Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17312A171 +
- ML17312A120 +
- ML17312A115 +
- Press Release-96-085, the Nuclear Regulatory Commission Has Received the Attached Report from Its Advisory Committee on Reactor Safeguards +
- Press Release-IV-96-041, NRC Proposes to Fine University of Oklahoma $2,500 for Leaving Radioactive Drugs Unattended +
- ML17300B265 +
- ML17300B263 +
- ML20117N696 +
- ML20117N690 +
- ML20117N647 +
- ML20117N640 +
- ML20117N636 +
- ML20117N631 +
- ML20114E773 +
- ML20113B358 +
- ML20113A528 +
- ML20113A516 +
- ML20113A180 +
- ML20113A022 +
- ML20112J683 +
- ML20112J144 +
- ML20147C259 +
- ML20134C176 +
- ML20129G929 +
- ML20113A011 +
- RC-96-0157, Part 21 Rept Re Nozzle Weld Defects in Chemical & Vol Control Sys Connections at RCP Seal Injection Nozzles & Ccws Connections at RCP Thermal Barrier Heat Exchanger Inlet & Outlet Nozzles Supplied by W +
- RBG-43019, Forwards Response to Exercise Weaknesses Noted Insp Rept 50-458/96-07 on 960415-19.Corrective Actions:Results of Exercise Reviewed W/Emergency Response Organization Members & Being Reviewed W/Operations Crews +
- RC-96-0152, Special Rept (Spr 960005):on 960512,Channel B EFW Flow Indications for Accident Monitoring Declared Inoperable Due to Incorrect Calibr Range for Flow Transmitters.Replacement Transmitters Not Arrive on Site Until Aug 1996 +
- NSD-NRC-96-4737, Forwards WCAP-13383 Rev 1 Describing AP600 Instrumentation & Control Hardware & Software Validation & Process.Document Closes Open Item Tracking Sys Items 1038 & 1039 for AP600 Design Certification Project Dser Chapter 7 +
- RC-96-0154, Comment on DRG,DG-5007,re Proposed Rev 3 to RG 5.44 +
- BECO-LTR-96-057, Forwards Response to NRC 40500 Team Insp Rept 50-293/96-80 Conducted on 960122-0209 +
- RBG-42988, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/96-01.C/A:sys Engineer Discussed Issue W/Ge Technician to Determine Which Steps Actually Performed & Review of PM Work Instruction Writers Guide Performed +
- 05000352/LER-1996-012, :on 921103,identified Improper Fuse Sizing. Caused by Personnel Error.Approved Design Change Re Proper Fuse Coordination & Reviewed Modifications Associated W/Fuse Ratings +
- 05000277/LER-1995-006, :on 951022,offsite Electrical Power Source Lost.Caused by Momentary Deenergization of Several Electrical Distribution Panels.Isolation Logics Reset & Affected Sys Restored +
- 05000293/LER-1996-007, :on 960519,LCO for Operation for Switchyard Battery Exceeded Tech Spec.Caused by Personnel Error.Revised Procedure 8.9.8.4 & Revised Master Surveillance Tracking Program Nodes +
- 05000458/LER-1996-011, :on 960516,personnel Error Resulted in Missed Surveillance & Dry Floor Drain Sump Leakage Detection Monitoring Instrumentation Exceeded TS Allowed Outage Times. Appropriate Disciplinary Actions Taken +
- 05000282/LER-1996-009, :on 960517,surveillance Revealed Three of Four Sensors Could Not Be Calibr Without Entering Containment. Caused by Filling Calibr Gas Bottles After Adjusting Regulator Output Pressure +
- ML20112J327 +
- 05000425/LER-1996-002-02, :on 960528,rod Positions Not Verified for Inoperable Rod Position Deviation Monitor.Caused by Misleading Procedure.Procedure 17010-2 Clarified +
- 05000382/LER-1996-006-01, :on 960517,reactor Trip Occurred.Caused by Failed Component & Original Design Inadequacies.Replaced Both Motor/Generator (M/G) Set Overvoltage Relays & Replaced a M/G Set Voltage Regulator +
- 05000382/LER-1996-007-01, :on 960411,discovered That Design Basis Flow Rates Could Not Be Achieved on Auxiliary Component Cooling Water Sys.Caused by Inadequate Design.Modified Sys Design & Reviewed Other safety-related Fluid Systems +
- 05000424/LER-1996-006-01, :on 960525,reactor Trip Occurred Due to Blown Fuse in Isolation Valve.Fuse Replaced & Unit Restarted & Returned to Power.Analysis of Failed Fuse Expected to Be Completed by 960628 +
- ML20113A598 +
- ML20129K394 +
- ML20113A592 +
- ML20136A781 +
- ML20112J336 +
- ML20135D258 +
- 05000316/LER-1996-006, :on 960223,Train B PORV Declared Inoperable. Caused by Result of Water Related Degradation of Kapton Insulation on Conductors.Feedthrough 2 in Penetration 2-CEP-4CI Replaced +
- 05000244/LER-1996-005, :on 960516,PORC Determined Deficient Procedures Do Not Meet SRs for Testing safety-related Logic Circuits. Caused by Inadequancies in Individual Testing Procedures. Procedures Re Improved TSs Revised +