Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LR-N04-0341, First Revised NRC Order EA-03-009: Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Post Outage Inspection Results +
- ML20077B093 +
- RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 4.0, Reactor +
- ML20137L336 +
- ML20082N974 +
- RC-12-0173, Technical Basis for Westinghouse Embedded Flaw Repair for V. C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles +
- ML041190161 +
- ML18151A723 +
- ML20215K647 +
- IR 05000482/2022004 +
- ML11257A261 +
- LIC-05-0057, Revised Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors +
- ML13239A073 +
- IR 05000528/1981020 +
- IR 05000269/1992016 +
- ML12319A255 +
- ML18152A080 +
- 05000305/LER-1986-009, :on 860513,local Leak Rate Test Procedure for Station Air to Containment Penetration 19 Found Inadequate to Separately Quantify Inboard & Outboard Isolation Valve Type-C Leakages.Caused by Drawing Error +
- 05000334/LER-1983-023-03, /03L-0:on 830910,during Performance of Bvt 1.1-1.47.4 & 1.3-1.47.5 Discovered Valves & Flanges W/ Unacceptable Leakage.Caused by Inability to Hold Applied Pressure.Valves/Flanges Replaced +