MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000369/20220042023-01-30030 January 2023 Mcguire Nuclear Station - Integrated Inspection Report 05000369/2022004 and 05000370/2022004 IR 05000369/20224202023-01-11011 January 2023 Security Baseline Inspection Report 05000369/2022420 and 05000370/2022420 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-02-02
[Table view] Category:Safety Evaluation
MONTHYEARML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22290A1012022-11-29029 November 2022 Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22213A2532022-08-31031 August 2022 Authorization and Safety Evaluation for Alternative Request RA-21-0144 to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 ML22007A3452022-01-11011 January 2022 Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21306A1592021-11-16016 November 2021 Request to Use Provisions of Later Edition and Addenda of the ASME Code, Section XI (EPID; L-2021-LLR-0048) ML21266A0112021-10-0505 October 2021 Staff Evaluation Related to Aging Management Program and Inspection Plan of Reactor Vessel Internals Per MRP-227, Revision 1-A ML21253A0822021-09-20020 September 2021 Proposed Alternative Request RA-21-0145 to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method ML21155A2132021-08-26026 August 2021 Plant ML21131A0262021-06-23023 June 2021 Issuance of Amendments to Change Technical Specification 3.8.1, to Reduce Emergency Diesel Generator Maximum Voltage ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20230A2052020-08-21021 August 2020 Relief Request RA-20-0031, Delay to Update the Code of Record for Inservice Inspection ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20174A0452020-08-0404 August 2020 Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits ML19296D1192020-01-31031 January 2020 Issuance of Amendment Nos. 305 and 301 to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19212A6552019-08-27027 August 2019 Issuance of Amendment Nos. 304 and 300 to Technical Specification 3.8.1, AC Sources - Operating ML19217A3242019-08-14014 August 2019 Relief Request MC-SRV-NC-03, Alternate Testing for Pressurizer Power Operated Relief Valve Block Valve 2NC-35B ML19184A5852019-08-0808 August 2019 Issuance of Amendment Nos. 316 and 295 to Correct Editorial Error in Technical Specification 3.0 and Remove Expired Footnotes from TS 3.5.2, 3.6.6, 3.7.5, 3.7.6, 3.7.7, 3.7.9, 3.7.11, 3.8.1, and 3.8.4 ML19191A0612019-07-15015 July 2019 Review of the Steam Generator Tube Inservice Inspection Report for the Fall 2018 Refueling Outage 24 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19126A0302019-06-28028 June 2019 Issuance of Amendments to Technical Specification 3.8.1, AC Sources-Operating ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML19121A5512019-06-17017 June 2019 Issuance of Amendments Related to the Removal of Containment Valve Injection Water System Supply from Specified Containment Isolation Valves ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML19091A1942019-04-17017 April 2019 Safety Evaluation Input for License Amendment Request to Revise the Technical Specifications 3.8.1, AC Sources - Operating. ML18355A6102019-01-25025 January 2019 Issuance of Amendments to Revise the Licensing Basis for Protection from Tornado Generated Missiles ML18318A3582019-01-16016 January 2019 Issuance of Amendment Nos. 311 and 290 to Correct Non-Conservative Technical Specification 3.4.11, Pressurizer Power Operated Relief Valves Porvs) ML18275A2782018-11-28028 November 2018 Issuance of Amendments Related to the Nuclear Service Water System New Condition for Single Pond Return Header Configuration ML18277A3222018-11-19019 November 2018 Issuance of Amendments 310 and 289 to Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18009A8422018-01-31031 January 2018 Issuance of Amendments to Extend the Containment Type a Leak Rate Test Frequency to 15 Years and Type C Leak Rate Test Frequency to 75 Months (CAC Nos. MF9020 and MF9021; EPID L-2016-LLA-0032) ML18016A1782018-01-24024 January 2018 Request for Relief No. 17-CN-001, Regarding Category B-J Pressure Retaining Welds for the Third 10-Year Inservice Testing Interval (CAC Nos. MF9807 and MF9808; EPID L-2017-LLA-0032) ML17297A9172018-01-0505 January 2018 Issuance of Amendments Adopting Technical Specifications Task Force Traveler TSTF-197-A, Revision 2 (CAC Nos. MF9110 and MF9111; EPID L-2017-LLA-0161) ML17296A2082018-01-0404 January 2018 Issuance of Amendments Adopting Technical Specifications Task Force Traveler TSTF-197-A, Revision 2 (CAC Nos. MF8971 & MF8972, EPID L-2016-LLA-0026) ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads 2023-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 8, 2016 Mr. John Eltnisky Senior Vice President Governance, Projects and Engineering Duke Energy Carolinas, LLC P.O. Box 1006 Mail Code EC07H Charlotte, NC 28201-1006
SUBJECT:
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, AND CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - CORRECTION TO ISSUANCE OF AMENDMENTS REGARDING USE OF OPTIMIZED ZIRLO' (CAC NOS. MF6631, MF6632, MF6633, AND MF6634)
Dear Mr. Eltnisky:
By letter dated June 21, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16105A326), the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment Nos. 288 and 267 for the McGuire Nuclear Station (MNS), Units 1 and 2, respectively, and License Amendment Nos. 284 and 280 for the Catawba Nuclear Station (CNS), Units 1 and 2, respectively. The amendments consisted of changes to the technical specifications (TSs) and facility operating licenses in response to your application dated August 20, 2015.
