDG EMERG DIESEL GENERATOR MODE SELECTOR SWITCH is in MAN REMOTE.

EDG frequency meter is installed and an operator and electrician are standing by to report frequency and remove meter when requested.

INITIATING CUE You have been directed to sync the 1H EDG to the H Emergency Bus and increase EDG load to 2500-2600 KW using 1-PT-82H.

EVALUATION METHOD Perform if conducted in the simulator or in the electrical laboratory (use Performance Cue(s))

Simulate if conducted in the station (use Simulation Cue(s))

NAPS 2012 NRC EXAM Page: 3 of 10 CONTROL ROOM JPM - (D)

TOOLS AND EQUIPMENT None PERFORMANCE STEPS START TIME __________

1 Turn the synchronizer switch for 15H2 to ON. Procedure Step 6.2.15 SAT [ ] UNSAT [ ]

Standards Operator turns the Synchronizer switch for 15H2 to ON.

Notes/Comments 2 Record frequency on the procedure and verify between 59.5 and Procedure Step 6.2.16 60.5 Hz.

SAT [ ] UNSAT [ ]

Standards Operator records frequency in procedure step and verifies it between 59.5 and 60.5 Hz.

Performance Frequency is 60.1 Cue(s)

Simulation Cue(s) Frequency is 60.1 Hz Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 10 CONTROL ROOM JPM - (D)

3 Record voltage in the procedure and verify it is 107 to 130 volts. Procedure Step 6.2.18 SAT [ ] UNSAT [ ]

Note To The A voltage between 107 volts and 130 volts corresponds to an actual Evaluator EDG voltage between 3740 volts and 4580 volts.

Standards Operator records voltage in the procedure and verifies it to be between 107 and 130 volts.

Simulation Cue(s) Voltage is 120 volts.

Notes/Comments 4 Verify the EMER GEN 1H SPEED/LOAD CONTROL switch is Procedure Step 6.20 functioning by adjusting EDG frequency.

SAT [ ] UNSAT [ ]

Standards Operator moves SPEED/LOAD CONTROL switch while frequency change verified.

Simulation Cue(s) When operator turns the switch clockwise, tell him diesel speed went up. If switch moved counter-clockwise, tell the operator diesel speed went down.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 10 CONTROL ROOM JPM - (D)

5 Operator calls electricians to remove frequency meter. Procedure Step 6.2.21 SAT [ ] UNSAT [ ]

Standards Communication to electricians made. It is permissible to delegate that communication to a supervisor or someone else on the crew.

Performance Tell the operator electricians have been notified and they will remove Cue(s) frequency meter.

Notes/Comments 6 The operator uses SPEED/LOAD CONTROL switch to match EDG Procedure Step 6.3.1 and Bus frequency.

SAT [ ] UNSAT [ ]

Standards Operator matches Bus frequency and EDG frequency. This is verified by syncroscope not moving.

Simulation Cue(s) Starting Point: Synchroscope is moving slowly in the fast direction.

After adjustment downward is made, tell the operator the Synchroscope needle has stopped Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 10 CONTROL ROOM JPM - (D)

7 Adjust EDG (incoming) voltage 1-2 volts higher than bus (running) Procedure Step 6.3.2 voltage using EMER GEN 1H EXCITER VOLTAGE CONTROL Switch.

SAT [ ] UNSAT [ ]

Standards Operator adjusts EDG voltage 1-2 volts higher than bus voltage.

Simulation Cue(s) EDG voltage is 120 and bus voltage is 126.

After adjustment upward, EDG voltage is 127 volts.

Notes/Comments 8 Adjust SPEED/LOAD CONTROL so synchroscope goes slowly in Procedure Step 6.3.3 the fast direction.

CRITICAL STEP SAT [ ] UNSAT [ ]

Standards Operator adjusts SEED/LOAD CONTROL so synchroscope moves slowly in the clockwise direction (one rotation in 20 seconds or longer).

Simulation Cue(s) Synchroscope is moving slowly in the counter clockwise direction.

