Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML043490418 + ((Ccnpp 1 and 2), RAI, Incorporating Core Operating Limits Analytical Methodology References Into Technical Specifications (Tac Nos. MC4019 and MC4020))
- ML102170027 + ((Ccnpp), Units 1 and, R.E. Ginna Nuclear Power Plant (Ginna), Nine Mile Point Nuclear Plant (Nmpns), Units 1 & 2-Acceptance of Requested Cyber Security Plan (Tac ME4328, ME4329, ME4330, ME4331, ME4332))
- ML101590113 + ((Cegp), RAI Regarding Generic Letter (GL) 2008-01, Managing Gas Accumulation in Emergency Core Cooking, Decay Heat Removal, and Containment Spray Systems (GL 2008-01), (TAC MD7892 & MD7893))
- ML14009A227 + ((Closed) - Indian Point - Notice of Licensee Meeting/Pre-Decisional Enforcement Conference - 1/22/2014)
- 05000446/LER-2013-001, (Cnpnpp) Regarding Unit 2 Hot Shutdown Panel Transfer Switch Inoperable Due to Wiring Error + ((Cnpnpp) Regarding Unit 2 Hot Shutdown Panel Transfer Switch Inoperable Due to Wiring Error)
- ML14107A300 + ((Cns), Unit 2 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident)
- RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System + ((Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System)
- RA-18-0097, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System + ((Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System)
- CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System + ((Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System)
- RA-18-0199, (Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis + ((Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis)
- ML050600307 + ((Cns), Units 1 and 2, Response to a RAI for Technical Specification (TS) Amendment to Section 3.6.3, Containment Isolation Valves and the Associated Bases Section)
- ML110960432 + ((Cns), Units 1 and 2, Supplement for License Amendment Request to Revise Technical Specification (TS) 3.3.2, Engineer Safety Feature Actuation System Instrumentation Removal of the Superceded TS and Bases Requirements)
- PMNS20180873, (Copied from E. Millers meeting- Update All Fields!) + ((Copied from E. Millers meeting- Update All Fields!))
- ML121940047 + ((Corrected Date) 7/24/2012 - Notice of National Fire Protection Association Standard 805: Nuclear Regulatory Commission/Nuclear Energy Institute Management Discussion Public Meeting)
- ML11235A724 + ((Corrected Version) NRC Staffs August 19, 2011 Answer to New York and Connecticut Motion to Strike Entergy Reply to the NRC Staff Answer to Entergy Petition for Review in the Indian Point License Renewal Proceeding)
- ML15274A430 + ((Corrected) Notice (Track 2 Hearing Venue))
- ML21139A325 + ((Corrected) Order (Granting Joint Motion for Entry of a Protective Order))
- ML15120A477 + ((Corrected) Referral Memorandum to the Atomic Safety and Licensing Board)
- ML23229A501 + ((Cover Letter Only) Rndt, Inc. - NRC Inspection Report No. 03038850/2023001 and Notice of Violation)
- ML23111A066 + ((Cover Letter Only) Wolf Creek Generating Station – Special Inspection Reactive Report 05000482-20220502)
- CP-200900846, (Cpes) - Request to Delay the Code of Record for the Unit 1 Inservice Inspection (ISI) Program + ((Cpes) - Request to Delay the Code of Record for the Unit 1 Inservice Inspection (ISI) Program)
- CP-202100224, (Cpnpp), 2020 Annual Environmental Operating Report (Non-Radiological) + ((Cpnpp), 2020 Annual Environmental Operating Report (Non-Radiological))
- CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report + ((Cpnpp), 2022 Annual Radiological Effluent Release Report)
- CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report + ((Cpnpp), 2022 Annual Radiological Environmental Operating Report)
- CP-202400134, (Cpnpp), 2023 Annual Environmental Operating Report (Non-Radiological) + ((Cpnpp), 2023 Annual Environmental Operating Report (Non-Radiological))
- CP-202300098, (Cpnpp), Annual Report of Changes in Peak Cladding Temperature + ((Cpnpp), Annual Report of Changes in Peak Cladding Temperature)
- CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown + ((Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown)
- CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program + ((Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program)
