Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 50.59 Inspection (Saint Lucie 2021) + (50.59)
- 50.59 Inspection (Saint Lucie 2020) + (50.59)
- 50.59 Inspection (Salem 2021) + (50.59)
- 50.59 Inspection (Seabrook 2021) + (50.59)
- 50.59 Inspection (Sequoyah 2021) + (50.59)
- 50.59 Inspection (Summer 2019) + (50.59)
- 50.59 Inspection (Turkey Point 2021) + (50.59)
- 50.59 Inspection (Waterford 2021) + (50.59)
- 50.59 Inspection (Watts Bar 2021) + (50.59)
- 50.59 Inspection (South Texas 2020) + (50.59)
- 50.59 Inspection (Cook 2020) + (50.59)
- 10 CFR 51.15, 51.15 Time Schedules + (51.15 Time schedules)
- EPID:L-2022-LRM-0012 + (628918-Withdrawal Letter 21-35144-04 for Niowave, Inc)
- EPID:L-2020-LLA-0201 + (7 of the Emergency Plan for the U.S. Geological Survey Triga Reactor (Gstr) Facility (License R-113, Docket 50-274))
- EPID:L-2020-RNW-0038 + (73-Audit Plan-Rx and Accident Analysis (July 2021))
- 10 CFR 73.6, Exemptions for Certain Quantities and Kinds of Special Nuclear Material + (73.6 Exemptions for certain quantities and kinds of special nuclear material)
- 10 CFR 76.95, 76.95 Training + (76.95 Training)
- EPID:L-2021-LLA-0068 + (8 to Updated Final Safety Analysis Report, Chapter 5 Through Chapter 7)
- 10 CFR 9.6, 9.6 Communications + (9.6 Communications)
- 95001 SUPPLEMENTAL- EP Inspection (Watts Bar 2019) + (95001 SUPPLEMENTAL- EP)
- 95001 Supplemental- 2 White PIs Inspection (Grand Gulf 2019) + (95001 Supplemental- 2 White PIs)
- 10 CFR 4.301, Purpose and Scope + (Regulations Implementing the Age Discrimination Act of 1975, as Amended)
- A Della + (A Della)
- 10 CFR 14.17, A Claim Must Be Presented to the Appropriate Agency + (A claim must be presented to the appropriate agency)
- A'mia Closs + (A'mia Closs)
- A109 + (Agastat)
- TSTF-417 + (AC Electrical Power System Completion Times - WCAP-15622)
- TAC:MB2257 + (AC Electrical Power System Completion Times - WCAP-15622)
- 10 CFR 7 + (ADVISORY COMMITTEES)
- Category:Letter type:AEP + (AEP)
- TSTF-245 + (AFW Train Operable When in Service)
- TAC:MF4560 + (TSTF-2)
- 10 CFR 2, Agency Rules of Practice and Procedure + (AGENCY RULES OF PRACTICE AND PROCEDURE)
- ALARA Inspection (Braidwood 2021) + (ALARA)
- ALARA Inspection 2 (Braidwood 2021) + (ALARA)
- ALARA Inspection (Byron 2019) + (ALARA)
- ALARA Inspection (Byron 2020) + (ALARA)
- ALARA Inspection (Callaway 2020) + (ALARA)
- ALARA Inspection (Calvert Cliffs 2020) + (ALARA)
- ALARA Inspection (Clinton 2021) + (ALARA)
- ALARA Inspection (Columbia 2020) + (ALARA)
- ALARA Inspection (Comanche Peak 2019) + (ALARA)
- ALARA Inspection (Comanche Peak 2021) + (ALARA)
- ALARA Inspection (Cooper 2020) + (ALARA)
- ALARA Inspection (Cook 2020) + (ALARA)
- ALARA Inspection (Diablo Canyon 2019) + (ALARA)
- ALARA Inspection (Diablo Canyon 2021) + (ALARA)
- ALARA Inspection (Dresden 2019) + (ALARA)
- ALARA Inspection (Dresden 2020) + (ALARA)
- ALARA Inspection (Fermi 2020) + (ALARA)
- ALARA Inspection (Ginna 2020) + (ALARA)
- ALARA Inspection (Grand Gulf 2021) + (ALARA)