- EPID:L-2022-LRO-0065 + ((CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report)
- 05000446/LER-2014-003-01, (CPNPP) Unit 2 Regarding Two Pressurizer Safety Valves As-Found Lift Settings Found Outside Technical Specification Limits + ((CPNPP) Unit 2 Regarding Two Pressurizer Safety Valves As-Found Lift Settings Found Outside Technical Specification Limits)
- CP-201001353, (CPNPP) Unit 2, Transmittal of Unit 2 Reactor Vessel Surveillance Capsule W Analysis Report + ((CPNPP) Unit 2, Transmittal of Unit 2 Reactor Vessel Surveillance Capsule W Analysis Report)
- CP-202100150, (CPNPP) Units 1 & 2 - Inservice Testing Plan for Pumps & Valves Third Interval, Revision 4 + ((CPNPP) Units 1 & 2 - Inservice Testing Plan for Pumps & Valves Third Interval, Revision 4)
- CP-201100747, (CPNPP) Units 1 and 2, Report of Changes to the Physical Security Plan (Revision 6) + ((CPNPP) Units 1 and 2, Report of Changes to the Physical Security Plan (Revision 6))
- CP-201800248, (CPNPP) and Independent Spent Fuel Storage Fuel Storage Installation (ISFSI) - Registration of Dry Spent Fuel Storage Canisters + ((CPNPP) and Independent Spent Fuel Storage Fuel Storage Installation (ISFSI) - Registration of Dry Spent Fuel Storage Canisters)
- CP-201301175, (CPNPP) and Independent Spent Fuel Storage Installation (ISFSI) Registration of Dry Spent Fuel Storage Canister + ((CPNPP) and Independent Spent Fuel Storage Installation (ISFSI) Registration of Dry Spent Fuel Storage Canister)
- CP-201301247, (CPNPP) and Independent Spent Fuel Storage Installation (Isfsi), Registration of Dry Spent Fuel Storage Canister + ((CPNPP) and Independent Spent Fuel Storage Installation (Isfsi), Registration of Dry Spent Fuel Storage Canister)
- CP-201200521, (CPNPP) and Independent Spent Fuel Storage Installation (Isfsi), Registration of Dry Spent Fuel Storage Canister + ((CPNPP) and Independent Spent Fuel Storage Installation (Isfsi), Registration of Dry Spent Fuel Storage Canister)
- CP-201600987, (CPNPP) and Independent Spent Fuel Storage Installation (ISFSI) - Registration of Dry Spent Fuel Storage Canisters + ((CPNPP) and Independent Spent Fuel Storage Installation (ISFSI) - Registration of Dry Spent Fuel Storage Canisters)
- TXX-0702, (CPSES) - 10CFR50.59 Evaluation Summary Report 0013 and Commitment Material Change Evaluation Report 0007 + ((CPSES) - 10CFR50.59 Evaluation Summary Report 0013 and Commitment Material Change Evaluation Report 0007)
- CPSES-200500331, (CPSES) - Guarantees of Payment of Deferred Premiums + ((CPSES) - Guarantees of Payment of Deferred Premiums)
- CPSES-200300095, (CPSES) - License Amendment Request (LAR) 03-01, Revision to Technical Specification (TS) Bases + ((CPSES) - License Amendment Request (LAR) 03-01, Revision to Technical Specification (TS) Bases)
- CPSES-200300305, (CPSES) - Relief Request B-2 & C-4 for Unit 1 Inservice Inspection (ISI) from 1986 Edition of ASME Code, Section XI, No Addenda Interval Start Date: August 14, 2000, Second Interval) + ((CPSES) - Relief Request B-2 & C-4 for Unit 1 Inservice Inspection (ISI) from 1986 Edition of ASME Code, Section XI, No Addenda Interval Start Date: August 14, 2000, Second Interval))
- CP-200900530, (CPSES) - Submittal of the Annual Non-Radiological Environmental Operating Report for 2008 + ((CPSES) - Submittal of the Annual Non-Radiological Environmental Operating Report for 2008)
- CP-200900980, (CPSES) - Supplement to License Amendment Request (LAR) 09-006 to Provide Updated Information + ((CPSES) - Supplement to License Amendment Request (LAR) 09-006 to Provide Updated Information)
- CPSES-200302094, (CPSES) Change of Primary Addressee for Correspondence + ((CPSES) Change of Primary Addressee for Correspondence)
- 05000445/LER-2004-001, (CPSES) Condition Prohibited by Technical Specifications + ((CPSES) Condition Prohibited by Technical Specifications)
- ML050970261 + ((CPSES) Decommissioning Report)
- CPSES-200402477, (CPSES) License Amendment Request (LAR) 04-013 Revision to Technical Specification (TS) 3.7.5 Auxiliary Feedwater (AFW) System + ((CPSES) License Amendment Request (LAR) 04-013 Revision to Technical Specification (TS) 3.7.5 Auxiliary Feedwater (AFW) System)
- CPSES-200500919, (CPSES) License Amendment Request (LAR) 05-002, Revision to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr) + ((CPSES) License Amendment Request (LAR) 05-002, Revision to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr))
- CPSES-200502016, (CPSES) Notification of Transfer of Corporate Assets + ((CPSES) Notification of Transfer of Corporate Assets)
- CPSES-200500856, (CPSES) Nuclear Liability Insurance + ((CPSES) Nuclear Liability Insurance)
- CPSES-200500835, (CPSES) Submittal of Unit 2, Cycle 9 Core Operating Limits Report + ((CPSES) Submittal of Unit 2, Cycle 9 Core Operating Limits Report)
