NRC Generic Letter 79-38, BWR Off-Gas Systems – Enclosing NUREG/CR-0727
Jump to navigation
Jump to search
text
August 22, 1979
All Boiling Water Reactor Licensees ( Except Humboldt)
Gentlemen:
The NRC staff has concluded the review of BWR off-gas systems pertaining to explosions. The staff has determined that your system, along with procedures and/or committed changes, provides reasonable assurance that the potential for external off-gas explosions is minimized.
The enclosed report, NUREG/CR-0727, "Boiling Water Reactor Off-Gas Systems Evaluation," prepared by the staff and its consultant, summarizes their evaluation and is provided for your information.
Sincerely,
W. P. Gammill, Acting Assistant Director for Operating Reactors Projects Division of Operating Reactors
Enclosure:
cc w/o enclosure:
Service List
7910110235