After adjustment upward, the synchroscope is moving slowly in the fast direction.

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 10 CONTROL ROOM JPM - (D)

9 Close EDG output breaker 15H2 by taking the breaker switch in the Procedure Step 6.3.4 clockwise position when the synchroscope is approximately 1 minute to twelve o'clock. Record time breaker closed in procedure.

CRITICAL STEP SAT [ ] UNSAT [ ]

Standards Operator closes 15H2 breaker. Time breaker closed written in the procedure (plus or minus 5 minutes is acceptable for breaker closure.)

Simulation Cue(s) Red light on and green light off for the EDG output breaker.

Inform the Operator that you are the peer checker and initial the procedure if requested.

Notes/Comments 10 Load EDG to 500-1000 KW using EMER GEN 1H SPEED/LOAD Procedure Step 6.3.5 CONTROL Switch and adjust KVAR to zero using VOLTAGE CONTROL Switch.

CRITICAL STEP SAT [ ] UNSAT [ ]

Standards Operator adjusts EDG load 500KW-1000KW and KVAR at zero.

Simulation Cue(s) After load adjusted up, Load is 700KW and KVARS will indicate approximately 350 out. After voltage adjustment down, KVARS are zero.

Notes/Comments NAPS 2012 NRC EXAM Page: 8 of 10 CONTROL ROOM JPM - (D)

11 Turn the sync switch counter-clockwise to off. Procedure Step 6.3.6 SAT [ ] UNSAT [ ]

Standards Operator places Sync switch in off.

Notes/Comments 12 Load EDG to 1650-1750 KW using EMER GEN 1H SPEED/LOAD Procedure Step 6.3.7 CONTROL SWITCH.

CRITICAL STEP SAT [ ] UNSAT [ ]

Note To The When EDG load gets to 1500 KW a malfunction causes the EDG to Evaluator continue increasing load. The operator will not be able to adjust load down and needs to open the output breaker.

Standards EDG loaded to 1500 KW. As load continues to increase, the operator opens the EDG output breaker or shuts down the EDG.

Simulation Cue(s) Load is increasing 1600, 1650, 1700, 1750 (Continue cueing that load is going up, or is pegged high, until the EDG is shutdown.)

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 9 of 10 CONTROL ROOM JPM - (D)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

SIMULATOR SETUP JOB PERFORMANCE MEASURE N578 / 16747 NORMAL TASK Perform the monthly emergency diesel generator slow-start test on the backboards watchstation (1-PT-82H, 1-PT-82J, 2-PT-82H, 2-PT-82J; 1-OP-6.1 or 1-OP-6.2 with 1-LOG-12; 2-OP-6.1 or 2-OP-6.2 with 2-LOG-12).

ALTERNATE-PATH TOPIC Diesel load cannot be controlled and diesel must be tripped.

CHECKLIST

_____ Recall IC 153

_____ Verify 1H EDG Mode Selector Switch in MAN-LOCAL

_____ Verify 1H EDG running unloaded at full load

_____ Verify Switch Override-EG1H_SC_RAISE (Emer Gen 1H Speed Control = ON, Trigger = 1 EG1H_SC_LOWER (Emer Gen 1H Speed Control = OFF, Trigger = 1 NOTE: Ensure Integral Constant & Derivative Constant are set ec0118kinteg 1.00 e-005 ec0125kinteg 1.00 e-005 ec0118kdnteg 0.005 ec0118kdnteg 0.005

_____ Verify trigger 1 as edgh_mw>=1.5

_____ Take to freeze until exam

_____ Prepare 1-PT-82H signed off up to step for turning on sync switch Booth Operator Communications and Instructions:

  • If paged for removal of frequency meter, tell the operator electrical will remove the meter
  • When Operator adjusts KVARS after reaching 1500 KW verify trigger 1 has been inserted to fail speed control high NAPS 2012 NRC EXAM Page: 10 of 10 CONTROL ROOM JPM - (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS The Control Room was evacuated and 1-AP-20, Operation from the Auxiliary Shutdown Panel, is in effect.