- CPSES-200501020, (CPSES) Submittal of the Annual Non-Radiological Environmental Operating Report for 2004 + ((CPSES) Submittal of the Annual Non-Radiological Environmental Operating Report for 2004)
- CPSES-200301065, (CPSES) Transmittal of Revised Emergency Plan Procedures + ((CPSES) Transmittal of Revised Emergency Plan Procedures)
- CPSES-200201244, (CPSES) Transmittal of the Annual Radiological Environmental Operating Report for 2001 + ((CPSES) Transmittal of the Annual Radiological Environmental Operating Report for 2001)
- TXX-0408, (CPSES) Unit 1, Technical Specification Reports for Steam Generators Meeting C-3 Category and 15-day Tube Plugging and Repair + ((CPSES) Unit 1, Technical Specification Reports for Steam Generators Meeting C-3 Category and 15-day Tube Plugging and Repair)
- CPSES-200301113, (CPSES) Units 1 & 2 License Amendment Request (LAR) 03-02 Revision to Technical Specifications Regarding Emergency Core Cooling System Accumulators + ((CPSES) Units 1 & 2 License Amendment Request (LAR) 03-02 Revision to Technical Specifications Regarding Emergency Core Cooling System Accumulators)
- CPSES-200402318, (CPSES) Units 1 and 2, Response to NRC Generic Letter 2004-01; Requirements for Steam Generator Tube Inspections + ((CPSES) Units 1 and 2, Response to NRC Generic Letter 2004-01; Requirements for Steam Generator Tube Inspections)
- CPSES-200202716, (CPSES)-Unit 2, Submittal of Unit 2 Sixth Refueling Outage (2RFO6) Inservice Inspection (ISI) Summary Report + ((CPSES)-Unit 2, Submittal of Unit 2 Sixth Refueling Outage (2RFO6) Inservice Inspection (ISI) Summary Report)
- ML25156A240 + ((CR3) Nuclear Generating Plant Partial Site Release (Psr) License Amendment Request (LAR) Audit Topics)
- ML080520487 + ((Cancelled) Notice of Forthcoming Meeting with Boiling Water Reactors Owners Group (BWROG) to Discuss Proposed Limitations and Conditions for Approval of Topical Report NEDO-33148, Separation of Loss of Offsite Power from Large Break Loca)
- ML15124A699 + ((Catawba 1 and 2) - Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section X1, for Inservice Inspection Activities)
- ML072840202 + ((Catawba 1) Regarding Operating Report for Cycle 16 Operating with Mixed Oxide Fuel Lead Assemblies TAC MD4670))
- ML13084A218 + ((Catawba) - Review of the 2012 Steam Generator (SG) Tube Inspections During Refueling Outage 18 End-of-Cycle (EOC 18))
- ML082890098 + ((Catawba); McGuire Nuclear Station, Units 1 and 2 (Mcguire); Oconee Nuclear Station, Units 1, 2, and 3 (Oconee)- Closeout of Generic Letter 2007-01 Inaccessible of Underground Power Cable Failures That Disable Accid)
- ML043620372 + ((Ccnpp 1 and 2) - Request for Additional Information Bulletin 2004-01 (TAC Nos. MC3466 and MC3467.))
- ML043490418 + ((Ccnpp 1 and 2), RAI, Incorporating Core Operating Limits Analytical Methodology References Into Technical Specifications (Tac Nos. MC4019 and MC4020))
- ML102170027 + ((Ccnpp), Units 1 and, R.E. Ginna Nuclear Power Plant (Ginna), Nine Mile Point Nuclear Plant (Nmpns), Units 1 & 2-Acceptance of Requested Cyber Security Plan (Tac ME4328, ME4329, ME4330, ME4331, ME4332))
- ML101590113 + ((Cegp), RAI Regarding Generic Letter (GL) 2008-01, Managing Gas Accumulation in Emergency Core Cooking, Decay Heat Removal, and Containment Spray Systems (GL 2008-01), (TAC MD7892 & MD7893))
- ML14009A227 + ((Closed) - Indian Point - Notice of Licensee Meeting/Pre-Decisional Enforcement Conference - 1/22/2014)
- 05000446/LER-2013-001, (Cnpnpp) Regarding Unit 2 Hot Shutdown Panel Transfer Switch Inoperable Due to Wiring Error + ((Cnpnpp) Regarding Unit 2 Hot Shutdown Panel Transfer Switch Inoperable Due to Wiring Error)
- ML14107A300 + ((Cns), Unit 2 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident)
- RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System + ((Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System)
- RA-18-0097, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System + ((Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System)
- CNS-18-023, (Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System + ((Cns), Units 1 and 2 - Response to NRC Requests for Additional Information (Rais) License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System)
- RA-18-0199, (Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis + ((Cns), Units 1 and 2 - Submittal of Evacuation Time Estimates (ETE) Analysis)
- ML050600307 + ((Cns), Units 1 and 2, Response to a RAI for Technical Specification (TS) Amendment to Section 3.6.3, Containment Isolation Valves and the Associated Bases Section)
- ML110960432 + ((Cns), Units 1 and 2, Supplement for License Amendment Request to Revise Technical Specification (TS) 3.3.2, Engineer Safety Feature Actuation System Instrumentation Removal of the Superceded TS and Bases Requirements)
- PMNS20180873, (Copied from E. Millers meeting- Update All Fields!) + ((Copied from E. Millers meeting- Update All Fields!))