The amendments revised TS 4.2.1, "Fuel Assemblies," and TS 5.6.5. b, "Core Operating Limits Report (COLR)," to allow the use of Optimized ZIRLO' fuel cladding material in both CNS, Units 1 and 2, and MNS, Units 1 and 2. Additionally, the amendments modified TS 5.6.5.b to add associated methodologies for determining the limits in the COLR. These amendments were also supported by an exemption from certain requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," and 10 CFR 50, Appendix K, "ECCS Evaluation Models," for both CNS, Units 1 and 2, and MNS, Units 1 and 2. The approval was in response to Duke Energy Carolinas, LLC (Duke Energy, the licensee), LAR dated August 20, 2015 (ADAMS Accession No. ML15295A016).
Subsequent to issuing the amendments, an error was identified on page 9 of the safety evaluation (SE). Specifically, the NRC staff review in SE Section 3.1.3, "Thermal-Hydraulic Design, Transients, and Accidents Methodology," contained an error that cites incorrect information. Duke Energy did not use WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," but instead used DPC-NE-3000-PA, "Thermal-Hydraulic Transient Analysis Methodology"; DPC-NE-3001-PA, "Multidimensional Reactor Transients and Safety Analysis Physics Parameter Methodology"; and DPC-NE-3002-A, "UFSAR Chapter 15 System Transient Analysis Methodology." We have enclosed corrected pages 9, 10, and 13 of the SE dated June 21, 2016, to address this error. Please note that page 10 changed due to added text on page 9, and page 13 changed due to updated references. The areas of change are marked with revision bars in the margin on the corrected pages.
J. Eltnisky This administrative error on the part of the NRC does not affect the NRC staff's overall conclusions associated with the approval of the MNS, Units 1 and 2, License Amendment Nos. 288 and 267, respectively, and CNS, Units 1 and 2, License Amendment Nos. 284 and 280, respectively. This change is within the scope of the application as originally noticed in the Federal Register on November 24, 2015 (80 FR 73236).
If you have any questions, please contact me at 301-415-2481 or Ed.Miller@nrc.gov.
Sincerely,
~ 0vvl .for G. Edward Miller, Project Manager Plant Licensing 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369, 50-370, 50-413, and 50-414
Enclosure:
Corrected Pages to Safety Evaluation dated June 21, 2016 cc w/enclosure: Distribution via Listserv
ENCLOSURES Corrected Pages to Safety Evaluation dated June 21, 2016
Optimized ZIRLO' strengths will saturate at the same properties as standard ZIRLO at 12 x 1021 n/cm 2 .
- a. For the CE fuel design analyses, the measured, unirradiated Optimized ZIRLO' strengths shall be used for all fluence levels (consistent with previously approved methods).
Duke Energy stated that future analysis of Optimized ZIRLO' will use the yield strength and ultimate tensile strength as modified per Conditions a.a.i, a.a.ii, and a.a.iii, until such time as the irradiated data for Optimized ZIRLO' cladding strengths have been collected and accepted by the NRC and that this is confirmed as part of the normal reload design process as required by the methodologies listed in TS 5.6.5.b. Therefore, the NRC staff concludes that this condition and limitation is satisfied.