The Control Room has been re-occupied and the crew is currently in the process of transferring control of systems back to the Control Room.

INITIATING CUE You are requested to perform 1-AP-20, Attachment 2, Resetting Local Trip Switches on Breakers.

The OATC has authorized resetting CVCS switches in accordance with Step 1 of Attachment 2.

NAPS 2012 NRC EXAM Page: 1 of 9 IN-PLANT JPM - (N)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Locally reset trip switches on breakers in accordance with 1-AP-20, Attachment 2.

TASK STANDARDS Trip-Reset switches on breakers for Charging Pumps, Boric Acid Transfer Pumps, AFW Pumps, and PZR heaters are all placed in RESET.

K/A

REFERENCE:

062 K2.01 ( 3.3 / 3.4)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 16 minutes Start Time = ________

Actual Time = _______ minutes Stop Time = ________

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Operator (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 9 IN-PLANT JPM - (N)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE OPERATOR Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The Control Room was evacuated and 1-AP-20, Operation from the Auxiliary Shutdown Panel, is in effect.

The Control Room has been re-occupied and the crew is currently in the process of transferring control of systems back to the Control Room.

INITIATING CUE You are requested to perform 1-AP-20, Attachment 2, Resetting Local Trip Switches on Breakers.

The OATC has authorized resetting CVCS switches in accordance with Step 1 of Attachment 2.

NAPS 2012 NRC EXAM Page: 3 of 9 IN-PLANT JPM - (N)

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Blank copy of 1-AP-20, Attachment 2, Resetting Local Trip Switches on Breakers, to be provided to Operator.

Evaluators Notes:

The Reset switches are similar to a typical Lockout Relay. They are latched in the RESET position and when actuated a coil is energized that releases the latch. Once the latch is released, spring force rotates the switch ~ 45° to the TRIP position (changing the state of the switch contacts) and maintains it there until reset by the operator, by rotating the switch until it re-latches.

Note: Prior to resetting the Trip-Reset switches, the Local-Remote switches at the Auxiliary Shutdown Panel MUST be placed in REMOTE. Otherwise, the Trip-Reset switches will NOT latch and will spring return to TRIP when released. Repositioning of the Local-Remote switches is done in the body of the procedure, Steps 19-21.

PERFORMANCE STEPS START TIME __________

Note: Operator will read the following procedure note:

NAPS 2012 NRC EXAM Page: 4 of 9 IN-PLANT JPM - (N)

NOTE: Authorization from the Control Room OATC MUST be received before performing EACH system in this attachment.

1 In the Emergency Switchgear Room, ensure the following Procedure Step 1a Trip-Reset switches are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

15H6 (1-CH-P-1A) 15H7 (1-CH-P-1C) NORM 15J6 (1-CH-P-1B) 15J7 (1-CH-P-1C) ALT Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating the Trip-Reset switch clockwise until it is straight up and down (pointing to RESET)

THEN, tell them the switch is as they see it now.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 9 IN-PLANT JPM - (N)

2 In the Cable Vault, ensure the following Trip-Reset switches Procedure Step 1b are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

1H1-2S L3 (1-CH-P-2A) 1J1-2S H3 (1-CH-P-2B)

Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating switch clockwise until it is straight up and down (pointing to RESET) THEN, tell them the switch is as they see it now.
  • As the OATC, acknowledge completion of Step 1 of 1-AP-20, Att.

2, AND tell the Operator the OATC authorizes performing Step 2 of 1-AP-20, Att. 2, reset of AFW switches.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 9 IN-PLANT JPM - (N)

3 WHEN the OATC authorizes reset of AFW switches, THEN Procedure Step 2 ensure the following Trip-Reset switches in the Emergency Switchgear are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

15H3 (1-FW-P-3A) 15J3 (1-FW-P-3B)

Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating switch clockwise until it is straight up and down (pointing to RESET) THEN, tell them the switch is as they see it now.
  • As the OATC, acknowledge completion of Step 2 of 1-AP-20, Att.