- 05000445/LER-2023-001-01, (Cpnpp), Automatic Reactor Trip Due to Lo-Lo Steam Generator Level + ((Cpnpp), Automatic Reactor Trip Due to Lo-Lo Steam Generator Level)
- 05000446/LER-2025-001, (Cpnpp), Containment Spray Pump Declared Inoperable Due to Misaligned Breaker + ((Cpnpp), Containment Spray Pump Declared Inoperable Due to Misaligned Breaker)
- CP-202400424, (Cpnpp), Core Operating Limits Report (Colr), Unit 2 Cycle 22, (ERX-24-001, Revision 0) + ((Cpnpp), Core Operating Limits Report (Colr), Unit 2 Cycle 22, (ERX-24-001, Revision 0))
- CP-201400209, (Cpnpp), Docket No. 50-445, Request for Schedule Relaxation for the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + ((Cpnpp), Docket No. 50-445, Request for Schedule Relaxation for the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ML24212A249 + ((Cpnpp), Fire Protection Report, Revision 34 - Redacted)
- CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) + ((Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20))
- CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 + ((Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2)
- CP-202000460, (Cpnpp), License Renewal Application Submittal Schedule Revision + ((Cpnpp), License Renewal Application Submittal Schedule Revision)
- CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality + ((Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality)
- EPID:L-2024-LLR-0053 + ((Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality)
- CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 + ((Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026)
- 05000445/LER-2022-001, (Cpnpp), Reactor Trip Due to Turbine Trip Greater than 50% Power + ((Cpnpp), Reactor Trip Due to Turbine Trip Greater than 50% Power)
- CP-202200435, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters + ((Cpnpp), Registration of Dry Spent Fuel Storage Canisters)
- CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters + ((Cpnpp), Registration of Dry Spent Fuel Storage Canisters)
- CP-200800927, (Cpnpp), Relief Request B-8 for Unit 1 Second 10 Year ISI Interval & B-6 for Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Requirements for Reactor Vessel Hot & Cold Leg Nozzle Weld Examinations (Unit 1 Second Interval Start + ((Cpnpp), Relief Request B-8 for Unit 1 Second 10 Year ISI Interval & B-6 for Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Requirements for Reactor Vessel Hot & Cold Leg Nozzle Weld Examinations (Unit 1 Second Interval Start)
- CP-202200454, (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 . + ((Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .)
- EPID:L-2023-LLA-0058 + ((Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .)
- CP-201201332, (Cpnpp), Request for Extension of Enforcement Discretion for Multiple Spurious Operation Circuit Interactions Resolution + ((Cpnpp), Request for Extension of Enforcement Discretion for Multiple Spurious Operation Circuit Interactions Resolution)
- CP-202500052, (Cpnpp), Response to Request for Additional Information on Proposed Inservice Inspection Impracticality Request Nos. B-1, B-4, C-1 and C-2 for the CPNPP U-2 Third Ten-Year Isi Interval + ((Cpnpp), Response to Request for Additional Information on Proposed Inservice Inspection Impracticality Request Nos. B-1, B-4, C-1 and C-2 for the CPNPP U-2 Third Ten-Year Isi Interval)
- TXX-2304, (Cpnpp), Response to Request for Information for Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002 + ((Cpnpp), Response to Request for Information for Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002)
- CP-201200012, (Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent .. + ((Cpnpp), Revision to Technical Specification (TS) 5.5.9, Unit 1 D76 and Unit 2 D5 Steam Generator (SG) Program, and TS 5.6.9, Unit 1 D76 and Unit 2 D5 Steam Generator Tube Inspection Report, for a Permanent ..)
- 05000446/LER-2025-002, (Cpnpp), Safety Chiller Inoperable Due to Failure of Copper Refrigerant Fittings + ((Cpnpp), Safety Chiller Inoperable Due to Failure of Copper Refrigerant Fittings)
- CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation + ((Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation)