Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Automatic Switch Co + (Automatic Switch Co)
- Automatic Valve Corp + (Automatic Valve Corp)
- NRC Generic Letter 84-03, Availability of NUREG-0933, "A Prioritization of Generic Safety Issues" + (Availability of NUREG-0933, "A Prioritization of Generic Safety Issues")
- NRC Generic Letter 83-44, Availability of NUREG-1021, "Operator Licensing Examiner Standards" + (Availability of NUREG-1021, "Operator Licensing Examiner Standards")
- NRC Generic Letter 86-17, Availability of NUREG-1169, "Technical Findings Related to Generic Issue C-8, BWR MSIC Leakage and Treatment Methods" + (Availability of NUREG-1169, "Technical Findings Related to Generic Issue C-8, BWR MSIC Leakage and Treatment Methods")
- NRC Generic Letter 84-19, Availability of Supplement 1 to NUREG-0933, "A Prioritization of Generic Safety Issues" + (Availability of Supplement 1 to NUREG-0933, "A Prioritization of Generic Safety Issues")
- NRC Generic Letter 86-08, Availability of Supplement 4 to NUREG-0933, "A Prioritization of Generic Safety Issues" + (Availability of Supplement 4 to NUREG-0933, "A Prioritization of Generic Safety Issues")
- NRC Generic Letter 85-17, Availability of Supplements 2 and 3 to NUREG-0933, "A Prioritization of Generic Safety Issues" + (Availability of Supplements 2 and 3 to NUREG-0933, "A Prioritization of Generic Safety Issues")
- 10 CFR 2.1303, Availability of Documents + (Availability of documents)
- 10 CFR 51.120, Availability of Environmental Documents for Public Inspection + (Availability of environmental documents for public inspection)
- 10 CFR 2.1003, Availability of Material + (Availability of material)
- 10 CFR 9.15, Availability of Records + (Availability of records)
- Avera McKennan Hospital + (Avera McKennan Hospital)
- 10 CFR 170.20, Average Cost Per Professional Staff-Hour + (Average cost per professional staff-hour)
- EPID:L-2018-RNW-0012 + (Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing)
- Avneesh Arya + (Avneesh Arya)
- H.12 + (Avoid Complacency)
- 10 CFR 12.108, Awards Against Other Agencies + (Awards against other agencies)
- IP 60858, Away-From-Reactor Independent Spent Fuel Storage Installation Inspection Guidance + (Away-From-Reactor Independent Spent Fuel Storage Installation Inspection Guidance)
- Ayanna Rice + (Ayanna Rice)
- Ayesha Athar + (Ayesha Athar)
- Ayoola Daramola + (Ayoola Daramola)
- B Bollinger + (B Bollinger)
- B Dionne + (B Dionne)
- B Palagi + (B Palagi)
- B080 + (Barton Instrument)
- Category:Letter type:BSEP + (BSEP)
- Category:Letter type:BVY + (BVY)
- NRC Generic Letter 80-03, BWR Control Rod Failures + (BWR Control Rod Failures)
- NRC Generic Letter 81-11, BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking (NUREG-0619) + (BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking (NUREG-0619))
- NRC Generic Letter 79-38, BWR Off-Gas Systems – Enclosing NUREG/CR-0727 + (BWR Off-Gas Systems – Enclosing NUREG/CR-0727)
- NRC Generic Letter 80-107, BWR Scram Discharge System + (BWR Scram Discharge System)
- NRC Generic Letter 81-09, BWR Scram Discharge System + (BWR Scram Discharge System)
- NRC Generic Letter 81-18, BWR Scram Discharge System-Clarification of Diverse Instrumentation Requirements + (BWR Scram Discharge System-Clarification of Diverse Instrumentation Requirements)
- NRC Generic Letter 80-84, BWR Scram System + (BWR Scram System)
- TSTF-478 + (BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control)
- TAC:ME9631 + (BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control)
- TAC:MD2619 + (BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control)
- TAC:ME0168 + (BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control)
- CAC:MF9289 + (Clarify Application of Setpoint Methodology for LSSS Functions)
- TAC:ME1857 + (BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control)
- EPID:L-2019-TOP-0007 + (BWRVIP-321 Acceptance Letter and Proprietary Determination)
- BWX Technologies + (BWXT)
- EPID:L-2019-DFA-0012 + (BWXT - Interim Approval of Chapter 10, Decommissioning (L-2018-LLA-0312))
- EPID:L-2020-SPR-0002 + (BWXT License Amendment 34)
- EPID:L-2022-SPR-0002 + (BWXT License Amendment 43)
- EPID:L-2022-DFA-0007 + (BWXT License Amendment 44)
- EPID:L-2023-SPR-0000 + (BWXT License Amendment 46)
- EPID:L-2021-LLA-0213 + (BWXT Nuclear Fuel Services, Inc. (Nfs), License Amendment Request for U-Metal at the NFS Site)
- EPID:L-2020-SPR-0008 + (BWXT Nuclear Fuel Services, Inc. Category II Physical Protection Plan, Revision 004, & Category III Physical Protection Plan, Revisions 007 & 008)