2, AND tell the Operator the OATC authorizes performing Step 3 of 1-AP-20, Att. 2, reset of PZR Htr switches.

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 9 IN-PLANT JPM - (N)

4 WHEN the OATC authorizes reset of PZR Htr switches, THEN Procedure Step 3 ensure the following Trip-Reset switches in Rod Drive are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

14H1-6 (PZR HTR PNL NO. 4) 14J1-6 (PZR HTR PNL NO. 1)

Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating switch clockwise until it is straight up and down (pointing to RESET) THEN, tell them the switch is as they see it now.

Notes/Comments: The Trip-Reset switches are located above and to the left of the breaker.

There are Thermal Overload Reset Pushbuttons located nearer to the PZR HTR breakers.

5 Notify the Unit 1 OATC that this attachment is complete Procedure Step 5 SAT [ ] UNSAT [ ]

Standards Operator calls Unit 1 OATC and reports that attachment 2 of 1-AP-20 is complete.

Performance Cues Acknowledge as Unit 1 OATC that attachment 2 of 1-AP-20 is complete.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 8 of 9 IN-PLANT JPM - (N)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

TASK Locally reset trip switches on breakers in accordance with 1-AP-20, Attachment 2.

CHECKLIST There is a switch mockup in the Electrical Lab that can be placed in the TRIP position. This switch can be used to allow the Operator to describe in further detail, and demonstrate actual repositioning of the switches after the JPM is completed, if desired.

NAPS 2012 NRC EXAM Page: 9 of 9 IN-PLANT JPM - (N)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS The Control Room was evacuated and 2-AP-20, Operation from the Auxiliary Shutdown Panel, is in effect.

The Control Room has been re-occupied and the crew is currently in the process of transferring control of systems back to the Control Room.

INITIATING CUE You are requested to perform 2-AP-20, Attachment 2, Resetting Local Trip Switches on Breakers.

The OATC has authorized resetting CVCS switches in accordance with Step 1 of Attachment 2.

NAPS 2012 NRC EXAM Page: 1 of 9 IN-PLANT JPM - (N)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Locally reset trip switches on breakers in accordance with 2-AP-20, Attachment 2.

TASK STANDARDS Trip-Reset switches on breakers for Charging Pumps, Boric Acid Transfer Pumps, AFW Pumps, and PZR heaters are all placed in RESET.

K/A

REFERENCE:

062 K2.01 ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 17 minutes Start Time = ________

Actual Time = _______ minutes Stop Time = ________

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Operator (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 9 IN-PLANT JPM - (N)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE OPERATOR Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The Control Room was evacuated and 2-AP-20, Operation from the Auxiliary Shutdown Panel, is in effect.

The Control Room has been re-occupied and the crew is currently in the process of transferring control of systems back to the Control Room.

INITIATING CUE You are requested to perform 2-AP-20, Attachment 2, Resetting Local Trip Switches on Breakers.

The OATC has authorized resetting CVCS switches in accordance with Step 1 of Attachment 2.

NAPS 2012 NRC EXAM Page: 3 of 9 IN-PLANT JPM - (N)

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Blank copy of 2-AP-20, Attachment 2, Resetting Local Trip Switches on Breakers, to be provided to Operator.

Evaluators Notes:

The Reset switches are similar to a typical Lockout Relay. They are latched in the RESET position and when actuated a coil is energized that releases the latch. Once the latch is released, spring force rotates the switch ~ 45° to the TRIP position (changing the state of the switch contacts) and maintains it there until reset by the operator, by rotating the switch until it re-latches.

Note: Prior to resetting the Trip-Reset switches, the Local-Remote switches at the Auxiliary Shutdown Panel MUST be placed in REMOTE. Otherwise, the Trip-Reset switches will NOT latch and will spring return to TRIP when released. Repositioning of the Local-Remote switches is done in the body of the procedure, Steps 19-21.

PERFORMANCE STEPS START TIME __________

Note: Operator will read the following procedure note:

NOTE: Authorization from the Control Room OATC MUST be received before performing EACH system in this attachment.

