Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000331/2016002 +
- IR 05000354/2016002 +
- IR 05000335/2016011 +
- IR 05000454/2016007 +
- IR 05000220/2016002 +
- IR 05000277/2016002 +
- CAC:MF0716 +
- ML16221A671 +
- ML16221A612 +
- JAFP-16-0126, Submittal of Emergency Plan Updates +
- ML16218A390 +
- ML16221A680 +
- TAC:MF7541 +
- ML16235A241 +
- ML16301A023 +
- TAC:MF7585 +
- ML16208A283 +
- ML16223A773 +
- L-16-247, Spent Fuel Storage Cask Registration +
- ML16222A913 +
- ML16223A417 +
- ML16222B014 +
- ML16221A580 +
- ML16221A582 +
- ML16221A579 +
- ML17094A211 +
- ML16224A018 +
- LIC-16-0058, Intent to Comply with ASME Code Case N-729-1, Alternative Examination Requirements for PWR Reactor Vessel Upper Heads with Nozzles Having Pressure-Retaining Partial-Penetration Welds Section XI, Division 1, as Written +
- L-16-195, Steam Generator Tube Circumferential Crack Report - Spring 2016 Refueling Outage +
- CNL-16-122, Response to Apparent Violations in NRC Inspection Report 05000260/2016012 and Investigation Report No. 2-2015-008, EA-16-009 +
- NL-16-1051, Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) +
- NL-16-1050, Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) +
- NL-16-1049, Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) +
- DCL-16-081, PPS Seismic Qualification +
- ML16221A354 +
- Press Release-16-048, NRC Names David Nelson as Chief Information Officer +
- 05000324/LER-2016-002-01, For Brunswick Steam Electric Plant Unit 1 Regarding Emergency Diesel Generator 3 Inoperable Due to Failure to Auto-Start +
- 05000324/LER-2016-001, Regarding Mispositioned Valves Result in Residual Heat Removal Service Water System Lnoperability +
- ML16221A712 +
- HNP-16-056, Response to Second Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the a Emergency Service Water Pump Replacement +
- 05000390/LER-2016-010, Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado +
- ML16224A240 +