CNS and MNS use a Westinghouse fuel design and, therefore, Condition and Limitation a.b does not apply.
3.1.2.9 Condition and Limitation 9 - LOCBART or STRIKIN-11 Early Peak Cladding Temperature (PCT)
Condition and Limitation 9 states that as discussed in response to RAI #21 (Reference 3), for plants introducing Optimized ZIRLO' that are licensed with LOCBART or STRIKIN-11 and have a limiting PCT that occurs during blowdown or early reflood, the limiting LOCBART or STRIKIN-11 calculation will be rerun using the specified Optimized ZIRLO' material properties.
Although not a condition of approval, the NRC staff strongly recommends that, for future evaluations, Westinghouse update all computer models with Optimized ZIRLO' specific material properties. CNS and MNS are not licensed with LOCABART of STRIKIN-11. Therefore, the NRC staff concludes that this condition and limitation does not apply.
3.1.2.10 Condition and Limitation 10 - Locked Rotor PCT Condition and Limitation 10 states that due to the absence of high temperature oxidation data for Optimized ZIRLO', the Westinghouse coolability limit on PCT during the locked rotor event shall be maintained within the proprietary limits included in the topical report and proprietary version of the SE.
Duke Energy does not use a PCT limit for the locked rotor event, but instead uses a core cooling capability analyses, which determines to what extend fuel cladding integrity is comprised by calculating the number of fuel rods that exceed the 95/95 departure from nucleate boiling ratio limit. Therefore, the NRC staff concludes that this condition and limitation does not apply.
3.1.3 Thermal-Hydraulic Design. Transients. and Accidents Methodology Duke Energy will transition to Optimized ZIRLO' using the same thermal-hydraulic analysis and transients and accident (non-LOCA) analyses described in DPC-NE-3000, 3001, and 3002 (References 20, 21, and 22), which are currently approved for use at CNS and MNS, as listed in TS 5.6.5, "Core Operating Limits Report." The current methods remain valid for Optimized ZIRLO' transition cores, as they are consistent with the methods described in WCAP-12610-P-A. This process is valid for all resident fuel designs licensed for CNS and
MNS, and the transition has no impact on both non-LOCA and LOCA analyses methodologies at CNS and MNS. Therefore, the NRC staff concludes that these methods are acceptable.
3.1.4 Technical Conclusion Based upon the NRC staff's prior approval of Optimized ZIRLO', the licensee's compliance with the SE conditions and limitations through inclusion of the topical reports into the TSs, and the licensees use of NRC-approved methodologies in TS 5.6.5.b for thermal-hydraulic transients and accidents analyses to ensure that the operating limits will be appropriate, the NRC staff finds the proposed changes to TS 4.2.1 and TS 5.6.5 to allow the use of Optimized ZIRLO' acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the North Carolina and South Carolina State officials were notified of the proposed issuance of the amendments. The State officials had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding 80 FR 73236. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. Duke Energy, R. T. Repko letter to U.S. NRC, "License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized ZIRLO' Fuel Rod Cladding," RA-15-0020, August 20, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15295A016).
- 19. Westinghouse, letter from J. A Gresham to U.S. NRC, "SER Compliance of WCAP-12610-P-A & CENPD-404-P-A Addendum 1-A 'Optimized ZIRLO,"
LTR-NRC-08-60, December 30, 2008 (ADAMS Accession No. ML090080380).
- 20. DPC-NE-3000-PA, Revision 3, "Thermal-Hydraulic Transient Analysis Methodology,"
(September 2004) (ADAMS Package Accession No. ML050680273 (non-public)
(proprietary)).
- 21. DPC-NE-3001-PA, "Multidimensional Reactor Transients and Safety Analysis Physics Parameter Methodology," October 2013 (ADAMS Accession No. ML133258143 (non-public) (proprietary)).
- 22. DPC-NE-3002-A, Revision 4b, "UFSAR Chapter 15 System Transient Analysis Methodology," September 2010 (ADAMS Accession No. ML16102A159).
Principal Contributor: Joshua Kaizer Date: June 21, 2016
ML16208A283 OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA NRR/DORL/LPL4-2/BC NRR/DORL/LPL4-2/PM NAME GMiller (MOrenak for) LRonewicz (RMartin for) MMarkley (MOrenak for) GMiller DATE 7/27/2016 8/01/2016 8/01/2016 8/08/2016