NAPS 2012 NRC EXAM Page: 4 of 9 IN-PLANT JPM - (N)

1 In the Emergency Switchgear, ensure the following Trip-Reset Procedure Step 1a switches are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

25H6 (2-CH-P-1A) 25H7 (2-CH-P-1C) NORM 25J6 (2-CH-P-1B) 25J7 (2-CH-P-1C) ALT Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating the Trip-Reset switch clockwise until it is straight up and down (pointing to RESET)

THEN, tell them the switch is as they see it now.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 9 IN-PLANT JPM - (N)

2 In the Cable Vault, ensure the following Trip-Reset switches Procedure Step 1b are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

2H2-2S L3 (2-CH-P-2A) 2J2-2S H3 (2-CH-P-2B)

Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating switch clockwise until it is straight up and down (pointing to RESET) THEN, tell them the switch is as they see it now.
  • As the OATC, acknowledge completion of Step 1 of 2-AP-20, Att.

2, AND tell the Operator the OATC authorizes performing Step 2 of 2-AP-20, Att. 2, reset of AFW switches.

Notes/Comments NAPS 2012 NRC EXAM Page: 6 of 9 IN-PLANT JPM - (N)

3 WHEN the OATC authorizes reset of AFW switches, THEN Procedure Step 2 ensure the following Trip-Reset switches in the Emergency Switchgear are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

25H3 (2-FW-P-3A) 25J3 (2-FW-P-3B)

Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating switch clockwise until it is straight up and down (pointing to RESET) THEN, tell them the switch is as they see it now.
  • As the OATC, acknowledge completion of Step 2 of 2-AP-20, Att.

2, AND tell the Operator the OATC authorizes performing Step 3 of 2-AP-20, Att. 2, reset of PZR Htr switches.

Notes/Comments NAPS 2012 NRC EXAM Page: 7 of 9 IN-PLANT JPM - (N)

4 WHEN the OATC authorizes reset of PZR Htr switches, THEN Procedure Step 3 ensure the following Trip-Reset switches in Rod Drive are in RESET:

Critical Step SAT [ ] UNSAT [ ]

Standards Operator simulates placing ALL of the following Trip-Reset switches in RESET:

24H2-6 (PZR HTR PNL NO. 4) 24J2-6 (PZR HTR PNL NO. 1)

Performance Cues

  • Once Operator identifies a Trip-Reset switch, tell them (or use pointer) that the switch is at a 45° angle to the left (pointing to TRIP).
  • AFTER Operator describes rotating switch clockwise until it is straight up and down (pointing to RESET) THEN, tell them the switch is as they see it now.

Notes/Comments: The Trip-Reset switches are located above and to the left of the breaker.

There is a Thermal Overload Reset Pushbuttons located nearer to the breakers.

5 Notify the Unit 1 OATC that this attachment is complete Procedure Step 5 SAT [ ] UNSAT [ ]

Standards Operator calls Unit 1 OATC and reports that attachment 2 of 2-AP-20 is complete.

Performance Cues Acknowledge as Unit 1 OATC that attachment 2 of 2-AP-20 is complete.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 8 of 9 IN-PLANT JPM - (N)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

TASK Locally reset trip switches on breakers in accordance with 2-AP-20, Attachment 2.

CHECKLIST There is a switch mockup in the Electrical Lab that can be placed in the TRIP position. This switch can be used to allow the Operator to describe in further detail, and demonstrate actual repositioning of the switches after the JPM is completed, if desired.

NAPS 2012 NRC EXAM Page: 9 of 9 IN-PLANT JPM - (N)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Secondary heat sink has been lost on Unit 1.

Both motor-driven auxiliary feedwater pumps are running.

Turbine-driven auxiliary feedwater pump is unavailable.

INITIATING CUE You are requested to align both motor-driven auxiliary feedwater pumps to the HCV header in accordance with attachment 4 of 1-AP-22.1.

NAPS 2012 NRC EXAM Page: 1 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Align both motor-driven auxiliary feedwater pumps to feed the steam generator by way of the hand control valve header (1-AP-22.1).

TASK STANDARDS Both motor-driven auxiliary feedwater pumps are aligned to the HCV header.

K/A

REFERENCE:

061-A2.04 (3.4/3.8)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 9 minutes Start Time =

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Secondary heat sink has been lost on Unit 1.

Both motor-driven auxiliary feedwater pumps are running.

Turbine-driven auxiliary feedwater pump is unavailable.

INITIATING CUE You are requested to align both motor-driven auxiliary feedwater pumps to the HCV header in accordance with attachment 4 of 1-AP-22.1.

NAPS 2012 NRC EXAM Page: 3 of 7 IN-PLANT JPM (D)

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

TOOLS AND EQUIPMENT Administrative key Copy of 1-AP-22.1 PERFORMANCE STEPS START TIME __________

1 Have the control room operator close the following valves: Procedure Attachment 1-FW-HCV-100A, AFW HCV HEADER TO A SG 4, Step 1 1-FW-MOV-100D TURBINE DRIVEN AFW PUMP TO A SG 1-FW-HCV-100B AFW HCV HEADER TO B SG 1-FW-MOV-100B. AFW MOV HEADER TO B SG SAT [ ] UNSAT [ ]

Standards Control room operator is requested to close 1-FW-HCV-100A and 100B, and 1-FW-MOV-100D and 100B.

Simulation Cue(s) 1-FW-HCV-100A and 100B, and 1-FW-MOV-100B and 100D are closed.

Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 7 IN-PLANT JPM (D)

2 Locally unlock and open 1-FW-190. Procedure Attachment 4, Step 2 Critical Step SAT [ ] UNSAT [ ]

Standards 1-FW-P-3B Motor-Driven AFW pump to HCV Header Inlet Isolation Valve 1-FW-190 is unlocked and opened.

Simulation Cue(s) 1-FW-190 stem is fully extended.

Notes/Comments 3 Locally unlock and open 1-FW-64. Procedure Attachment 4, Step 2 Critical Step SAT [ ] UNSAT [ ]

Standards 1-FW-HCV-100A Outlet Isolation Valve 1-FW-64 is unlocked and opened.

Simulation Cue(s) 1-FW-64 stem is fully extended.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 7 IN-PLANT JPM (D)

4 Locally unlock and open 1-FW-96. Procedure Attachment 4, Step 2 Critical Step SAT [ ] UNSAT [ ]

Standards 1-FW-HCV-100B Outlet Isolation Valve 1-FW-96 is unlocked and opened.

Simulation Cue(s) 1-FW-96 stem is fully extended.

Notes/Comments 5 Notify the control room that attachment 4 has been completed. Procedure Attachment 4, Step 3 SAT [ ] UNSAT [ ]

Standards Control room is informed that attachment 4 has been completed.

Simulation Cue(s) Control room acknowledges attachment 4 is complete.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 6 of 7 IN-PLANT JPM (D)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

NAPS 2012 NRC EXAM Page: 7 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS Secondary heat sink has been lost.

Both motor-driven auxiliary feedwater pumps are running.

Turbine-driven auxiliary feedwater pump is unavailable.

INITIATING CUE You are requested to align both motor-driven auxiliary feedwater pumps to the HCV header in accordance with attachment 4 of 2-AP-22.1.

NAPS 2012 NRC EXAM Page: 1 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Align both motor-driven auxiliary feedwater pumps to feed the steam generator by way of the hand control valve header (2-AP-22.1).

TASK STANDARDS Both motor-driven auxiliary feedwater pumps are aligned to the HCV header.

K/A

REFERENCE:

061-A2.04 (3.4/3.8)

ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 9 minutes Start Time =

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Secondary heat sink has been lost on Unit 2.

Both motor-driven auxiliary feedwater pumps are running.

Turbine-driven auxiliary feedwater pump is unavailable.

INITIATING CUE You are requested to align both motor-driven auxiliary feedwater pumps to the HCV header in accordance with attachment 4 of 2-AP-22.1.

EVALUATION METHOD Perform if conducted in the simulator or in a laboratory (use Performance Cue(s))

Simulate if conducted in the station or on a dead simulator (use Simulation Cue(s))

NAPS 2012 NRC EXAM Page: 3 of 7 IN-PLANT JPM (D)

TOOLS AND EQUIPMENT Administrative key Copy of 2-AP-22.1 PERFORMANCE STEPS START TIME __________

1 Have the control room operator close the following valves: Procedure Attachment 2-FW-HCV-200A, AFW HCV HEADER TO A SG 4, Step 1 2-FW-MOV-200D TURBINE DRIVEN AFW PUMP TO A SG 2-FW-HCV-200B AFW HCV HEADER TO B SG 2-FW-MOV-200B. AFW MOV HEADER TO B SG SAT [ ] UNSAT [ ]

Standards Control room operator is requested to close 2-FW-HCV-200A and 200B, and 2-FW-MOV-200D and 200B.

Simulation Cue(s) 2-FW-HCV-200A and 200B, and 2-FW-MOV-200B and 200D are closed.

Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 7 IN-PLANT JPM (D)

2 Locally unlock and open 2-FW-194. Procedure Attachment 4, Step 2 Critical Step SAT [ ] UNSAT [ ]

Standards 2-FW-P-3B Motor-Driven AFW pump to HCV Header Inlet Isolation Valve 2-FW-194 is unlocked and opened.

Simulation Cue(s) 2-FW-194 stem is fully extended.

Notes/Comments 3 Locally unlock and open 2-FW-66. Procedure Attachment 4, Step 2 Critical Step SAT [ ] UNSAT [ ]

Standards 2-FW-HCV-200A Outlet Isolation Valve 2-FW-66 is unlocked and opened.

Simulation Cue(s) 2-FW-66 stem is fully extended.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 7 IN-PLANT JPM (D)

4 Locally unlock and open 2-FW-98. Procedure Attachment 4, Step 2 Critical Step SAT [ ] UNSAT [ ]

Standards 2-FW-HCV-200B Outlet Isolation Valve 2-FW-98 is unlocked and opened.

Simulation Cue(s) 2-FW-98 stem is fully extended.

Notes/Comments 5 Notify the control room that attachment 4 has been completed. Procedure Attachment 4, Step 3 SAT [ ] UNSAT [ ]

Standards Control room is informed that attachment 4 has been completed.

Simulation Cue(s) Control room acknowledges attachment 4 is complete.

Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 6 of 7 IN-PLANT JPM (D)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

NAPS 2012 NRC EXAM Page: 7 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM INITIAL CONDITIONS The Control Room has been evacuated due to a potential toxic gas release.

Both units were tripped prior to leaving the control room.

All IRPIs on Unit 2 indicated less than 10 steps except for the following:

  • G-3 16 steps
  • D-10 18 steps
  • M-4 25 steps 2-AP-20 has been completed up to and including step 12e.

Operators are stationed at the Auxiliary Shutdown panel.

The C Boric Acid Storage Tank is in service to Unit 2.

INITIATING CUE You are requested to emergency borate Unit 2 per 2-AP-20.

NAPS 2012 NRC EXAM Page: 1 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM TASK Manual Emergency Boration of Unit 2.

TASK STANDARDS Emergency Borate Unit 2 and determine amount of boron to be added per 2-AP-20.

K/A

REFERENCE:

024AK3.01 ALTERNATE PATH:

N/A TASK COMPLETION TIMES Validation Time = 15 minutes Start Time = _______

Actual Time = _______ minutes Stop Time = _______

PERFORMANCE EVALUATION Rating [ ] SATISFACTORY [ ] UNSATISFACTORY Candidate (Print)

Evaluator (Print)

Evaluator's Signature /

Date EVALUATOR'S COMMENTS NAPS 2012 NRC EXAM Page: 2 of 7 IN-PLANT JPM (D)

Dominion North Anna Power Station IN-PLANT JOB PERFORMANCE MEASURE EVALUATION OPERATOR PROGRAM READ THE APPLICABLE INSTRUCTIONS TO THE CANDIDATE Instructions for Simulator JPMs I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

Instructions for In-Plant JPMs I will explain the initial conditions, and state the task to be performed. All steps, including any required communications, shall be simulated for this JPM. Under no circumstances are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The Control Room has been evacuated due to a potential toxic gas release.

Both units were tripped prior to leaving the control room.

All IRPIs on Unit 2 indicated less than 10 steps except for the following:

  • G-3 16 steps
  • D-10 18 steps
  • M-4 25 steps 2-AP-20 has been completed up to and including step 12e.

Operators are stationed at the Auxiliary Shutdown panel.

The C Boric Acid Storage Tank is in service to UNIT 2.

INITIATING CUE You are requested to emergency borate Unit 2 per 2-AP-20.

NAPS 2012 NRC EXAM Page: 3 of 7 IN-PLANT JPM (D)

EVALUATION METHOD Demonstration if conducted in the simulator or in a laboratory (use DEMONSTRATION cues)

Verbal-visual if conducted in the station or on a dead simulator (use VERBAL-VISUAL cues)

TOOLS AND EQUIPMENT Copy of 2-AP-20 signed off up to and including step 12e.

PERFORMANCE STEPS START TIME __________

1 Locally open 2-CH-MOV-2350 Procedure Step 12g Critical Step SAT [ ] UNSAT [ ]

Standards 2-CH-MOV-2350 is manually opened.

Verbal Visual The valve is open.

Cues Notes/Comments NAPS 2012 NRC EXAM Page: 4 of 7 IN-PLANT JPM (D)

2 Record the following: Procedure Step 12h

  • Time Emergency Boration started.
  • Initial on-service BAST level (if available).

SAT [ ] UNSAT [ ]

Standards Time and BAST level is recorded on procedure.

Notes/Comments: The indicator on the BAST level transmitter may or may not be used by the applicant. Time is sufficient.

Time ____________ BAST Level _____________

3 Check for conditions to stop Emergency Boration. Procedure Step 13, and Attachment 3 Critical Step SAT [ ] UNSAT [ ]

Standards Attachment 3 is initiated to determine Total Equivalent Stuck Rods = 2 A minimum of 50 minutes flow or 30% BAST level is required.

Visual Verbal Inform the Operator that the required time of 50 minutes has elapsed, Cues and the C Boric acid storage tank level change is 28%.

Notes/Comments NAPS 2012 NRC EXAM Page: 5 of 7 IN-PLANT JPM (D)

4 Stop Emergency Boration Procedure Step 14b Critical Step SAT [ ] UNSAT [ ]

Standards 2-CH-MOV-2350 is manually closed.

Verbal Visual The valve is closed.

Cues Notes/Comments 5 Record the time emergency boration is stopped and final on-service Procedure Step 14c BAST level.

SAT [ ] UNSAT [ ]

Standards Time and final BAST level are recorded.

Verbal Visual The A Boric acid storage tank level has decreased 28% and the Cues required amount of time of 50 minutes has elapsed.

Notes/Comments 6 Place the Boric Acid Storage Transfer Pump in SLOW. Procedure Step 14d SAT [ ] UNSAT [ ]

Standard Directs operator at the aux. Shutdown to place the Boric Acid Storage Transfer Pump in SLOW.

Verbal Visual Assume another operator will continue with the procedure.

Cues Notes/Comments

>>>>> END OF EVALUATION <<<<<

STOP TIME __________

NAPS 2012 NRC EXAM Page: 6 of 7 IN-PLANT JPM (D)

SIMULATOR, LABORATORY, IN--PLANT SETUP (If Required)

JOB PERFORMANCE MEASURE TASK Manual Emergency Boration of Unit 1 CHECKLIST

____ 2-AP-20 signed off up to and including step 12e.